Res 1352-61 · , '~" RESOLUTION NO. 1352
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF DELRAY BEACH, FLORIDA, FURTHER DECLARING
%~{E INTENTION OF THIS CITY TO PROCEED WITH
THE I~EDIATE SEWAGE PROGRAM PROPOSED BY
RUSSELL & AXON, CONSULTING ENGINEERS, IN A
REPORT DATED AUGUST, 1961, AS THE BASIC SEWAGE
WORKS PROGRAM OF T}[E CITY OF DELRAY BEACH, FLORIDA
WHEREAS, it is deemed in the best interests of the City of
Delray Beach, Florida, to immediately take necessary steps to
provide for more suitable sewage facilities, and
WHEREAS, an engineering report, dated August, lg61, .has
been submitted by Russell & Axon, Consulting Engineers, which
provides for an immediate construction program for an estimated
total cost of $450,000.00, and
WHEREAS, conditions surrounding the area to be affected and
benefited by the proposed construction project demand urgent ac-
tion be taken to protect the Public Health and Welfare, and
WHEREAS, the City Council did, by adoption of Resolution
No. 1344, authorize Russell & Axon, Consulting Engineers, to
proceed with the immediate program as proposed by said engineers
in their 'Report' dated August, lg§l, and
WHEREAS, it is imperative that the proposed installation
program go forward without delay,
NOW, THEREFORE, BE IT RESOLVED by the City Council of the
City of Delray Beach, Florida, as follows:
SECTION i. That a schedule of various segments of performance
by the consulting engineers in preparation of the final plans
and specifications in accordance with the existing Contract
dated September 30, 1959, be prepared as follows:
(a) Consulting Engineers - Russell & Axon shall have con-
struction plans and specifications completed to such a
degree that will enable the Health Department of the State
of Florida to give tentative approval thereof on ox ~fore
October 23rd, lg61;
(b) Consulting Engineers - RUSSELL £~ AXON shall have con-
struction plans and specifications completed to such a de-
gree that will enable the City Council to commence adver-
tising for Bids on said project on or before November 13th,
1961, which bids shall be required to be submitted to the
City of Delray Beach on or before thirty calendar days from
date of 'Notice to Contractors' that such bids are requested.
SECTION 2. That completed plans and specifications for said
~450,000 project shall be based on an overall design for a modern
activated sludge treatment plant with all required odor control
facilities included in completed plant and plant shall be so de-
signed and constructed as not to emit objectionable odors, and
further in pursuit of this objective said consulting engineers,
RUSSELL & AXON, shall act in an advisory capacity in selection
of a qualified operator for the completed sewer plant.
PASSED AND ADOPTED by the City Council of the City of Delray
Beach, Florida, on this the 4th day of October, 1961.