Res 63-15RESOLUTION NO. 63-15
A RESOLUTION OF THE CITY COMMISSION OF THE CITY
OF DELRAY BEACH, FLORIDA, MAKING
APPROPRIATIONS OF SUMS OF MONEY FOR ALL
NECESSARY EXPENDITURES OF THE CITY OF DELRAY
BEACH FOR THE PERIOD FROM THE 1" DAY OF
OCTOBER, 2015, TO THE 30"' DAY OF SEPTEMBER, 2016; TO
PRESCRIBE THE TERMS, CONDITIONS AND PROVISIONS
WITH RESPECT TO THE ITEMS OF APPROPRIATIONS AND
THEIR PAYMENT; AND TO REPEAL` ALL RESOLUTIONS
WHOLLY IN CONFLICT WITH THIS RESOLUTION AND
ALL RESOLUTIONS INCONSISTENT WITH THIS
RESOLUTION TO THE EXTENT OF SUCH
INCONSISTENCY.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION
OF THE CITY OF DELRAY BEACH, FLORIDA, AS FOLLOWS:
Section 1. That the following sums of money, attached hereto and marked Exhibit
"A", are hereby appropfiated upon the terms and conditions herein set forth.
Section 2. That, subject to the qualifications contained in this resolution, all
appropriations made out of the General Fund are declared to be maximum., conditional and
proportionate appropriations, the purpose being to make the appropriations payable in full in the
amounts herein named if necessary and then only in the event the aggregate revenues collected and
other resources available during the period commencing the 1St day of October, 2015, and ending
the 30'' day of September, 2016, for which the appropriations are made, are sufficient to pay all the
appropriations in full. Otherwise, said appropriations shall be deemed to be payable in such
proportion as the total sum of realized revenue of the General Fund is to the total amount of
revenues estimated by the City Commission to be available in the period commencing the 1't day of
October, 2015, and ending the 30t' day of September, 2016.
Section 3. That all balances of the appropriations payable out of the General Fund
of the City Treasury unencumbered at the close of business on the 30"' day of September, 2015,
except as otherwise provided for, are hereby declared to be lapsed into the City Treasury and may be
used for the payment of the appropriations which may be made in any appropriation for the fiscal.
year commencing the 1" day of October, 2015. However, nothing in this section shall be construed
to be applicable to unencumbered balances remaining to the credit of the Water and Sewer Fund,
Sanitation Fund or any Fund created by the setting up of special revenue, but such balances shall be
used in financing the proposed expenditures of these Funds for the fiscal year commencing the 1"
day of October, 2015.
Section 4. That no department, bureau, agency or individual receiving
appropriations under the provisions of this resolution shall exceed the amount of its appropriation,
except with the consent and approval of the City Commission first obtained. If such department,
bureau, agency or individual shall exceed the amount of its appropriation without such consent and
approval of the City Commission, the administrative officer or individual, in the discretion of the
City Commission, may be deemed guilty of neglect of official duty and may be subject to removal
therefore.
Section 5. That nothing in this resolution shall be construed as authorizing any
reduction to be made in the amounts appropriated in this resolution for the payment of interest on,
or retirement of, the debt of the City of Delray Beach, Florida.
Section G. That none of the monies enumerated in this resolution in connection
with the General Fund, Water and Sewer Fund, Sanitation Fund or any other Fund of the City shall
be expended for any purposes other than those for which they are appropriated, and it shall be the
duty of the Planning, Budgeting and Control Manager and/or Chief Financial Officer to report
Known violations of this section to the City Manager.
Section 7. That all monies collected by any department, bureau, agency or
individual of the City government shall be paid promptly into the City Treasury.
Section 8. That the foregoing budget is hereby adopted as the official budget of the
City of Delray Beach, Florida, for the aforesaid period. However, the restrictions with respect to the
exp enditutes/expenses of the funds appropriated shall apply only to the lump sum amounts for
classes of expenditures/expenses which have been included in this resolution.
Section 9. That public hearings were held on the budget on September 3, 2015 and
September 15, 2015.
passage.
2015.
ATTEST:
City Clerk
Section 10. That this resolution shall- become effective immediately upon its
PASSED AND ADOPTED in regular session on this the 15th day of September,
/' � 51, -
M ACY R
RES. NO. 63-15
CASH BALANCES BROUGHT FORWARD
ESTIMATED REVENUES:
TAXES
AD VALOREM TAXES
AD VALOREM TAXES
AD VALOREM -DELINQUENT
AD VALOREM - DDA
Sales & Use Taxes
Utility Taxes
Other Taxes
Franchise, Licenses & Permits
Intergovernmental
Charges for Services
Fines & Forfeitures
Miscellaneous Revenues
Other Financing Sources
TOTAL RFVENUESAND OTHER
FINANCING SOURCES
TOTAL ESTIMATED REVENUES
AND BALANCES
Mlilages
7.061 1
0.2756
1.0000
Exhibit A
Budget Summary
DOWNTOWN SPECIAL
GENERAL DEVELOPMENT ENTERPRISE REVENUE
FUND FUND FUNDS FUND'S TOTAL
3,638,820
4,039,050 0 7,677,870
53,535,470
0
0
0
53,535,470
2,090,340
0
0
0
2,090,340
50,000
0
0
0
50,000
0
692,831
0
0
692,831
1,440,000
0
0
0
1,440,000
6,070,000
0
0
0
6,070,000
3,981,000
0
0
0
3,981,000
10,347,200
0
1,700
0
10,348,900
8,231,250
0
67,750
789,680
9,088,680
11,751,000
0
42,640,310
0
54,391,310
971,850
0
0
121,250
1,093,100
7,923,190
62,000
396,260
1,697,210
10, 078,660
3,963,400
0
112,000
1,081,620
5,157, 020
161,025,273
Reserves
110,354,700
754,831
43,218,020
3,689,760
158,017,311
TOTAL EXPENDITURES AND RESERVES
113,993,520_
1133,520
754,831
47,257,070
3,689,750
165181
EXPENDITU RFSIFXPFNSFS:
General Government Services
14,362,550
0
0
0
14,362,550
Public Safety
62,063,610
0
0
121,250
62,184,860
Physical Environment
518,520
0
29,455,860
0
29,974,380
Transportation
3,866,210
0
0
0
3,866,210
Economic Environment
9,151,840
747,903
0
2,469,020
12,368,763
Human Services
47,750
0
0
52,000
99,750
Culture & Recreation
13,666,030
0
4,042,330
884,750
18,593,110
Debt Service
3,689,790
0
2,756,230
0
6,446,020
Other Financing Uses
3,959,220
0
9,170,110
300
13,129,630
TOTAL LXPLNDITURESIEXPENSES
111,325,520
747,903
45,424,530
3,527,320
161,025,273
Reserves
2,668,000
6,928
1,832,540
162,440
4,669,908
TOTAL EXPENDITURES AND RESERVES
113,993,520_
754,831
47,257,070
3,689,760
165,695,181
CoversheetPage of
??
MEMORANDUM
TO:Mayor and City Commissioners
FROM:Jack Warner, Chief Financial Officer
Lisa M. Herrmann, Planning, Budgeting and Control Manager
THROUGH:Donald B. Cooper, City Manager
DATE:August 19, 2015
AGENDA ITEM 9.D. - REGULAR COMMISSION MEETING OF SEPTEMBER 15, 2015
SUBJECT:
RESOLUTION NO. 63-15 BUDGET ADOPTION FOR FY 2016
BACKGROUND
Resolution No. 63-15 provides for appropriations of sums of money for all necessary
expenditures of the City for the period from the 1st of October 2015 to the 30th of September
2016.
The FY 2016 budget appropriations are set forth in Exhibit A of the attached Resolution No.
63-15. The budget utilizes an operating millage of 7.0611 and a debt service millage of
0.2756.
Pursuant to the City Charter and TRIM requirements, a public hearing must be held prior to
the adoption of the budget.
RECOMMENDATION
Recommend approval of Resolution No. 63-15/Final Budget Adoption for FY 2016.
http://agendas.mydelraybeach.com/Bluesheet.aspx?ItemID=9502&MeetingID=57710/6/2015
CoversheetPage of
??
MEMORANDUM
TO:Mayor and City Commissioners
FROM:Randal Krejcarek, Director Environmental Services
Isaac Kovner, City Engineer
THROUGH:Donald B. Cooper, City Manager
DATE:August 19, 2015
AGENDA ITEM 9.D.1 - REGULAR COMMISSION MEETING OF SEPTEMBER 15, 2015
SUBJECT:
APPROVAL OF FY 2016 - 2020 CAPITAL IMPROVEMENT PLAN
BACKGROUND
Consider approval of the proposed FY 2016 - 2020 Capital Improvement Program (CIP).
ESD and Finance shall present an overview of the proposed FY 2016 - 2020 CIP.
Attachment included:
1)2016 Account Spreadsheets
2)2016 Complete CIP Book
DISCUSSION
Consider approval of the proposed FY 2016 - 2020 Capital Improvement Program (CIP).
TIMING OF THE REQUEST
This agenda item is of high importance.
RECOMMENDATION
By motion, approve the proposed FY 2016 - 2020 Capital Improvement Program (CIP).
http://agendas.mydelraybeach.com/Bluesheet.aspx?ItemID=9496&MeetingID=57710/6/2015
FY 2016 CIP FINAL EDITION
INTRODUCTORY
r
CAPITAL EVORO M PROGRAM PROCESS
9. The City's five-year Capital Improvement Program is
developed and updated annually. The process begins in
March.
Z. - Each department is required to submit new project
requests and status updates for existing projects to the
Finance Department during the first week of June each year.
3, The City will have the Capital Improvement Plan
reviewed by the Capital Improvement Staff Committee
ponsisting of Department Heads, City Engineer, Assisttat
City Managers, Community Redevelopment Agency
Directdr, and City Manager.
4. The City Manager compares projects against all City
needs, City Commission major goals, anticipated funding
sources, and departmental priorities. The City Manager's
final recommendations are formulated into a balanced CIP
Program and document. Each year a number of projects are
either ,scaled back, postponed or eliminated, with that
funding being moved to other projects. Projects may also
fall behind the anticipated schedule with dollars not being
spent in the fiscal year thby were originally budgeted.
5. In an attempt to maintain a "Pay as you go" financing
program, the Treasurer and Finance Director assess the
capital investment/funding and debt implications of the
proposed program.
G. The final draft of the CIP Program is submitted for
review to the Planning and Zoning Board to assure proposed
projects are in compliance with the City's Comprehensive
Plan.
7. The City Manager's recommended CIP Program is
subsequently reviewed by the City Commission and adopted
along with the Annual Operating Budget. The CIP Program
Budget as adopted is a commitment to expenditures or
appropriations for that fiscal year only.
Capital vn ra ement Pr ram Overvie
The Capital Improvement Program is essential to ,planning
for, prioritizing, and coordinating Capital Improvement
Projects within the City's limited resources. The CIP
program is a five-year plan for the City's major projects and
expenditures.
CIP projects must have a monetary value of at least $25,000,
and a life cycle of at least five years. The project results in,
the creation of a fixed asset, or the revitalization of an
existing fixed asset.
The Capital Projects having an operating impact are
incorporated into the Annual Opeeri, ng Budget, The two
budgets are tied together in that Capital Improvement
Projects often lead to reduced or increased operating costs,
The CIP Program Includes:
• Construction of new physical facilities
• Remodeling or expansion of existing facilities
• Acquisition or development of land for a community use
• Major equipment and machinery for new or expanded
facilities
• Cost of engineering or architectural studies and services
relative to the Improvement
+ Street construction, reconstruction, resurfacing, or
renovation
The CIP Progyrom does not include:
• Normal operating expenditures for employee salaries
• Routine maintenance and repair cost
• Other activities associated with, or consumed during: a
single fiscal year
• Expenditures for capital items costing less than $25,000
Capital Project Types or Cate pries
Parks, Recreation and Leisure
Economic Growth and
Facilities
Development
Streets, Alleyways, Sidewalks
Fleet Renewal and
and Bridges
Replacement
Land Acquisition
Major Equipment Renewal
and Replacement
Library, Museum, Cultural
Joint Projects with Other
Facilities
Agencies
Beach Restoration
Beautification — Public areas "
and Medians •
Buildings and Facilities
Water and Sewer Systems
Construction, Rehabilitation
and Restoration
Neighborhood Improvement
Stormwater Drainage
and Development
Improvements
This .Fund is used to account for .all financial transactions that are not specifically accounted for in another
fund or fund group; The majority of the revenues for this -Fund are derived from taxes (property,
gasoline, franchise, utility service, and communication services) state revenue sharing and sales tag
distributions, service charges and fees, fines and forfeitures and administrative fees and charges to other
funds.
