Res 292 RESOLUTIOE
A RESOLUTION ACCEPTi~,iG PLAI~S AR~D ~ECiFICATIOES OF THE
CITY ENGINEER FOR CERTAIN STRUT II~ROV~/~I~T WORK TO
BE CONSTRUCTED OE LAING STREET, AND ALSO THE ESTI1LqTED
COST OF TiiE PROPOSED I~{PROVEI.~E]'~TS ~',7ilCH IS SET FORTH
ID- SAID PLANS A~D SPECIFICATIONS. ( E 536' of Laing St. )
BE IT RESOLVED By the 0ity Council of the City of
Delray Beach, Florida, that plans and specifications and the
estimated cost, amounting to $591.31 of the proposed street
improvement work be accepted.
BE IT FURTHER RESOLVED That said plans and specifications
of the City Engineer be filed with the City Clerk of the City
of Delray Beach, Florida, and that the same shall be open to
the inspection of the public, and that a copy of said plans,
specifications and estimates of cost shall be filed in the
office of the City Engineer for public inspection.
BE IT Fb~RTHER RESOLVED That said plans and specifi-
cations and estimated cost of the proposed improvements cover
the following work, to-wit:
Resurfacing that portion of Laing Street commencing at
Ocean Boulevard and running West 536 feet.
ADOPTED By the City Council of the City of Delray Beach,
Florida, this the 12th day of June, A. D. 1939.
PreSident of City co{{ncil
Attest: Appr~~ ~
C'ity Clerk Mayo¥
· une ~ th ~ 1~ 59
TO TEE MEM~MERS OF THE C IT~ COUNCIL:
In accordance with your instructions, I submit
h~rewith plans and specifications for resurfacing Laing
Street from North Ocean Boulevard, West, Five hundred and
thirty six (536') feet or to a point two hundred and twelve
(212') feet, East from the Andrews Avenue pavement.
Following are the estimated coats for same:
893.3 sq. yds. resurfacing Q $ .55 . . 491.31
Leg~l and advertising . ....... .100.00
$ 591.31
~ted
H. Cromer
Acting ~ity Engineer
ho
Specifications for paving Laing
Street frc~ the Andrews Awenue
pavement, East two hundred and
twelve feet (212').
Beginning at the Andrews Avent~ pavement the Laing
Street R/W shall be graded according to elevations furnished
by the City.
New paving is to be eight inches (8") of rock
cc~pressed to six inches (6") and thoroughly waterbound. At
Andrews Avenue returns with a twenty foo~ (20') radius are
to be provided.
Headerboards are to be set an~ allowed to remain
in place. These forms are to be 2 x 6 #l rough South Florida
Pine of at least 85% heart, or equal.
Rock used on this work shall pass State Road Depart-
ment # 2 specifications.
The entire finished road is to measure at least
fifteen feet (15') wide bet~en headerboards.
Each bid shall include the sum of ten cents (10¢)
per square yard to provide for oiling and sanding by the City.