Loading...
01-31-12 Workshop MeetingCITY COMMISSION CITY OF DELRAY BEACH, FLORIDA WORKSHOP MEETING - TUESDAY, JANUARY 31, 2012 7:00 P.M. DELRAY BEACH CITY HALL The City will furnish appropriate auxiliary aids an d services where necessary to afford an individual with a disability an equal opportunity to participate in and enjoy the b enefits of a service, program, or activity conducte d by the City. Contact Doug Smith at 243-7010, 24 hours prior to the program or activity in order for the City to reasonably accommodate your request. Adaptive listening device s are available for meetings in the Commission Cham bers. WORKSHOP AGENDA 1. Fiscal 2012 Budget Options 2. Commission Comments Please be advised that if a person decides to appea l any decision made by the City Commission with res pect to any matter considered at this meeting, such person will need to ensure that a verbatim record includes the testimony and evidence upon which the appeal is based. The City n either provides nor prepares such record. MEMORANDUM TO:Mayor and City Commissioners FROM:City Manager DATE:February 1, 2012 SUBJECT:AGENDA ITEM WS.1 - WORKSHOP MEETING OF JANUARY 31, 2012 FISCAL 2012 BUDGET ADJUSTMENT ITEM BEFORE COMMISSION The Commission's decision to not approve the Fire S ervice Fee Assessment Roll creates a revenue shortfall of $3,200,000 for the current year's budg et. Staff needs direction from the City Commision as to how to rebalance this budget. BACKGROUND Last summer as we were preparing the FY 2012 budget we were confronted with a situation where not only did the property tax roll decrease for the fou rth year in a row, but also several other revenue sources decreased, such as sales tax, utility tax, franchise fees and communications services tax. St aff proposed a fire service fee as a way to offset this drop in revenue without increasing the property ta x rate. The fact that the Commission was considering imposing a fire service fee was well publicized in the media at the time. The Commission ultimately d ecided to adopt a fire service fee to raise the $3,200,000 needed to balance the budget, and approv ed the budget with that revenue included. This was also publicized in the media, and was reported in t he September issue of News for Neighborhoods, which was sent to every one of the City's utility c ustomers. At that time, we received very little ne gative reaction to this proposed new fee. Notices of the amount of the proposed assessment an d the public hearing date were sent to owners of over 32,000 residential units and 994 non-residential parcels. Considering the number of ind ividual property owners notified, and the scare tactics use d in some neighborhoods regarding the assessment, t he turnout at the hearing was not surprising. It is t he opinion of staff that those who spoke at the hea ring do not represent the majority view of our community, b ut rather a minority of our citizens who adamantly oppose the assessment. Nevertheless, we are preparing options for reducing our FY 2012 budget by the needed $3,200,000. These options are calculated based on annual costs. Since we are already four months into the fiscal year, approximately one-third of the $3,200,000 has already been spent. I recommend that this one-third ($1,067,000) be covered by funds from our undesigna ted fund balance. The budget cuts are being presented on an annualized bases so that we do not start the Fiscal 2013 budget with a $3,200,000 shortfall. One option attached shows how the budget could be b alanced without cutting Fire or Police services. A second option shows how the budget could be rebalan ced with reductions in Fire and Police services included. Also in the backup for your consideration are capit al projects funded from the General Fund this year, as well as some discussion of why certain departmen ts or functions are not proposed to be cut. RECOMMENDATION I recommend that the Commission reconsider the fire service fee assessment and hold another hearing, either with a flat rate for all residential units, or the previously proposed graduated rate, and appr ove the resulting assessment. Base Calculation for FY 2012 General Fund  Budget Reduction of $3,200,000  The total adopted General Fund Budget for 2012 is $93,356,270.These calculations are  presented starting from the earlier expense total of $92,615,070.For the purposes of this  calculation the difference is not particularly significant and can be mostly accounted for by an  increase of $650,000 in the transfer to the Capital Improvement Program.The purpose of the  calculation is to answer the question,“After subtracting out those expenses which cannot be  reduced,by what percentage must the remaining expenses be reduced in order to cut $3.2  million from the FY 2012 General Fund Budget?”  Total General Fund Expenses $92,615,070   Highland Beach Fire City Funded Capital Projects –FY 2012  Atlantic Avenue Street Light Pole Replacement $50,000  Beach Beautification Plan (Pavilion –net cost)210,450  Building Maintenance (Replace A/C,roofs,upgrade lighting,misc.repairs)150,000  City Hall Chiller Upgrade 50,000  PC Replacement 95,000  Fire Self Contained Breathing Apparatus 144,500  Hilltopper Field Resodding (Repay CRA)35,000  Data Cabling and Switches (Provides increased capacity and speed)70,000  Server Memory Upgrade (We need additional memory capacity)25,000  Neighborhood Enhancements (Preservation Trust grant match funds)20,000  Parks Master Plan Update 35,000  Police Computer Room Relocation (To eliminate health risks from Halon)47,000  Police In Potential Budget Cuts to Save $3,200,000 Annually  Police and Fire Police and Fire