This Fund is not generally used for the purchase of major capital. improvements in order to provide
comparable financial statements from year to year. Major general capital improvements are funded in
the General Capital Improvements Fund.
The General Fund is shown, in order to present all resources available for capital improvements and to
evaluate the balance in the Undesignated Fund Balance that is an important component of the financial
policies of this City.
' I
i
SOURCES OF FUNDS:
ACCOUNT NAME
UNDESIGNATED FUND BALANCE
ICU RRENTYEAR BALANCE
DS:
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 001 GENERAL FUND
FY 2016-2020
BALANCE SHEET
MULTI
9/3/2015
FINAL
91312016
FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20
23,700,752 35,719,608 35,719,608 35,719,608 35,719,608 35,719,608
12,018,856
35,719,608 35,719,608 35,719,608 35,719,608 35,719,608 35,719,608
The net fund Increase as of July 31, 20115 Is $12,018,856, with current year expenditures
sling $86,911,525 and revenue collections of $98,930,381.
SPECIAL REVENUE FUNDS
This group o f funds is used to account for the proceeds of specific governmental revenue sources. requiring
separate accounting because of various legal stipulations, -regulatory provisions, or administrative actions.
These revenues can only be spent for specific programa or activities and, therefore, should not be co -
mingled with other unrelated revenue sources.
Special Project Funds Include;
• Law Enforcement Trust Fund
Special Project Fund
Federal Forfeiture Trust Fund
In Lieu of Parking Fees
Public Arts Program
• Recreation Impact Fee Fund
• Neighborhood Services Fund
• Beautification Trust Fund
LAY ENFORCEMENT TRUST FOD
This Special Revenue Fund accounts for the receipt of funds from confiscated property and forfeitures by
the Police Department through local law enforcement investigations. The expenditure of these funds must
comply with Florida State Statute §932.7055. Per this statute, this fund cannot project the future receipt
of funds. Such funds may be used only for school resource officers, crime prevention, safe neighborhoods,
drug abuse education, or drug prevention programs or such other law enforcement purposes as the
governing body of the municipality deems appropriate. Such funds shall not be a source of revenue to
meet normal operating needs of the law enforcement agency.
FUND NO. 112
LAW ENFORCEMENT TRUST
FUND
CITY OF DELRAY BEACH FINAL
CAPITAL IMPROVEMENT PLAN 919/2016
FY 2016 - 2020
DESCRIPTION
FY2014-15 FY2015-16 FY201647 FY2017-18 FY2018-19 FY2019-20
99,250
SOURCE OF FUNDS
16,000
Prior Year Fund Balance
388,572 514,028
Confiscated Property
239,706 121,260
State Fines & Forfeitures
Interest Earnings
Total revenues from ali souraea628,278
635,278
USES OF FUNDS
FY2014-15
FY2015-16 FY2016-17 FY2017-18 FY2018-19 FY2o1V-1U
Operating Expenses
99,250
Machinery & Equipment
16,000
25,000
Project Reserve
96,250
Total expenditures114,250
ear n a once.514,028
121,250
514,028
FEDERAL FORFEITURE FUNDS
This Special Revenue Fund accounts for the, receipt of funds generated from property and monies
confiscated through local law enforcement support of Federal investigations. The expenditure of these
funds is governed by the Civil Asset Forfeiture Reform Act of 2001 as outlined by the US Department of
Treasury's Guide to Equitable Sharing. Equitably shared funds shall be used for only law enforcement
purposes and are subject to the laws, rules, regulations, and orders of state and local jurisdictions
governing the use of public funds for law enforcements purposes. The permissible uses of these funds are
for law enforcement training, equipment, operations, police facility improvements, enhancement of future
investigations, drug education and awareness programs, and any other projects allowable by law.
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 115 FEDERAL FORFEITURS
FY 2016-2020
FINAL
9!3!2016
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
115-0000-248-99.00
Beginning Fund Balance
602,074
632,640
632,540
632,640
532,640
692,640
Forfeitures
115-0000-366-22.00
87,365
80,000
80,000
80,000
80,000
80,000
Interest on Investments
116-0000-361-10.00
Total Revenues from all sources
1,000
690,439
1,000
613,540
1,000
613,540
1,000
613,540
1,000
613,5
1,000
613,540
USES OF FUND:
FY 14/15
FY 16/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
116-1702-579-31.90
Operating
157,899
81,000
81,000
1
81,000
1
81,000
81,000
115-2112-521-99.01
Project Reserve
632,640
632,640
632,540
682,640
632,540
632,640
Special Project Funds are used to account for Federal contraband forfeitures,
held in trust by the City for a variety of Police related purposes,
Total Expenditures
L 690,439 1
613,5401
613,640
818,640
613,540
613,640
SPECIAL RQJECTS FUND
Special Projects Fund is used to account for revenue held in trust by the City for a variety of earmarked
purposes. This revenue source includes and accounts for the In Lieu of Parking Fees, Parking License
Fees, and Public Arts Program Fees.
In Lieu of Parking Fees are monies paid by a commercial property owner in -lieu of providing a required
number of do -site or off-street parking spaces, as stipulated under the City's Land Development
Regulation, Section 4.6.9 (E) (3). The fee is based on the location of the property for which in -lieu fees are
being sought. These locations arib described as area "I", area 'W', area "Y', and area "4" with
corresponding fee amounts.
Parking License Fees or "Valet Parlung Fees" are monies paid for a license to operate a parlung facility
with a valet service or operator, allowing for attendants to receive, park and deliver the automobiles of
occupants, tenants, customers, invitees, and visitors, including tandem parking.
Public Arts Program foes are Capital Improvement Project dollars used in part, to incorporate art in
certain public projects. The City appropriates 1.5% of an eligible capital project's construction costs.
The artwork or design is integrated into the architecture, City streets, and landscape throughout Delray
Beach, reflecting and enhancing the City's diversity, character, and heritage through artwork, and design.
Parking Expenses -Area "1" 75,000 75,000
75,000
75,000
76,000
75,000
Parking Expenses -Areas"2" 100,000 100,000
100,000
100,000
100,000
100,000
Parking Expenses -Areas "3" 10,000 10,000
10,000
10,000
10,000
10,000
Parking Expenses -Areas "a" 0 0
0
D
0
0
Parking Expenses 135,000 135,000
136,000
135,000
135,000
136,000
In Lieu of Parking Fees are monies paid by a commercial property owner In -lieu of
providing a required number of on-site or off atrest parking spaces.. The fee Is based on the
location of the property for which In=ileu fees are being sought. parking or Valet License
Parking Fees are monies paid for a license to operate a parking facility With a valet service
or operator, allowing for :attendants to receive, park; and deliver the automobiles of occupants,
tenants; customers; invitees, and visitors, including tandem parking. All proceeds from such
fees shall be used for parking purposes,
Total expenditures 32l ill 320,000 320,000
Year End
-
320,000
320,000
320,000
13
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 115 PUBLIC ART
FY 2016-2020
FINAL
91312016
ACCOUNT NUMBER
ACCOUNT NAME
FY 1.4/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19 FY 19/20
115-0000-248-94.06
Prior Year Reserve
61,328
51,325
61,328
51,328
61,328 61,328
115-0000-381-10.00
Interfund Transfer -General Construction Fund
68,100
114,990
38,625
104,950
90,000 -
115-0000-381-17.00
Interfund Transfer -Recreation Impact Fund
Total Revenues from all sources
i 7,428
6,622
171,94089,953
11-067
16,980 20,980
,
USES OF FUND:
11-024
18,375
CRA NW 12 Av-Atlantic1MLK
10-041
16,035
115-1702-579-31.90
Operating
68,100
120,612
36,626
104,950
90,000 -
18,000
CRA BE 2 St- Swinton BE 3 AV
13-020
12,000
CRA -SE 4th Av Beautification
16-011
Total Expenditures
Year End Balance
66,100
51,328
120,812
51,328
38,826
51,328
104,950
51,328
90,000 -
51,328 51,328
i acct nr r rdnc.
PROJECT NAME
PROM
FY 14/15 FY 15/16
FY 16/17 FY 17/18 FY 18/19 FY 19/20
GRA BLK 117 GARAGE STUDY
13-001
99,000
CRA Block 32 Alley
11-009
1,600
CRA Block 83 Alley
16-001
1,500
CRA Block 8 Alley
14-002
1,800
CRA MLK Drive Phase II
16-004
4,800
ORA NE 2 Ave ISeacrest Beaut.
11-067
16,980 20,980
GRA NE 3rd St Street Scope
11-024
18,375
CRA NW 12 Av-Atlantic1MLK
10-041
16,035
CRA Osceola Neigh Imp FY 16
16-649
4,876
CRA-DBCA Site/Park Improvmnts
16-596
18,000
CRA BE 2 St- Swinton BE 3 AV
13-020
12,000
CRA -SE 4th Av Beautification
16-011
12,000
CRA SW 1 Av-SW 1 St to Atl Av
16-582
5,950
CRA SW 10th/9th Ave Improv
14-023
2,620 3,000
CRA SW 4th Ave-Atl-SW 10th
16-669
11,250
ORA SW 8,7,8,9 Ave Atl SW 1st
16-864
3,000
CRA Swinton & Atl Intersection
12-051
22,600
CRA Veterans Park Imp
16-658
3,000
NE 2 Ave/Seacrest PH2
14-071
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 115 PUBLIC ART
FY 2016-2020
FINAL
91312016
ACCOUNT NUMBER ACCOUNT NAME FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20
NE 2 Ave/Seacrest PH3
16-646
NE 2 Ave/Seacreet PH4
16-647
PR Comm Center Rebuild
16-606 90,000
PR -Beach Master Plan FY 14115
15-008 37,800
PR-Hilltopper Field Imp.
16-661 8,622
PR -Little Fenway Park Build. 16-550
the City appropriates 1,5%of the total eligible construction costs to be used to artist design services and for the selection, acquisition and
display of artwork, and administration of the Punlio Arts Program.
TOTAL EXPENDITURES 11 120,612104,950 90,000
RECREATION IMPACT FEE F
This Special Revenue Fund accounts for the receipt of funds from the collection of parks and recreation
impact fees from developers in accordance with Chapter 5, Subdivision Regulations, Section 5.3.2(C)
(Park Land Dedication -Impact Fee Required) of the City of Delray Beach Land Development Regulations.
These funds are to be used only for the development of parks and recreation areas.
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 1.17 RECREATION IMPACT FEE FUND
FY 2016-2020
"Dcc nc c"hlnc.
FINAL
9!3/2015
ACCOUNT NUMBER
y V ACCOUNT NAME
PROM BUDGETED
FY 14/15
FY 15/16 1
FY 16/17 FY 17/18 FY 18/19 FY 19/20
PROJECT RESERVE
PRIOR YEAR FUND BALANCE
117-4161-572-63.40
REC. IMPROV-MERRITT PK RENOVATION
117-0000-301-17.00
PRIOR YEAR SURPLUS
443,680
746,098
328,176 928,676 829,176 329,678
117-0000-303-17.00
PRIOR YEAR ENCUMBRANCES
28,300
6,622
117-0000-361-10.00
INTEREST-INVE8TMENTS
600
500
500 500 600 600
117-0000-363-17.00
RECREATION IMPACT FEES
28,000
117-0000-366-70.00
CRA CONTRIBUTIONS
180,000
450,000
42lTOTALREVENUE
Y `
lere nc o inlnc.
ACCOUNT NUMBER
Vy V .. PROJECT NAME
PROM BUDGETED
FY 14/15
FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20 Page No.
117-4133-572-99.01
PROJECT RESERVE
412,030
117-4161-572-63.40
REC. IMPROV-MERRITT PK RENOVATION
14-052 230,450
488,000 65
117-4151-672-xx.xx
HILLTOPPER FIELD IMPR
16-661
374,800 67
117-9111-681-91.15
PUBLIC ART TRANSFER
6,622
117-6111-519-99,01
MISC. EXPENDITURE -PROJECT RESERVE
TOTAL EXPENDITURES/:0
868,422
YEAR END BALANCE - 328,176 328,676 329,1765 329,676 330,176
NEIGHBORHOOD SERVICES FUND
This Special Revenue Fuhd accounts for the receipt of funds from various Federal, State, and local grants
that are generally spent on programs that benefit the low- to moderate -income households within the
designated target area of the City. Particular emphasis is placed upon the preservation of existing housing
units, increasing home -ownership opportunities, and providing decent, standard infrastructures
throughout the designated target area. These funds are also used to encourage and develop public/private
partnerships.
CITY OF DELR4Y BEACH CAPITAL IMPROVEMENTS
FUND lU8 NEIGHBORHOOD SERVICES FUND
FY 2016-2020
FINAL
9/312815
ACCOUNT NUMBER
ACCOUNT NAME
SOURCES OF FUNDS:
BUDGETED
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
Prior Year Fund Balance - FY 13114
118-0000-30148.00
Prior Year Surplus
24,455
300,350
300,661
500,651
300,651
300,651
118.0000-303-18.00
Prior Year Encumbrances
42,050
35,000
35,000
35,000
35,000
35,000
118-0000-331-84.xx
Comm Development Block Grant
988,342
408,120
408,124
408,124
408,124
408,124
118.0000-334-42.00
FEMA -Residential Mitigation
239,269
118-0000-334-48.xx
Ship Program
373,770
300,650
300,661
300,651
300,661
300,651
118-0000-36140.00
Interest -Investments
35,000
26,000
26,000
25,000
25,000
118-0000-366-28.00
Miscellaneous Contributions
2,070
2,070
2,070
2,070
2,070
2,070
118-0000-366-70.53
NRC Planner/ Inspector Reimbursement
76,810
79,630
76,810
76,810
76,810
76,810
118-0000-366.70.66
Curb Appeal Program
63,939
35,000
35,000
35,000
35,000
36,000
118-0000-366-70.57
Neighborhood Stabilization Program
69,610
69,610
69,610
69,610
69,610
69,610
118-0000-366-70.93
Micro Lending
100,000
35,000
25,000
25,000
25,000
25,000
118-0000-369.51.00
Recovery of Prior Yra Exp
43,000
25,000
26,000
25,000
26,000
25,000
118-0000-388-10.00
NSP (Cash) Proceeds
126,000
80,910
80,906
80,906
80,906
80,906
118-0000-381-10.00
118-0000-366-19.01
Transfer from General Fund
149,430
149,430
149,430
149,430
149,430
149,430
lWorkforco Housing 4,694 1,440,000
TOTAL. 2,600,320 1,147,6011,147,601 + .1
1,147,601
ACCOUNT NUMBER
PROJECT NAME
FY 14116
FY 161116
FY 16117
IFY1171115
FY 18119
FY 19120
USES OF FUNDS:
118-1924-554
Ship Program -State Grant
373,770
300,350
300,661
500,651
300,651
300,651
116-1930,654
Curb Appeal
163,939
35,000
35,000
35,000
35,000
35,000
118-1931-562
Beacon Center - Village Program
52,000
118.1933-554
Workforce Housing
4,594
1,440,000
118-1930-554
Micro Lending
35,000
26,000
26,000
25,000
25,000
118-1934-564
Neighborhood Stabilization -CRA
72,235
69,610
69,610
69,610
69,610
69,610
118-1936-554
Neighborhood Stabilization -DCA
173,710
80,910
80,906
80,906
80,906
80,906
118-1936-554
FEMA -Residential Mitigation
239,269
118-1961-554
Planning Administration
79,130
79,360
81,624
81,624
81,624
81,624
118-1963-664
Housing Rehab -Federal Grant
568,877
238,870
240,282
240,282
240,282
240,282
118-1965-554
CDBG Misr. Exp -Federal Grant
43,000
25,000
26,000
25,000
26,000
25,000
118-1965-559
Micro Lending
126,000
118-1966-654
GrantslAids-Fad Grant -Econ Devel
60,750
61,220
61,218
61,218
61,218
61,218
118-1974-554
Neighborhood Housing
230,066
182,7001
228,310
1 228,310
228,310
228,310
Transfer to General Fun
TOTAL1
YEAR END BALANCE
300
2,600,320
1,147,601.11
1,147,601
1,147,601
BEAUTIFICATION TRUST FUND
This Special Revenue Fund accounts for the receipt of General Fund transfers from a 1.2% utility tag to be
used for capital and operating egpenses'ineurred in projects for the beautification of the public rights-of-
way within the city and the maintenance of such beautification projects. These projects where identified
in the Comprehensive Beautification Program. adopted by the City in 1986.
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 119 BEAUTIFICATION TRUST FUND FINAL
FY 2016-2020 91812018
AntfIZCE9 of r."mns.
ACCOUNT NUMBER
ACCOUNT NAME
PROJ# BUDGETED
FY 14/15
FY 15116
FY 16117
FY 17118
FY 18119
FY 19120
Prior Year Fund Balance - FY 13114
1
119-0000-561-10.00
Interest -Investments
600
600
600
600
600
119-0000-866-70.00
CRA
98,000
119-0000-581-10.00
General Fund Transfers
870,000
927,000
870,000
870,000
870,000
870,000
119-0000-881-41.00
WaterlSeuver Fund Transfers
5,190
6,190
5,190
5,190
6,190
6,190
TOTALREVENUE
875,690
968,190
87S,690
875,690
875,690
875,690
USES OF FUNDS:
ACCOUNT NUMBER PROJECT NAME BUDGETED FY 15118 FY 16117 FY 17118 FY 18119 FY 19120
FY 14/15
119-4144-572 Multi Operating Expenses 876,890 884,760 875,690 878,690 875,690 876,690
119-4144-672-99.01 Project Reserve 88,440
TOTAL•1 968,190 875,690 875,690 875,690 875,690
YEAR END BALANCE
BEACH RESTORATION FUND
This other Operating Fund provides services with respect to the management of the Beach Re -
nourishment Program, including Funding applications, permit acquisition,. consultant and construction
contract supervision; management of the Sea Turtle Conservation Program; and professional advice and
direction regarding naturally occurring and ongoing accretion and attrition events. The main focus of this
program is to provide for the protection and enhancement of the beach and coastal resources in
accordance with State and Federal permits,
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 332 BEACH RENOURiSHMENT GRANT FUND
FY 2016-2020
SOURCES OF FUNDS:
FINAL
91312015
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
Beach Tilling
16,050
16,050
17,000
17,000
20,000
20,000
Prior Year Encumbrances/Surplus
59,343
1,931,320
County Grants
3,510
77,000
25,515
26,012
245,142
49,431
Federal Grants
4,442,369 1
57,900
65,823 1
67,105 1
632,418
127,521
State Grants
27,280
12,5401
25,515 1
26,012 1
245,142
49,431
Transfer from General Fund
TOTAL REVENUE
62,330
4,594,832
15,000
2,016,760
52,447
169,300
45,1711
164,300
44,598
1,167,300
226,383
PROJECT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
Beach Tilling
16,050
16,050
17,000
17,000
20,000
20,000
Final & Constr Engineering
Pre/Post Constr Surveys
136,343
77,000
80,000
65,000
85,000
65,000
Pre -Construction Environmental
1,000,000
Sea Turtle Monitoring
53,150
53,160
55,000
65,000
65,000
65,000
Travel, Training, memberships
9,300
7,900
8,300
9,300
9,300
9,300
Yearly replacement (snow fence)
8,000
6,000
8,000
8,000
8,000
8,000
Bond Issuance Expense
1
59,088
Beach Renourishment Note Interest
16,582
1,841,980
Beach Renourishment Note Principal
TOTAL
4,355,407
•4 ;32
14,680
2,016,760
169,300
164,300
1,167,300
226,383
YEAR END BALANCE - - - -
CAPITAL PROJECTS FUNDS
This group of funds is used to account for the acquisition, construction or renewal and replacement of
major capital facilities, infrastructure improvements or the purchase of major equipment other than that
financed or funded entirely from user -fee fund operations such as Enterprise and Internal Service Funds.
GENERAL CAPITAL RO)IMENT FUND
This Capital Projects .Fund is used to account for the acquisition, construction or renewal and replacement
of major capital facilities, infrastructure* Improvements or the purchase of major equipment of a general
City nature other than that financed or funded entirely from proprietary user -fee fund operations such as
Enterprise and Internal Service Funds,
Project Categories include:
• Streets, Alleyways, Parking Lots, Bridges and Sidewalks
• Building Construction/Rehabilitation
• Beautification
• Parrs and Recreation
ip Facilities Maintenance
• Building and Equipment Renewal and Replacement
• Other Improvements
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND
FY 2016-2020
FINAL
91312015
ACCOUNT NO.
ACCOUNT NAME
PROM BUDGET -FY 14/15
FY 15/16
FY 16/17 FY 17/18 FY 18/19 FY 19/20 PG. NO.
SOURCES OF FUNDS:
Prior Year Fund Balance - FY 13114
334-0000-303.34-00
Prior Year Encumbrances
7,265,242
3,706,527
334-0000-301.34-00
Prior Year Surplus
1,881,560
* Federal Grants:
334-0000-331-62.06
Federal Hwy Beautification
1,493,234
* State Grants:
334-0000-334-62.15
NE 2nd AvlSeacrest Beautification
598,340
334-0000-334-xx.xx
NE 2 Ave/Seacrest PH2
267,427
3340000-334-xx.xx
NE 2 AvelSeacrest PH3
350,167
334-0000-334-xx.xx
NE 2 Ave/Seacrest PH4
369,376
* Community Redevelopment Agency Contributions
334-0000-368-70.xx
ADA PED AU. Ave. and 2nd Ave
25,000
334-0000-366-70.18
BLK 117 Garage Study
750,000 6,600,000
334-0000-366-70.47
Block 20 Alley Improvements
40,000
384-0000-866-70.68
Black 32 Alloys
100,000
334-0000-366-70.96
Block 63 Alley
34,637
100,000
334-0000-366-70-85
Block S Alley
1,927
120,000
334-0000-366-70.87
Sidewalks/Bikeways FY 16-20
8003000
200,000
900,000 300,000 300,000 300,000
334-0000-366-70.79
Downtown Tree Grate Replacement
153220
334-0000-366-70.98
E Atl /Venetian Signal
125,000
334-0000-366-70.90
E Ati Av Ped Improvements
160,000
334-0000-366-70.97
E AtllGleason Signal
125,000
334-0000-366-70.89
E Atlantic Av Median
1,130
30,000
334-0000-366-70.67
Fire HQ Public Plaza
276,000
3340000-366-70.46
MILK Jr Drive Phase 11
320,000
334-0000-366-70.70
NE 2 AvelSeacrest Beaut.
52,514
800,000
3340000-356-70.68
NE 3rd Street Scapa
650
1,000,000
334-0000-366-70.68
NW 12 Ave-AtianticlMLK
700,000
334-0000-366-70.xx
NW1SW Nbrhd Alley
300,000
3340000.366-70.99
NW1SW Neighborhood Alley PH 2
100,000
334-0000-366-70.08
Osceola Alleys Phase 2
141,267
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND
FY 2016-2020
FINAL
9/3/2015
ACCOUNT NO.
ACCOUNT NAME
PROM BUDGET -FY 14/15
FY 15/16
FY 16/17 FY 17/18 FY 18/19 FY 19/20 PG. NO.
334-0000-366-70-xx
Osceola Neigh Imp FYI
175,000
275,000
334-0000-366-70-xx
DBCA Rehab
300,000
954-0000-366-70-xx
DBCA Site/Park Improvmnts
1.200.000
334-0000-366-70.94
Parking Study Impl Prof
215,000
834-0000-366-70-xx
PR Veterans Park Imp
200,000
334-0000-366-70-xx
3 Swinton-SW1E iat Signal
250,000
334-0000-366-70.10
BE 1 at St Conversion to 2 -Way Traffic
18,955
334-0000-366-74.02
BE 2nd it/SW Swinton BE 3rd AV-Oscaoia
1,025,000
334-0000-366-74.03
BE 4th Ave Beautification
100,000
800,000
334-0000-366-70-xx
SW 1 AV -SW 1 St to Atl Av
63,500 396,500
334-0000-366-70.92
SW 1oth19th Ave Improv
17,710
200,000
334-0000-966-70.91
SW 2nd Terr
66,000
334-0000-366-70-xx
CRA -SW 2nd Street Phase 2
200,000
334-0000-366-70-xx
SW 4th Ave -AU -SW 10th
100,000
750,000
334-0000-368-70-xx
SW 6,7,6,9 Ave Atl SW tat
200,000
334-0000-366-70-xx
SW14 Ave SW 2nd St 3rd St
100,000
334-0000-366-70.73
Swinton & Atlantic Intersection
9,900
200,000
1,400,000
334-0000-386-70.95
TCRPC LDRS-Treasure Coast
* Interfund Transfers
334-0000-381-10.00
Received from General Fund
176,290
379,927 350,167 369,375
Donation:
834-0000-366.11.08
Hobbit Skate Park
260,000
334-0000-366-11.09
Beach Beautification
40,000
834-0000-366-51.07
Fed Hwy Beautification -1.1 p Town Delray
24,109
Financing:
834-0000-384.14-00
Fire Diesel Exhaust Sys
313,000
$34-0000-384.14-00
FS 2 Generator Upgrade
100.000
334-0000-384-14.00
FSI#3 Rebuild
600,000
4,000,000
334-0000-384-14.00
IT Disaster Recovery
194,000
934-0000-384-14.00
IT HR Payroll System
300,000
21
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND
FY 2016-2020
FINAL
91312015
ACCOUNT NO.
ACCOUNT NAME
PROM BUDGET -FY 14/15
FY 15/16
FY 16/17 FY 17/18 FY 18/19 FY 19/20 PG. NO.
334-0000-38414.00
IT- Sans Storage Disks
30,000
334-0000.381-14-00
IT -Camp Equip RIR (FY 15-20)
125,000
260,000
260,000 260,000 125,000 125,000
334-0000.384-14.00
IT -ERP Strat Plan Upgrade
1,500,000
334-0000-384-14.00
IT-VolP Phone System
1,100,000
334-0000-384.14-00
New Financial System
900,000
334-0000-384-14.00
PD AED's
90,000
334-0000-38414.00
PD In -car VideolEquip. Vsh.
100,000
334-0000-384-14.00
PD Laptop Replace
61,054
334-0000-384-14.00
PD Laptop Replace
550,000
334-0000-384-14.00
PD Motorola System
6,000,000
334-0000-38414.00
PO Noritau Photo Printer Rep
36,000
334-0000-384-14.00
PD P251Motorola Radio Repl
2,469,977
334-0000-384-14.00
PD Patrol Vehicle GPS
161,500
334-0000-384-14.00
PD Security Cameras
250,000
3340000-384-14.00
PD Sound Polygraphllnt. RM.
28,900
334-0000-384-14.00
PR Ballflelds Control Sys
60,000
334-0000-384-14.00
PR Comm Center Rebuild
25,000 900,000 5,100,000
834-0000-384-14.00
PR Hllltopper Lights R&R
175,300
Transfer from the General Fund
334-0000-381-10.00
PR -Teen Center Roof Repl
100,000
$34-0000-381-10.00
Debt Financing
92,000
334-0000-384-37.49
2015 LIM Rev REFIIMP BND
15,100,000
+675,000
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 934 GENERAL CONSTRUCTION FUND
FY 2016-2020
FINAL
913/2015
ACCOUNT NO.
ACCOUNT NAME
PROM
BUDGET -FY 14/15
FY 15/16
FY 16/17 FY 17/16 FY 18/19
FY 19/20 PG. NO.
ACCOUNT NUMBER
PROJECT NAME
PRO]#
FY 14/15
FY 15/16
FY 16/17 FY 17/18 FY 18/19
FY 19/20 PAGE NO
USES OF FUNDS:
334-3962-541-65.36
Barwick Road
16-058
79,879
334-4141-572-68.83162
Beach Beautification
105,970
334-6112-519-31.30
City Hall Lobby Makeover
13-083
579
334-6111-519-63.90
City Wide Master Sign
14-005
25,000
334-3162-541-xx.xx
CRA -ADA PED Ati. Ave. and 2nd Ave
16.650
26,000
89
334-3151-545-31.901xx CRA -B LK 117 Garage
13-001
400
760,000 6,601,000
71
334-3182-541-68.66
CRA -Block 20 Alley Improvements
2009-06
40,000
334-31182-541-xx.xx
CRA -Block Alloys 32
98,600
73
334-3162-541-68.98
CRA -Block 63 Alley
15-001
34,637
98,500
75
334-3162-541-68.96
CRA -Block 8 Alley
14-002
10,326
118,200
77
334-3162-541-63.11
CRA- Dist Sidewalks FY 15
16.002
300,000
334-3162-541-61.17
CRA Sidewalks FYI
16.672
200,000
300,000 300,000 $00,000
300,000 79
334-3162-541-68.99
CRA -E At]lVenetian Signal
14-078
125,000
334-3162-541-63.11
CRA -E At! AV Ped Improvements
14-008
48,006
160,000
81
334-3162-641-68.99
CRA -E AtllGleason Signal
14-077
125,000
$34-3162-541-61.15
CRA -E Atlantic AV Median
14-007
1,130
30,000
83
334-2311-522-68.71
CRA -Fire HQ Public Plaza
11-017
275,000
334-3162-541-68.57
CRA-MLK Drive Phase II
15-004
315,200
85
334-3162-541-68.78
CRA -NE 2 AvelSeacrest Beaut.
11-067
28,435
1,377,360
87
334-3162-541-68.72
CRA -NE 3rd Street Scrape
11-024
130,206
981,625
89
334-3162-541-68.60
CRA -NW 12 Av-Atlantic1MLK
2010-41
56,319
584,965
91
334-3162-541-68.98
CRA-NWISW Neighborhood Alley
15-040
100,000
300,000
93
334-3162-541-66.85
CRA -Osceola Alleys
13-015
141,267
334-3i82-541-xx.xx
CRA -Osceola Neigh Imp FY 16
16-649
175,000
270,126
96
334-4161-572-xx.xx
CRA- DBCA Rehab
16-514
300,000
97
334.4161-572-xx.xx
CRA-DBCA Site/Park Improvmnts
16-596
1,182,000
99
$34-3162-541-34.65
CRA -Parking Study Impl Proj
14-089
215,000
101
334-4126-572-63.90
CRA -PR Veterans Park Imp
16-688
197,000
103
334-3162-541-68.32
CRA -S Swinton -SWIS E ist Signal
13-022
37,857
250,000
105
334-3162-541-66.88
CRA -SE $ NE iatStOne-Way Pair
2004-06
18,955
334-3162-541-68.30
CRA -SE 2 St- Swinton BE 3 AV-Constr
13-020
27,180
1,013,000
107
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND
FY 2016-ZOZO
FINAL
9/3/2015
ACCOUNT NO.
ACCOUNT NAME
PROM
BUDGET -FY 14/15
FY 15/16
FY 16/17
FY 17/18 FY 18/19 FY 19/20 PG. NO.
334-3182-541-69.25
CRA -SE 4th Av Beautification -Design
15-011
100,000
788,000
109
334-3182-541-xx.xx
CRA -SW 1 Av-SW i St to Atl Av
16-582
63,500
390,550 111
$34.3162-541.68.95
CRA -SW 1Othl9th Ave Improv -Design
14-023
17,710
197,000
113
$34-8162-641-68.94
CRA -SW 2nd Terr
14-024
7,749
65,000
;..115
334-3162-541-xx.xx
CRA -SW 2nd Street Phase 2
15-676
200,000
398
334-3162-541-xx.xx
CRA -SW 4th Ave-Ati-SW 10th
16-669
100,000
738,750
117
334-3162-541-xx.xx
CRA -SW 6,7,8,9 Ave Atl SW let
16-854
197,000
119
334-3162-541-xx.xx
CRA-SW14 Ave SW 2nd St 3rd St -Design
16-855
100,000
121
334-3162-541-68.86
CRA -Swinton & Atlantic Intersection
12-061
12,911
200,000
1,377,500
123
334-3162-641-68.62
Fed Hwy Beautlflcatlon
2009-09
6,810,840
334-2311-522-84.90
Fire Diesel Exhaust Sys
14-089
337,750
334-2311-522-68.71
Fire HQ Public Plaza
11-017
3,432
334-2311-522-64.90
Fire -Zoll E Series
18,000
334-2311-522-64.90
FS 2 & 3 Generator Upgrade
64,230
334-2311-522-64.90
FS 2 Generator Upgrade
16-571
100,000
125
334-2311-522-64.90
FS 5 Generator R&R
14-011
50,000
334-2311-522-xx.xx
1`593 Rebuild
16-613
600,000
4,000,000
127
334-6111-519-31.90
ILA -Treasure Coast/City/CRA-Land Dev Regulation
63,750
334-6111-619-xx.xx
IT HR Payroll System
16-642
300,000
129
334-6112-619-64.12
IT- Office Equipment
15-003
7,870
384-6111-619-xx.xx
IT- Sane Storage Disks
15-613
30,000
131
334-6111-619-64.11
IT -Comp Equip RIR (FY 15.20)
167,400
260,000
260,000
260,000 125,000 125,000 133
334-6112-519-64.11
IT -Disaster Recovery
16-640
134,000
135
334-6112-619-xx.xx
IT -ERP Strat Plan Upgrade
16-641
1,500,000
137
334-6112-619.64.11
IT -OMS Server Replacement
14-013
1,575
334-6112-519-xx.xx
IT-VoIP Phone System
16-644
1,100,000
139
334-3162-541-68.84
NE IatAv Improvements
12-042
88,554
334-3162-541-68.78
NE 2 Ave/Seacrest PH2
14-071
106,624
634,854
141
334-3162-541-xx.xx
NE 2 Ave/Seacreat PH3
16-646
700,834 143
334-3162-541-xx.xx
NE 2 Ave/Seacrest PH4
16-647
112,500
738,760 145
334-6111-519-66.16
New Financial System
12-012
900,000
384-4161-572-64.90
OSS Gym AC R&R
14-016
80,000
334-2111-621-xx.xx
PD AED's
16-593
90,000
203
334-2111-521-xx.xx
PD In -car Video/Equlp. Veh.
16-562
100,000
211
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND
FY 2016-2020
FINAL
9/3/2015
ACCOUNT NO.
ACCOUNT NAME
PROM
BUDGET -FY 14/15
FY 15/16
FY 16/17 FY 17/18 FY 18/19 FY 19/20
PG. NO.
$34-2115-621-44.30
PD- Laptop Lease Purchase
550,000
334-2115-521-xx.xx
PO Laptop Replace
15-006
61,054
147
334-2111-521-64.32
PD Motorola System
15-007
6,000,000
334-2111-521-xx.xx
PD Noritsu Photo Printer Rep
16-553
36,000
215
334-2111-621-xx.xx
PD P251Motorola Radio Repl
16-564
2,459,977
149
334-2111-521-xx.xx
PD Patrol Vehicle GPS
16-596
161,500
151
334-2111-521-xx.xx
PD Security Cameras
15-565
250,000
163
334-2911-521-xx.xx
PD Sound Polygraph/Int. RM.
16-667
28,900
166
334-2111-521-48.20
PD -A1C Replacement -PD Roof Top -Balance Due
25,935
334-2111-621-63.90
PD -Range Roof
14-016
50,000
334.4151-672-xx.xx
PR Ballfields Control Sys
16-600
60,000
223
334-4125-572-62.10
PR Comm Center Rebuild
16-606
25,000 900,000 5,010,000
157
334-4151-572-31.90
PR -Beach Master Plan FY 14116
15-008
75,000
334-4144-572-63.20
PR -Beach Master Pian
2,962,600
334-4173-572-62.10
PR -Little Fenway Park Build
11-022
420,500
334-4173-672-xx.xx
PR Hllltopper Lights R&R
16-611
175,300
226
334-4151-672-68.24
PR -Hobbit Skate Park
15-009
250,000
334-4123-672-62.14
PR -Lifeguard Towers
14-019
72,000
159
334-4151-572-31.90
PR -Parks Master Plan
12-044
60,140
334-4127-672-62.10
PR-Pampey Bldg Rercof
14-020
276,330
334-4119-672-xx.xx
PR -Teen Center Roof Rapl
16-668
100,000
256
334-3162-541-31.90
Sign Warrant Studies
15-080
7,900
334-3162-541-61.17
Street ResurflReconstr-
11-108
2,604
334-3162-541-61.17
Street Resurfacing FY 15
14-022
251,290
334-9111-681-91.01
Transfer to General fund
334-3162-641-31.30
Transport Element Upgrade
14-094
33,616
334-9111-581-91.15
Trnafrto Special Fund-Publlc Arts
55,100
114,990
38,625 104,950 90,000
334-xxxx-xxx-xx.xx
Expenses -PY Encumbrances
3,706,627
334-6611-681-99.01
Contingency - Project Reserve
8,000,000
334-7111-519-71.43
Debt Service -General Construction Note-Princ
7,522,170
334-7111-519-72.43
Debt Service -General Construction Note -Int
71,064
334-7111-519-71.43
Debt Service- Financing
92,OD0
a
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND FINAL
FY 2016-2020 913/2015
UnscheduledlUnfunded Pro'ects
This section identifies those requested General Capital Improvement Fund projects which have not been
funded in the five year plan.
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND
FY 2016-2020
FINAL
91312015
ACCOUNT NO. ACCOUNT NAME PROM BUDGET -FY 14/15 IFYIS/16 I FY 16/17 1 FY 17/18 1 FY 18/19 FY 19/20
334-3162-641-xx.xx
Barwick Road -Sidewalks
16-504
185,000
160,000
160,000
161
334-6111-519-xx.xx
Bldg for Christmas Tree
16-580
40,000
163
334-6111-672-xx.xx
Bridge Repair & Maint
16-520
50,000
50,000
50,000
50,000
50,000
165
334.4125-572-xx.xx
Comm Ctr Roof Repair
16-869
25,000
167
334.4161-672-xx.xx
DBCA Digital Signage
18-612
240,000
169
334-6111-619-xx.xx
Electric Board & Signs
16-509
25,000
179
334-6111-619-xx.xx
Electronic Charging Stat
16-661
25,000
173
334-3162-641-xx.xx
FEC Pedestrian Gates
16-522
60,000
60,000
60,000
60,000
175
334-2311-622-xx.xx
Fire -Training Center
16-604
216,000
191,000
177
334.2311-522-xx.xx
FS Hard Floor Installment
16-575
50,000
179
334-4144-572-53.20
FS Lifeguard Towers
16-678
77,400
77,400
77,400
77,400
181
334-2311-522-xx.xx
1FS#1 Apparatus Floor Res
16-574
39,660
183
334-2311-622-xx.xx
FS#1 Kitchen Remodeling
16-551
25,000
185
334-6111-619-xx.xx
Historic House Repairs
16-660
25,000
25,000
25,000
25,000
26,000
187
334-6112-519-xx.xx
HR/RisklChamber Renovate
16-620
60,000
340,000
489
384.6111-519-xx.xx
IT Online Plan Review
16-643
300,000
191
334-6112-619-xx.xx
Lobby-ist FI Restroom Imp
16-619
30,000
170,000
193
334-3162-641-xx.xx
NE 8th Av Paving
13-060
84,300
195
3343162-641-xx.xx
Pave Alleyway
16-570
125,000
197
334-2111-521-64.90
PD A/C R&R
16-550
35,000
80,000
199
334.2111-621-xx.xx
PD Add. RMS License
16-563
37,500
201
334-2111-521-xx.xx
PD ALPR Cameras Project
16.651
75,000
76,000
205
334-2111-621-xx.xx
PD Computer Room Relocate
16-652
260,000
207
334-2111-621-xx.xx
PD Impact Door Windows
16-663
46,000
209
334-2111-621-xx.xx
PD Latent Print Station
16-666
76,000
213
334-2111-621-xx.xx
PD Range Track Syst. Repl
16-560
80,000
217
334-2111-621-xx.xx
PD Tactical Obs. Platform
16-568
73,000
219
334-4161-572-xx.xx
PR Atl Dunes Nature TO
16-586
25,000
183,564
221
334-4151-672-xx.xx
PR LED Message Signs
16-601
254,700
227
334-4173-572-62,10163
PR Fenway Concession Bldg
10-100
227A
334-4173-572-63.90
PR Miller Park Gas Mit
16-597
38,206
216,495
229
334.4173-572-63.90
PR Miller Park Shade Syst
16-592
90,000
231
334.41xx-672-xx.xx
1PR Office Expansion
16-587 1
13,500
90,000
233
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND
FY 2016-2020
FINAL
91312015
ACCOUNT NO.
ACCOUNT NAME
PROW
BUDGET -FY 14/15 FY 15/16
FY 16/17
FY 17/18
FY 16/19
FY 19/20
PG. NO.
334-4127-572-xx.xx
PR Pompey Gym PA Syst
16-602
25,000
235
3344127-672-xx.xx
PR Pompey Pk Shade Syst
18-688
66,000
237
334-4127-672-xx.xx
FOR Pompey Pool Redesign
14-027
54,000
306,000
239
334-4173-572-62.10
PR-Hilitopper New Bldg
16-599
58,500
331,500
241
334-6112-519-xx.xx
PW Keyless LocklEntry System
15-648
25,000
26,000
25,000
25,000
243
334-6112-619-xx.xx
PW Looker Rm Maintenance
16-614
25,000
245
3346112-519-xx.xx
PW Parking
16-607
55,000
247
334-3162-541-46.90
RR X -Ing Annual Malnt (FY 15- 19)
16-010
76,000
75,000
75,000
75,000
75,0001
249
334-3162-541-61.17
Signalized Crosswalk
16-628
60,000
261
334-3162-541-xx.xx
St Lt Upg BE 7 Ave 2nd St
16-667
25,000
253
334-3162-541-65.80 Traffic Calming Measures 16-623 70,000 50,000 50,000 60,000 50,000 267
934-3162-641-xx.xx lZeder Av 16-674 1 1 1 1 120,000 $80,000 1 259
2007 PARKS & RECREATION BOND FUND
The 2007 Utilities Tax Revenue Bonds Fund is used to account for the financing of various parks and
recreation projects, Fire Station #4, Environmental Services Building (in part), and to refund the City's
2005 Line of Credit (which was used to fund the Old School Square parking Garage Project).
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 380 2004 G.O.Bond
FINAL
FY 2016-2020
91312015
SOURCES OF FUNDS:
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
Fund Balance
274,3041
274,304
274,304
274,304
1
274,304
274,304
380-0400-303-37.00
Prior Year Encumbrances
1,050 1
TOTAL REVENUE
275,354
274,304
274,304274,3041
USES OF FUNDS:
ACCOUNT NUMBER
PROJECT NAME
FY 14/15
FY 15/16 1
FY 16/17
FY 17/1$ I
FY 18/19 1
FY 19/20
380-4150-572-31.90
Other professional Services
1,060
380-4150-672-99.01
1 Project Reserve
TOTAL EXPENDITURES
1,050
ENTERPRISE FUNDS
This group of funds is used to account for the acquisition, construction or renewal and replacement of
major capital facilities, infrastructure improvements or the purchase of major,equipment funded from net
operating revenues. Enterprise funds are business -type activities financed primarily from user fees such
as utility (water, garbage, sewer, and stormwater) rates, rents or other similar charges.
Enterprise .I,t unds:
• City Marina Fund
• Water and Sewer Fund
Water and Sewer New Capital
Water and Sewer Connection Fees
Water stud Sewer Renewal and Replacement Fund
• Municipal Golf Course Fund
• Lakeview Golf Course Fund
0 Stormwater Utility Fund
CITY MARINA FUND
This Enterprise ,Fund accounts for the acquisition, construction or renewal and replacement of major
capital facilities, infrastructure improvements or the purchase of major equipment funded from the net
operating revenues of the municipal marina. The primary source of revenues for this Fund come Brom the
rental of twenty four (24) slips at the marina plus interest earnings from the investment of marina reserve
funds.
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 426 MARINA FUND
FY 2016-2020
Ktl)1 pri:R [7F Fl1Nnn.
FINAL
913/2016
ACCOUNT NUMBER
ACCOUNT NAME
BUDGETED
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
92,390
92,390
FY 14/15
92,390
426-4311-581-99.01 Project Reserve 387,382
76,820
73,690
73,690
426-0000-301-42.00
Prior Year Surplus
350,270
62,970
62,970
62,970
62,970
52,970
428-0000-329-xx.xx
Other LloenselFseslPermlts
1,600
1,700
1,700
1,700
1,700
1,700
428.0000-347-51.00
Wastewater Pump Station
3,100
8,100
3,100
3,100
3,100
3,100
426-0000-347-61.00
Marina Dock Fees
213,000
213,000
213,000
218,000
213,000
213,000
426-0000-347-82.00
Late Fees
800
300
300
300
300
300
426-0000-361-10.00
Interest on Investments
450
460
460
460
460
460
428-0000-382-26.00
Comm -King Coin Laundry - Rent
250
200
200
200
200
200
426-000-869-00.00
Imlso.Revenue
200
300
1 300
3001
3001
300
TOTAL REVENUE 569,370 219,050 219,050 219,050 219,050 219,054
l ICER CIF Fl INf'1C•
ACCOUNT NUMBER PROJECT NAME ProjN FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
Multi Operating Cost 182,168
90,260
92,390
92,390
92,390
92,390
426-4311-581-99.01 Project Reserve 387,382
76,820
73,690
73,690
73,690
73,690
428.4311-572-91.01 Transfer to General Fund 49,850
62,970
62,970
62,970
62,970
52,970
TOTAL! !
219,050
219,0 0
219,050
719,050
219,050
YEAR END BALANCE
KIM
ffATER/SEWER-NEW CAPITAL OUTLAY
WATER AND SEWER CONNECTION FEE PROJECTS
WAIEWSFWFTA-MIH CAPITAL OUTLAY PROD + CT5
This Enterprise Fund accounts for the acquisition and/or construction of nqw (as apposed to replacement)
capital facilities, infrastructure improvements or the purchase of new, original equipment funded from the
net operating revenues of the water/sewer system.
WATEHISl WER CONNECTION FEE PROJEQTN
This Enterprise Fund also accounts for fee collections, fund reserves, and expenditures of water and sewer
connection fees for projects associated with increasing the capacity and ratings of either the water or
sewer utility system. These Capital projects would include adding new raw water wells, additions or
modifications to the water treatment plant, the wastewater collection and disposal systems or the
expansion of the City's reclaimed water system.
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 441 WATER/SEWER NEW CAPITAL
FY 2016.2020
Srltil1m; OF FUNDS!
FINAL
91312016
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
FY 19/20
Page
No.
