01-30-48SpMtg JANUARY 30TH, 1948. A Special Meeting of the City Council of the City of Delray Beach was held at 4 P.M. in the Council Chambers to receive and open sealed bids for the construction of elevated tar~k founde, tious with Mayor L. H. Brannon in the Chair, and City Manager Charles-E. Biack, City Attorney John Moore, and the fo!!~ing Councilmen present: John N. Kabler, Neil E. ~cMillan, and C. J. White, a quorum being present. Sealed bids were received from three constr.action companies, as follows: 1. M. T. Crabtree, 532 Fifteenth Street, West PaLm Beach, Florida. Item No. 1. Elevated TarJ{ Foundations, including approximately 251 cubic yards of reinforced concrete with appurtenances, complete and ready for installation by others of 1/2 M.©. elevated steel tank and tc~.~er all in accordance with the detailed plans ~.nd as specified. TOTAL LIR~[P SUM BID ....................... $ 1/+,653.38 ALTERNATES TO THE TOTAL LU]~ $ID4 BID: (a) For each cubic ~rd of concrete actually installed in excess of the quantity required to meet the specifications~ a~d per cubic yard For each cubic yard of concrete not actually installed less than the quantity required to meet the specifications, deduct per c;:bic yard not installed, the sum of ................... $30.00 (b) For eac.b pound of reinforcing steel actm~lly installed iu excess of the quantity required to meet the specific~.tions, add per po~md installed~ For each pound of reinforcing steel not actually installed less than the quan±~ty required to meet the specific2~tions, deduct Der p~3nd not installed, the sum of ................... ... . 2. C!eary Brothers Construction..Co., P. O. Box 6515, West Palm Beach, Florida Item No. 1 (As above) 825 O0 TOTAL L~U~P SUM BID ....................... ~ , . ~L.T~NAT~S TO THE TOTAL LUMP SUM BID: ~ 75 OO ............................ . . (b) .............................. . o.z 3. The Murphy Construction Co., P. O. Box 825 West Palm Be~ch, Florida Item No. ! (As Above) TOT%!L LIN4P SUM BID ........................ $11,546.00 JANUARY 30~H, 1943. ALTERNATES TO THE TOTAL L~P_ S~ BID: (a) ~ ~ ~ . .... . .................... . lA tele~ from Higgins, Inc., of Sarasota, Florida, ~.ras opened and read as fo!le~s: "Janua~ 30~ 1948 Sarasota, Florida City Manager Delray Beach~ Florida ~ bid for construction elevated storage facilities D~,~ ~,~ Beach l~p s~ ~elve Thousand ~,en-ty Two Dollars and 90 ~cents. A!te~ate A concrete per ~rd less steel 40 Dollars per yard. Alternate B reinforcin~ steel 1.~ cents per po~d. Fo~! bid with proper bid bond in ~%il to you. Tfme %zenty days. HIG~]INS, INC. --G. F. Higg~s" All of the above proposals were in proper form and accomp~ied by bid bonds as required. After consideration b~ the Comueil, a motion was ~de by Co,~ci~n ~ite~ seconded ~ Couuci~n Kabler, that contract be a~rded to The M~phy Const~c- tion Co. of ~,~[est Palm Beach, Florida, as the l~est and best bidder, in the total ~o~mt of ~?11,5~6.00 and alte~ate (a) - $36.00, and alternate (b) -~0.15. Upon cs. ll of roll the motion carried unanimously. The }~yor and Clerk were authorized to execute contract with The M~phy Construction Co. on behalf of the City upon their f~nishing the req's, ired con- tract bond, and the Clerk was instructed to ret~n bid bons to the unsuccess- ful bidders. Co~ucil then adj o~ned. City Clerk APPRIZED: