Loading...
Res 472 RESOLUTION A RESOLUTION OF ~i'i~ 0ITY 00UNOIL OF TiiZ OiYY OF DEL~Y ~3.~?':~'~, FLORIDA , ~C~.~r~l~O P~i~[S ~:2(D ~ ~l~'l~.~O~ OF TO Bi~ UOLoT~e~CTED Ih Ti-~ ALlY .~ IC~Tlv~o. ' ' "~ OT ......... ~ by the City Council the ~ty of Delray Beach, Florida, that clans and specifications and the estimated cost amountin?~ to Twelve Hundred and Eighty Dollars ~ladO.OO) of the proposed sanitary sewer construction in the glley east of Southeast Fourth Avenue and ext~ ~n~mn~ from North of Th~z~ Street to North of -~7.~o~.~,t,.~ ~ Street, be. and the saz~e is hereby acceoted. B~ IT FUf~ESR R~,oOLVi;D that said plans dna specifications of the omty ~ng~neer be filed with the City ler~ of the City of Delray Beach, Florida, end also be filed in the office of the City ~ngineer, and that same shall be open to the inspection of the public. PASSED AND ADOPTED by the City Council of the City of Delray Beach, Florida, this the SSth day of April, 19~. Pres~~ Attest: Approved: April 21, !9~3 Honorable City Co~uacil, Delray Beach, Florida. Gentlemen: In accordance with your instructions, I submit herewith plans, specifications and estimated cost for the extension of an eight inch sewer in Block Your particular attention is called to the elevations of buildings to be served by this sewer, one of which u~til the raising of the house, is too low to be served by this proposed construction. Yours very tr,zly, HO~ARD L. CRO~R City Engineer -ESTI~ATE OF COST- ~ ~" Sewer-Alley E. of S. E. ~th Ave.-N. of S. E. 3rd St. to N. of S. E. ~th Street. MATERIAL: Tile ................ 3 50. O0 Joint Compound ...... 70.00 Fill-lO0 Cu. yds .... Q.O0~ ~20.00 Manhold and lampho!e dS.00 Labor ~75.00 Rental 150.00 Eng. ~0.00 Legal & Adv. l~O.00 $128o.0o 1.0~ per front foot 8" sewer in Blocks 102 & 103 cost.-$1.95 P.F.F. -SPECIFICATIONS- 8" V. C. Sewer Alley East of S. E. dth Ave. No. ef S. E. 3rd St. to No. of S. E. 4th St. Sewer tile shall meet the standard of A.S.T.M. and shall be laid to true line and grade. Ele- vations will be furnished by the City and will conform to the attached plan and profile. Joints are to be made up of Slip-Seal Compound applied in accordance with the manufacturers specifications. Fill is to be placed over exposed tile as directed by the City Engineer and backfill is to be left smooth and even. A standard City specification lamp hole is to be constructed on the extreme south end of the new construction as well as the standard manhole at station 3 ~ ~0. Covers for these are to be of concrete, cast on the site of the works.