Prior Year Fund Balance FY 13/14
441.6181-638-49.28
eo a m Water Cultemer Connection Fly
14115
16.014
220,000
441-0000-301-xx.xx
Prior Year Surplus
3,637,883
1,600,000
1,630,000
1,660,000
2,760,000
2,605,000
441-0000-303.41.00
Prior Year Encumbrances
119,106
Mull
Revenue from Current Operations
16.013
1,700,000
1,800,000
1,800,000
1,600,000
1,800,000
441.0000-343-34.00
Water Connection Charges
100,000
100,000
100,000
100,000
100,000
100,000
441-0000-343-52.00
Bawer Connection Charges
150,000
260,000
260,000
250,000
260,000
260,000
TOTAL REVENUE 3,906,969 3,550,000 3,790,000 3,700,000 4,900,000 4,755,000
USES OF FUNDS:
ACCOUNT NUMBER
PROJECT NAME
ProJ#
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
Page
No.
441.6181-638-49.28
eo a m Water Cultemer Connection Fly
14115
16.014
220,000
220,000
220,000
220,000
220,000
261
441.6101-688-49.28
Reclaim Water Customer Connection
24,641
441-6181-638-96.96
Reclaim Water Transmission FY 14116
16.013
125,000
441-6161-638-68.73
Reclaim Water, Area 12A
14-029
7,180
441-6161-638-88.79
Reclaim Water, Area 12B
12-009
1,198,905
1,200,000
263
441-6161-638-xx.xx
Reclaim Water, Area 120
12-615
140,000
1,460,000
265
441-6161-636-xx.xx
Reclaim Met Pian Update
18.539
80,000
267
441-6181-689-xx.xK
Real. Water Area 6
16-638
130,000
1,060,000
269
441-6161-636-xx,xx
Real. Water Area 10
16-696
286,000
1,200,000
271
441.6161-636-xx.xx
Reel. Water Area 8
18-594
90,000
600,000
273
441-6191-638-
SCRWWTP City Cont.
16.636
500,000
660,000
600,000
650,000
700,000
275
441-5181-638-86.96
Reclaim WaterTranemission
819,734
441-6181-638-34.83
OCR -Reclaim $ Deepwell
2007-39
11,009
Project Reserve
1,600,000
1,830,000
1,660,000
2,760,000
2,806,000
2,036,000
[ 1 U I AL tAFtIVU I I UKtJ .5,7u17,JUy 3,77U,UUU 3, I Ou,uuu ],l UU,l1VU
ATERISE ER -BENE AL AND REPLACEMENT FU
This Enterprise .Fund accounts for the construction of projects or the acquisition of equipment meant to
maiatain, replace or upgrade current water and sewer infrastructure. This would include the water plant,
sewer plant, raw water wells, storage facilities, transmission and sewer lines, pumps and pump stations
And manholes as well as equipment such as meters, backflow devices, fire hydrants, and other equipment
for either field or office operations.
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 442 - WATER/SEWER NEW CAPITAL FUND
FY 2016-2020
inllRr..FC nF FUND5.
FINAL
91312016
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20
FY 14/15
FY 15/16
FY 16/17
Page
FY 17/18 FY 18/19 FY 19/20 No.
Prior Year Surplus FY 13114
AbancIdDemo. LS 80
442-0000-301-24.00
Prior Year Encumbrance
3,044,081
Prior Year Surplus
Prior Year Surplus 1
1 2,798,365
Transfer from WIS Fund
Transfer from WIS Fund
6,681,7401 5,123,000 3,125,000 2,700,000 2,875,000 2,700,000
t5,123,000
3,125,000 Z,700,000 2,875,000 2,70t),000
USES OF FUNDS:
ACCOUNT NUMBER
PROJECT NAME
Proj11
FY 14/15
FY 15/16
FY 16/17
Page
FY 17/18 FY 18/19 FY 19/20 No.
442-6178-636-xx.xx
AbancIdDemo. LS 80
16-543
100,000
277
442-5178,636-64.46
Automated Mir Rdng (AMR) FY 14
12-013
6,613,617
442.6178.68&98.70
CRA -Block 32 Alley
11-009
75,000
442-6178-63&61.20
Equipment s¢1,000
20,000
442-6178-63&68.93
Delray Shores W1M PH 2
14-030
1,487,205
442.5178.686-xx.xx
Delray ShoresWlM PH 3
16.054
91,000
968,000 279
442.6178-636-xx.xx
EI Dorado Ln WM Upgrade
16-061
225,000
261
442-6178-639-Kx.xx
Elev Tank Malnt (16-20)
16-629
70,000
26,000
25,000 26,000 26,000 283
442.6178-638.46.90
Elev Sirg Tnk Malni
15-016 1
19,500
442-6178-639-68.62
Fed Hwy Beautification
2009.009
351,569
442-6178-68&63.88
Force Main Replacement
14-039
479,064
442-6176-630-xx.xx
Golf Club Estates Wtr Swr
13-088
226,000
1,276,000
287
442-6178-63646.26
Hydrant Flushing FY 15
16-018
70,000
-
442-6176-636-xK.xx
IT Cartegraph OMS
16-839
140,000
289
442-5178-636-44.30
IT-Dlsastar Recovery
16-640
33,000
136
442-6178-636.66.10
IT -ERP etrat Plan Upgrade
16-841
260,000
137
442-6176-630-64.90
IT-YoIP Phone System
1&644
60,000
139
442-6178-686-xx.xx
Lake Ida Drain Study
13-072
275,000
291
442-6176-636.31.30
Levis Cave Rd Drainage
14-065
25,009
442-6178-638-xx.xx
Llft Station 1 Upgrade
16-632
160,000
600,000
293
442-6178-636-xx.xx
Lift Station Rehab 18-20
18-831
76,000
76,000
75,000 76,000 76,000 296
442-6176-586-68.16
LS Wet Well Rehab FY 14
14-033
90,378
442-5175-63&68.16
LS Wet Well Rehab FY 16
15-017
60,362
442.6176.636-68.63
LS Wet Well Rehab FY 14
61,700
442-6175-63&68.63
LS Wei Well Rehab FY 16
16.018
13,000
70,000
70,000
70,000 70,000 70,000 297
442-6176-53648.24
Repair Sewer Maine
26,000
442-5178,538-68.64
N Lake Ida Area WM
2010-069
26,880
442.6178-636-88.78
CRA -NE 2 Ave/Seacrest Beaut.
11-067
30,000
442-5178-686-66.78
NE 2 AvelSenoreat PH2
14.071
26,000
76,000
141
442-6178.636-xx.xx
NE 2 AvalBescrest PH3
16.646
26,000
75,000 143
442.6178,636-xx.xx
NE 2 AvelSeacrest PH4
16-647
75,000
250,000 146
442-6178-636-88.72
CRA -NE 3rd St Street Scapa
11-024
100,000
89
442-6178-636.84.16
New Financial System -Comp Equip
12-012
30,900
442-6178-63&68.60
CRA -NW 12th AviAilantlaIMLK
2010-41
8,586
1 76,000
91
442-6178-638-xx.xx
NW lot Ave NW 2nd Ave WM
16-633
160,000
299
442-6178-638-xx.xx
INW 17th Stra9t WM Upgrade
16-634
106,000
301
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 442 - WATER/SEWER NEW CAPITAL FUND
FY 2016-2020
SOURCES OF FUNDS:
FINAL
9/312016
AOCOUNT NUMBER
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19 FY 19/20
442-6178-686-xx,xx
NW 4th Ave WM Upgrade
16-060
75,000
808
442-6176,636-88,76
NW 4 Av & 3 Av WM
11-042
608,630
442-6176-639-xx.xx
NW 9th Ave WM Upgrade
16.053
106,000
305
442-5178-539.66,85
Osceola Park WM Ph2
2010-082
279
442-5178-58846.90
Other RepairlMaint Coat
76,000
442-6178-688.88.14
Prdctn Well Rehab FY 14
14-036
70,800
442-6176-636.88.14
Prdctn Well Rehab FYI 6
1s-019
200,000
442-6178-698-68.14
Prdcin Well Rehab FY 16-20
15.535
150,000
150,000
160,000
100,000 100,000
307
442-6178.63&xx.xx
Prospect St WM Upgrade
16-836
120,000
809
442-6178.630-64.90
PU Generator Rplomt FY 16
15-042
75,000
76,000
76,000
75,000
75,000 75,000
511
442-6178-53&xx.xx
Reclaimed Water, Area 12B
12-009
70,000
293
442-6178-636-xx.xx
Reclaimed Water, Area 12C
12-815
120,000
285
442.5178-536.63,62
Sen Swr Manhole Rehab
15-020
64,233
50,000
60,000
60,000
60,000 50,000
313
442-6178-636-xx.xx
San Swr Main Rehab
16.021
100,000
100,000
100,000
100,000 100,000
315
442.6178-638-88.61
Sewer Maine
26,566
442.6178-636-46.24
San Swr Main Rehab FY
13-033
61,400
442-6178-638-68.94
SW 2nd Terr
14-024
71,629
76,000
116
442-6178-630-xx.xx
SW 11th Av WM
16-637
120,000
817
442-6178-638-xx.xx
SoRWWTP City Cont, R&R
18-540
84,000
84,000
84,000
64,000 84,000
319
442-6178-639-xx.xx
Sunshine Dr WM
16-062
226,000
321
442-6178-636-xx.xx
System 68A Force Mn Rplomt
14-039
175,000
323
442-5178-580.68.97
Tropic Palms WM Ph 1
14-031
778,494
-
442-517B-638-88.97
Tropic Palms WM Ph 2
15-022
166,000
773,000
325
442-6170-636-88.97
Tropic Palms WM Ph 3
16.608
99,000
660,000
327
442-6176-698-xx.xx
W MTR RR Lrg Meters FY 15-20
16-638 1
16,000
15,000
16,000
15,000 16,000
829
442-6178-636-31,90
Water Dist Syst Eva1 FY 15-20
16-023
110,000
150,000
60,000
160,000
160,000 150,000
$31
442-6178-636-64.90
Water Line Fluehers
15-024
90,293
-
442-6178-63&68.60
Water Maine
18,635
442.6178-68&01.61
Water Mir RIR Srvos FY 16 -20
16-025
60,000
60,000
60,000
50,000
60,000 50,000
35-
442.51178-63649.38
Water Service Reioo FY 14
14-041
8,950
442-6178-638-49.33
Water Service Reloo
15-026 1
26,000
26,000
26,000
26,000
25,000 26,000
336
442.6178-536-31,30
Water SupplylFacllllles Plan Update
14-079
36,581
442-6178-58849.34
Water Valve RIR
15-027
36,000
36,000
36,000
38,000 86,000
387
442-6178-636-84.90
WTP Ammonia Tank Rpomt
16-028
30,000
80,o00
339
442-6178-586.04.90
WTP Bleach Tank FY 15
15-029
50,000
50,000
341
442-6178-539.66.92
WTP Clarifier 1&3 Rehab
14-043
160,000
442-5178-588-86.92
WTP Clarifier Rehab
15-030
176,000
176,000
343
442-6178-63848.90
WTP Filter Orn Valve
16.031
65,000
86,000
50,000
50,000
60,000 50,000345
442-6178-638.64.90
WTP Lime Slacker Rplomt
16-032
161,000
200,000
347
442-6178,638-99.91
Project Reserve
71,000
86,000
688,000
1,060,000 1,795,000
YEAR END BALANCE
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 441- WATER/SEWER NEW CAPITAL FUND
FY 2016-ZOZO
SOURCES OF FUNDS:
ACCOUNT NUMBER I ACCOUNT NAME I I FY 14/1S IFY 15/16 1 F 16/17 IFY 17/18
FINAL
91=016
ACCOUNT NUMBER t ACCOUNT NAME I I FY 14/15 1 F 15/16 1 F 16/17 1 F 17/18 IFY 18/19 1 F 19/24
442-6178-638-xx.xx lZeder Av 10-674 zsu,uuu
442-6178-836-xx.xx I NE Bth Ave Paving 13-080 60,000
MUNICIPAL GOLF COURSE FUND
This Enlerprise Fund accounts for the construction of projects or the acquisition of equipment meant to
maintain, replace or upgrade the main golf course, its facilities, vehicles, or equipment located off
Homewood Boulevard. The primary sources of revenues for this Fund are user fees related to use of the
golf course, the clubhouse, or the restaurant.
