Res 472 RESOLUTION
A RESOLUTION OF ~i'i~ 0ITY 00UNOIL OF TiiZ OiYY OF DEL~Y
~3.~?':~'~, FLORIDA , ~C~.~r~l~O P~i~[S ~:2(D ~ ~l~'l~.~O~ OF
TO Bi~ UOLoT~e~CTED Ih Ti-~ ALlY
.~ IC~Tlv~o. '
' "~ OT
......... ~ by the City Council the ~ty of Delray
Beach, Florida, that clans and specifications and the estimated
cost amountin?~ to Twelve Hundred and Eighty Dollars ~ladO.OO) of
the proposed sanitary sewer construction in the glley east of
Southeast Fourth Avenue and ext~
~n~mn~ from North of Th~z~ Street
to North of -~7.~o~.~,t,.~ ~ Street, be. and the saz~e is hereby acceoted.
B~ IT FUf~ESR R~,oOLVi;D that said plans dna specifications
of the omty ~ng~neer be filed with the City ler~ of the City of
Delray Beach, Florida, end also be filed in the office of the
City ~ngineer, and that same shall be open to the inspection of
the public.
PASSED AND ADOPTED by the City Council of the City of
Delray Beach, Florida, this the SSth day of April, 19~.
Pres~~
Attest:
Approved:
April 21, !9~3
Honorable City Co~uacil,
Delray Beach,
Florida.
Gentlemen:
In accordance with your instructions, I submit
herewith plans, specifications and estimated cost for the
extension of an eight inch sewer in Block
Your particular attention is called to the
elevations of buildings to be served by this sewer, one
of which u~til the raising of the house, is too low to be
served by this proposed construction.
Yours very tr,zly,
HO~ARD L. CRO~R
City Engineer
-ESTI~ATE OF COST-
~ ~" Sewer-Alley E. of S. E. ~th Ave.-N. of S. E. 3rd St. to N. of S. E. ~th Street.
MATERIAL:
Tile ................ 3 50. O0
Joint Compound ...... 70.00
Fill-lO0 Cu. yds .... Q.O0~
~20.00
Manhold and lampho!e dS.00
Labor ~75.00
Rental 150.00
Eng. ~0.00
Legal & Adv. l~O.00
$128o.0o
1.0~ per front foot
8" sewer in Blocks 102 & 103 cost.-$1.95 P.F.F.
-SPECIFICATIONS-
8" V. C. Sewer
Alley East of S. E. dth Ave.
No. ef S. E. 3rd St. to No. of S. E. 4th St.
Sewer tile shall meet the standard of A.S.T.M.
and shall be laid to true line and grade. Ele-
vations will be furnished by the City and will
conform to the attached plan and profile.
Joints are to be made up of Slip-Seal Compound
applied in accordance with the manufacturers
specifications.
Fill is to be placed over exposed tile as
directed by the City Engineer and backfill
is to be left smooth and even.
A standard City specification lamp hole is to
be constructed on the extreme south end of the
new construction as well as the standard manhole
at station 3 ~ ~0. Covers for these are to be of
concrete, cast on the site of the works.