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 445 - DELRAY BEACH MUNICIPAL GOLF COURSE FUND
FY 2016-2020
CnuRCfs OF FUNDS!
FINAL
91312015
ACCOUNT NUMBER
ACCOUNT NAME
PROJO FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
445.4761-572-63.40
Prior Year Fund Balance
112,000
445-4761-572-46.10
Building Maintenance
66,000
85,000
445-0000-301-45,00
Prior Year BurplusiDeOoil
488,110
570,890
445-7111-582-71.xx
Debt6ervloo-Bands
978,270
407,800
445-0000-303-45.00
Prior Year Enoumbroncos
81,070
28,960
0
136,553
308,441
618,860
445-0000-347-xx.xx
Revenue from Current operations
8,046,290
9,129,440
3,192,0291
3,256,0591
8,920,967
8,387,406
445-0000-362-41.xx
Rental Income
27,660
28,840
29,190
30,0661
986
5
81,697
441-0000-369-xx.xx
Mlso Revenue
20,780
29,730
30,826
90,981
91,660
32,1$1
445-0000-336-41.00
State Gasoline Tax -Refund
1,780
1,780
1,764
1,760
1,760
1,760
TOTAL REVENUE 3,543,470 3,860,150 3,253,294 3,455,169 3,693,695 3,969,914
WWI; OF FUNDS!
ACCOUNT NUMBER
PROJECT NAME
FY 14116
FY 1611e FY 18117 FY 17!18 FY 18119 FY 19120
445-4761-572-64.90
MsohfEqulp(<$25,000)-FV1448
14-045 72,000
843,000 100,000 1003000 100,000 190,000
445.4761-572-63.40
Recreational Improvements
112,000
445-4761-572-46.10
Building Maintenance
66,000
85,000
multi
Other Operating Costs
2,877,130
2,989,940 2,998,741 3,029,728 8,069,015 8,089,606
445-7111-582-71.xx
Debt6ervloo-Bands
978,270
407,800
446-7111.682.72,xx
DebtBervlce-Debt service Int
81,070
28,960
445-9111-581-91.01
General Fund Transfer
18,000
18,000 13,000 18,000 18,000 18,000
'Leasing new golf carts In 15-16 ($260,000 shown above In MachMquip)
"FY 15-16 Includes $4,000,000 for golf course restoration Including Irrlga0on replacement projected to go to debt service
LAKEVIE'W GOLF COURSE FUND
This Mit'erprise Fund accounts for the construction of projects or the acquisition of equipment meant to
maintain, replace or upgrade the Lakeview Golf Course, its facilities, vehicles or equipment. The primary
sources of revenues for this Fund are user fees related to use of the golf course, the clubhouse or the snack
bar.
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 446 - LAKEVIEW GOLF COURSE FUND
FY 2016-2020
cntlRrFc nF Furans!
FINAL
91312018
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
446-7111-682-xx.xx
Prior Year Fund Balance
164,820
91,070
446-0000-301-39.00
Prior Year Surplus/Deficit
149,110
73,920
30,000
22,239
52,082
89,738
446-0000-303-48.00
Prior Year Encumbrances
668,790
671,050
676,912
582,681
688,508
694,393
446-0000-347-xx.xx
Revenue from Current Operations
663,800
666,540
668,861
682,024
895,694
709,578
446-0000-336-41.00
State Gasoline Tax -Refund
600
500
500
500
500
500
448-0000-359-99.00
Miscellaneous Revenue
5,000
5,000
6,000
6,000
5,000
6,000
TOTALREVENUE
808,410
734,960
674,151
709,7634.
804,916
I ISFC nF RINDS!
ACCOUNT NUMBER
PROJECT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
446-7111-682-xx.xx
Debt Service -Bonds
164,820
91,070
446-7111-682-xx.xx
DebtServloe-Cart Lease
30,000
32,840
30,000
30,000
30,000
30,000
446-47xx-672-xx.xx
Other Operating Costs
668,790
671,050
676,912
582,681
688,508
694,393
445-4781-672-84.90
LV Gulf Course Equip -FY 14-18
40,000
35,000
40,000
40,000
40,000
40,000
445-9111-581-91.01
General Fund Transfer
6,000
6,000
5,000
5,000
6,000
6,000
TOTAL EXPENDITURES
808,410
734,960
651,912
657,681
663,508 669,393
STORMMATER UTILITY FUND
This Enterprise Fund accounts for the construction of projects or the acquisition of equipment meant to
maintain, replace or upgrade the present stormwater system. The primary source of .revenue for this
Fund is the stormwater utility assessment fee. This fee is assessed and placed on the County Ad Valorem
Tax bill each year.
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 448- STORM WATER FUND
FY 2016-2020
FINAL
913/2016
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19 FY 19/20
SOURCES OF FUNDS:
448.0000-301-49.00
Prior Year Project Surplus
786,406
1,650,460
448-0000-309-49,00
Prior Year Encumbrances
644,287
68,690
74,640
349
448-0000-343-61.00
Revenue from Storm Water Charges
2,205,780
2,206,766
2,586,120
2,200,000
2,200,000 2,200,000
448.0000-343.62.00
Delinquent Storm Water Service Chrg
1,000
4,000
4,000
4,000
4,000
448-0000-338-eD.00
Interest from Tax Collector
500
500
500
500
600
448-0000-361-22.00
Delinquent Storm Water Service Interest
5,000
2,000
2,000
2,000
2,000
448-0000-361-10.00
Interest from Investments
10,000
53,170
10,000
10,000
10,000
448.0000-3XX-XX,XX
i Fed Grant - Lakeview Drainage Imp.
16-619
I
85,000
I
I 100,000
TOTAL REVENUE 3,552,933 3,915,890 2,602,620 2,216,500 2,216,500 2,300,000
ACCOUNT NUMBER
PROJECT NAME
Proj##
FY 14/15
FY 15/16 FY 16/17
FY 17/18 FY 18/19
FY 19/20 Page No.
USES OF FUNDS:
448-5461-538-68.55
Alley Drainage Improv
2009-16
108,700
448-5461-538-68.82
Ailey Drainage Improv,
41-113
68,690
74,640
349
448-5461-538-31.30
Barrier Island Drainage Study
13-053
692
446-5461-538-68.18
Basin Pump Sto Upgrade
16-033
21,700
100,000 75,000
351
448-5461-538-68.56
CRA -Block 20 Alley Improv
2009-06
4,930
448-5461-538-68.70
CRA -Block 82 Alley
11-009
71,000
73
448-5461-538-68.96
CRA -Block 8 Alley
14-002
123,074
448-5461-538-xx.xx
City Swalea
16-619
85,000
100,000 100,000
100,000 353
448-7111-582-71.xx
Debt Service
53,650
448-7111-638-xx.xx
Debt Service -Bonds
406,840
448-5461-538-xx.xx
Delhaven Drainage Imp.
16-510
150,000 355
448-5461-538-69.30
Dover 11-awson Culvert Rpl
14-100
216,470
448-5461-538-46.43
Drainage Swalea -FY 15
123,145
A48-5461-536-68.52
Fed Hwy Beautification
2009-009
353,378
448-5461-536-68.71
Fire HQ Public Plaza
11-017
49,500
448.6461.538.31.30
Forest Rd Drainage
13-061
110,000
44B-5461.53B.xx.xx
ICWW Flap Gales
16-515
20,000 20,000
357
448.5461.538-49.90163.90
Iris Drive Drainage
14-082
1343455
448-5461-538-44.30
IT -Disaster Recovery
16-640
33,000
135
448-5461-538-66.10
IT -ERP Strat Plan Upgrade
16-641
250,000
137
448.5461.538-64.90
IT-VOIP Phone System
16.644
50,000
139
448.5461.536.65.98
Lake Ida Area
15,167
44B.5461.53B.31.301xx,xx
Lake Ida Drainage Study
13-072
$85
445,000
291
44B-5461-638-xx.xx
Lakeview Drainage Impr
16-513
25,0001
100,000 1 359
448-5461-538-31.30
Lewla Cove Rd Drainage
14-065
19,600
448-5461-538-46.47
I LLWD L-33 Culvert
16-063
26,500
1 100,000
361
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 448- STORM WATER FUND
FY 2016-2020
FINAL
91312015
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
448-5481-538-xx.xx
Mlsc Storm Improvements
16-625
15,000
16,000
16,000
15,000
15,000
363
448-5461-630.68.84
NE tat Av Improv
12-042
3,326
448-5461-638.68.78
448-5461-538-68.78
448-5461-638-xx.xx
CRA -NE 2 Avel8eacrest Beaut,
NE 2 AvelSeacroat PH2
NE 2 AvelSeacreat PH3
11-067
14.071
16-646
30,000
50,000
76,000
100,000
141
143
448-5461-538-xx.xx
NE 2 AvelSeacreat PH4
16-647
250,000
75,000
145
448-5461-538.68.72
CRA -NE 3rd St Strout Scope
11-024
125,000
89
448-5461-538-63.90
NE 7th Av Alley
15-035
92,000
448-5461-538-64.15
New Financial System
12-012
5,201
448-5461-538-68.60
CRA -NW 12th Ave-AtlanticlMLK
2010-041
26,898
227,380
91
448 -5400 -Multi
Operating Expenses
1,104,372
1,053,820
967,220
957,220
957,220
967,220
448-5461-538.65.85
Osceola Alloys Phase 2
13-015
162,664
448-5461-53B-xx.xx
Osceola Neigh Imp FY 18
16-649
50,000
95
448-5461-538-63.90
Other Improvements
12,585
448-5461-538-xx.xx
Palm Trail South Drainage
16-505
76,000
365
448-5461-538-99.01
Project Reserve
2,450
4,880
79,880
103,380
44B-5461-538-xx.xx
Pump Ste Rehab
16-624
125,000
140,000
140,000
175,000
170,000
367
448-5461-538-xx.xx
Reclaimed water, Area 129
12-009
75,000
263
448-5461-538-xx.xx
Reclaimed Water, Area 12C
16-547
200,000
265
448-5461-538-68.30
CRA -SE 2 St -Swinton -SE 3 Av
13-020
225,000
107
448-5461-538-69.26
CRA -SE 4th Av Beautification
15-011
30,000
200,000
109
448-5461-538-xx.xx
Seawall Repairs
16-603
40,000
100,000
369
448-5461-536.31.90
Storm Water Madlfications
13-077
3,636
448-5461-538-68.18
Storm Wtr Pmp Stat. Rehab
67,910
448-5461-538-xx.xx
CRA -SW i Av-SW 1 St to All Av
16-582
50,000
111
448-5461-538-68.96
SW 10thl9th Ave Improv
14-023
47,030
448-5461-638-68.94
SW 2nd Tarr
14-024
52,355
448-5461-538-68.86
Swinton 8 Atlantic Inters
12-051
62,000
73,000
100,000
123
448-5461-538-xx.xx
Thomas Pump Sta Upgrado
16-605
100,000
65,400
371
448-5411-581.91.01
transfer to General fdlAdm Sharelln-lieu
1 1
368,480
629,400
629,400
629,400
629,400
629,400
1 TOTAL EXPENDITURES
2,552,933
:90
2,602,62f)
2,216,500
2,216,500
2,300,000
YEAR END BALANCE
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 448- STORM WATER FUND
FY 2015-2020
FINAL
913!2016
ACCOUNT NUMBER I ACCOUNT NAME I I FY 14/15 I FY 15/16 1 FY 16/17 FY 17/18 1 FY 18/19 IFY 19/20
Eli 01,111011 lizi 1111=14211*0
PROJECT NAME Proj# I FY 14/15 IFY 15/16 IFY 16/17 IFY 17/18 1 FY 18/19 IFY 19/20
NE 8th Ave Paving
13-060
75,000
195
LIOR Mapping Updates
16-625
100,000
373
NE 6th Ave Alley Imp
16-529
300,000
375
Ralnberry Woods Drainage
16-506
45,000 255,000
377
Storm Sewer Cleaning
16-517
50,000 50,000
50,000 50,000
50,000 379
Zeder Av
TOTALr . PROJECTS
16-674 1
1 1
495,000305,000
1 50,000
S0,000 175,000
259
0 Oo1
`f
INTERNAL SERVICE FUNDS
This frond group is used to account for the financing of services provided by one department to other
departments or divisions within the City of Delray Beach, on a cost reimbursable basis.
Internal Service Fund Include; ti..
• Garage Fund
CENTRAL GARAGE FUND
This Fund accounts for the reservation of funds collected from various departments for the replacement of
existing fleet vehicles and other pieces of rolling stocL In addition, this Fund also accounts for major
restoration of fleet vehicles meant to extend the useful life of the asset.
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 501 - CITY GARAGE FUND
FY 2016-2020
Frf171Z"'Ka] 2011A 4_1
FINAL
91312015
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15
FY 15116
FY 16/17
FY 1.7/18
FY 18/19
FY 19/20
501-0000-369-06.00
Vehicle Rental Fees
2,043,330
2,091,190
2,252,776
2,375,415
2,603,687
2,637,859
501-0000-301-50.00
Prior Year Project Reserve
864,765
63,337
150,052
514,439
501-0000-303-50.00
Prior Year Encumbrances
411,366
125,000
381
501-0000-365-10.xx
Sales Scrap
3,000
10,000
10,000
10,000
10,000
10,000
501-0000-361-10.00
Interest Earnings
6,000
6,000
6,000
6,000
6,000
6,000
501-0000-364-xx.xx
Proceeds -Sale of Surplus Property
75,000
85,000
96,000
105,000
115,000
125,000
501-3312-591-64.25
TOTALREVENUE
3,403,463
2,192,190
2,363,775
2,559,752
2,784,739
3,293,298
ACCOUNT NUMBER
PROJECT NAME
PROM FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20 Pg No.
501-3312-591-46.xx
Repair and Maintenance
23,670
501-3312-591-64.25
Street Sweeper
222,605
501-3312-591-64.25
Street Light Bucket Truck
16-501
125,000
381
501-3312-591-64.25
Parks Trash Compactor Truck
16-502
95,000
383
501-3312-591-64.26
Fire Dept -Brush Truck
303,800
501-3312-591-64.25
Fire Dept -Horten Ambulance
322,300
501-3312-591-64.25
Fire Dept -Horten Ambulance
272,417
501-3312-591-64.25
Fire Dept- Fire Engine FY 14-15
604,700
501-3312-591-64.25
Fire Dept -Aerial Apparatus FY 14-15
750,000
501-3312-591-64.25
Fire Dept -Fire Engine FY 16-20
625,000
641,600
660,800
690,800
501-3312-591-64.25
ALS Rescue Repl. FY 16-20
295,000
333,600
343,900
354,500
365,500
501-3312-591-64.25
Dump Truck 772
115,000
501-3312-591-64.25
Dump Truck 442
115,000
501-3312-591-64.20
Vehicle Replacement- FY 16-20
997,088
950,000
946,538
1,100,000
1,150,000
1,250,000
501-3312-591-64.21
Vehicle Restoration - FY 16-20
75,000
75,000
75,000
75,000
75,000
75,000
501-3311-591-99.01
Project Reserve
TOTAL 13,403,463
135,683
27,190
2,192,190
63,3371
2,363,7752,784,739
150,0521
514,4391
1,502,798
YEAR END BALANCE
ACCOUNT NUMBER ACCOUNT NAME FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20
501-3312-591-64.25 Fire Dept -Aerial Apparatus FY 16-20 825,000
501-3312-591-64.25 PD 15 Seat Passenger Van 30,000 385
501-3312-691-64.25 PD Water Vessel - 28' Contender 109,500 389
501-3312-591-64.25 Tactical Obs. Platform 16-568 73,000 391
Note: FY2014/15 Fire Engine and Aerial Apparatus Replacements Deferred
FY2015/16 Replacing 200130, 200531
FY2016/17 Replacing 200734, 200564, 9192
FY2017/19 Replacing 200735, 200766
FY2018/29 Replacing 200350, 200865
FY2019/20 Replacing 200832, 200864
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Multispace Parking Meters
Project Location:
Beach and Parking Lots
Project Number: 16-531
Project Start Date:
Project End Date:
Projects Description:
Replace old multispace parking meters in the parks. 15 x $15,000 = $225,000 Install new multispace parking meters on
the beach. 25 x $15,000 = $375,000 Install new multispace meters In DSS Parking Garage. 10 x $15,000 - $150,000
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
110,000.00
110,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
110,000.00
$110,000.00
PROJECTED REVENUES
Five Year Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018.19
FY2019-20
Totals
001: General Fund
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
110,000.00
110,000.00
CRA
09/03/15
09/03/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
LED Light Upgrades
Project Location:
Parking Garages In City
Project Number: 16-662
Project Start Date:
Project End Date:
Projects Description:
Upgrade lighting in parking garages to LED OSS Garage Federspiel Garage (UNFUNDED)
;PROJECTED. COSTS
Five Year Ca
ttal Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018.19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
25,000.00
25,000.00
25,000.00
25,000.00
25,000.00
125,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
25,000.001
25,000.00
25,000.00
25,000.00
25,000-001
$125,000.00
PROJECTED REVENUES
Five Year Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19 FY2019-20
Totals
001: General Fund
25,000.00
25,000.00
25,000.00
25,000.00 25,000.00
125,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
1 09/03/15
TOTAL. PROJECTED REVENUES
25,000.04
25,000.40
25,000.00
25,000.00
25,000.04
$125,000.00
OPERATIONAL IMPACT AtOUNT
Five Year capital Pro ram
.
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
09/03/15
Department/Division
Public Works
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
OSS Gar Sealant FYI 6-20
Project Location:
OSS Garage
Project Number: 16-610
Project Start Date:
Project End Date:
Projects Description:
Replace expansion joints and seal concrete. FY 2015-2016 - Floor #2 FY 2016-2017 - Floor #5 FY 2017-2018 - Floor #4
FY 2018-2019 - Floor #3 FY 2019-2020 - Floor #2 (UNFUNDED)
PROJECTED COSTS
.. - Five Year Ca ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
225,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
45,000.001
45,000.001
45,000.00
45,000.00
45,000.001
$225,000.00
PROJECTED REVENUES
Five..Year Capital:program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
001: General Fund
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
225,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
09/03/15
TOTAL PROJECTED REVENUES 45,000.001
45,000.00
45,000.00
45,000.001
45,000.00
$225,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
09/03/15
Department/Division
Community Redevelopment Authority
Parks and Recreation
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
PR-Merritt Park Renovate
Project Location:
Project Number: 14-052
Project Start Date:
Project End Date:
Projects Description:
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
488,000.00
488,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
488,000.00
$488,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
117: Recreation Impact Fee
38,000.00
38,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank FinancinglOther
CRA
460,000.00
450,000.00
( .5 07/18/15
TOTAL PROJECTED REVENUES488,000.00
$488,000.00
OPERATIONAL IMPACT ACOUNT
Fire Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-1 S
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/18/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Hilltopper Field Imp.
Project Location:
2501 Seacrest Ave.
Project Number: 16-551
Project Start Date:
Project End Date:
Projects Description:
New field lighting, new irrigation, lazer grading of field, and new sod. Existing field lighting does not meet required
footcandle specifications to host NAIA tournament. Existing irrigation is inadequate for soccer field and poses a
physical threat to players (exisitng irrigation uses metal golf course heads). NAIA Soccer Championships
commitment through 2015, bid submitted 2016 & 2017 by Palm Beach Sports Commission In May 2015. Lighting
estimate with 30 year warranty (using existing poles)= $124,800 irrigation & sod replacement estimate $250,000
Total Project Cost estimate: $374,800
PROJECTED COSTS
Five.Year. C. pitaM Program_
Classification
FY2015-16
FY2016.17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
374,800.00
374,800.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
5,622.00
5,622.00
TOTAL PROJECTED COSTS
380,422.00
$380,422.00
PROJECTED REVENUES
Fine Year Caital Program
p g
Revenue Source(s)
FY2015.16
FY2016-17
FY2017-18
FY2018.19
FY2019-20
Totals
117: Recreation Impact Fee
380,422.00
380,422.00
Federal Grants
State Grants
County Grants
6 7 07/31/15
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
380,422.00
$380,422.00
OPERATIONAL IMPACT ACOUNT
-Five Year. Capital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/31/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
ADA PED Sign 2nd Ave
Project Location:
Atlantic Ave. and 2nd Ave.
Project Number:
16-650
Project Start Date:
Project End Date;
Projects Description:
Install ADA pedestrian friendly crosswalk signals on 1st and 3rd Ave. and Atlantic Ave.
PROJECTED COSTS
Five
Year Capital
Program
Classification
FY2015-16
FY2016-17
FY20.17-18
FY2018-19
FY2019-20
Totals
Land Ac uisition
Engineering/Architect Design/ Preliminary Stud
Construction) Buildings/ Other Improvements
25,000.00
25,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
25,000.00
$25,000.00
PROJECTED REVENUES
Five
Year Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
25,000.001
1
25,000.00
07/18/15
TOTAL PROJECTED REVENUES 1 26,000.00
$25,000.00
OPERATIONAL IMPACT ACOUNT
Five
Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/18/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
BLK 117 Garage Study
Project Location:
SE 6th Ave
Project Number: 13-001
Project Start Date:
Project End Date:
Projects Description:
Begin design of new parking structure on Block 117. Construction timeframe undertermined at this time,
PROJECTED COSTS
Five Year Ca Ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
750,000.00
750,000.00
Construction/ Buildings/ Other Improvements
6,501,000.00
6,501,000,00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
P
99,000.00
99,000.00
TOTAL PROJECTED COSTS
1750,000-0016,600,000,001
$7,350,000.00
PROJECTED REVENUES
l=ive Year Ca ital Program
Revenue Sources
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
750,000,00
6,600,000.00
7,350,000.00
1 08/03/15
TOTAL. PROJECTED REVENUES
1750,000.0016,600,000-001
$7,350,000.00
OPERATIONAL IMPACT ACOUNT
'Five Year Ca ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$o -o0
08/03/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
05/03/2010
Project Title:
Block 32 Alley
Project Location:
Block 32 is bounded by SW 4th and SW 5th
Av and SW 3rd and SW 4th St
Project Number: 11-009
Project Start Date:
10/04/2010
Project End Date:
Q9/30/2011
Projects Description:
Pave approximately 300 ft of unpaved alley to provide access to existing developed single family homes. Upgrade 2"
water main and provide adequate drainage.
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
244,500.00
244,500.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
1,500.00
1,500.00
TOTAL. PROJECTED COSTS
246,000.00
$246,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016.17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital improvements
442: Water/Sewer Renewal and Replacement Fund
75,000.00
75,000.00
448: Stormwater Utility Fund
71,000.00
71,000.00
Federal Grants
State Grants
County Grants
1 07/18/15
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
100,000.00
100,000.00
TOTAL PROJECTED REVENUES
1246,000.001
$246,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/18/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
08/11/2014
Project Title:
Block 63 Alley
Project Location:
Block 63
Project Number: 15-001
Project Start Date:
Project End Date:
Projects Description:
Provide Design work for the paving of the alley. Between SW 2nd and SW 3rd St and Swinton and SW 1st Ave.
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
98,500.00
98,500.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingent
1,500.00
1,500.00
TOTAL PROJECTED COSTS
100,000.00
$100,000.00
13130,180TED R5VENUES
, .., FiVe Year. Ca ital. Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
100,000.00
100,000.00
5 07/10/15
TOTAL. PROJECTED REVENUES
100,000.00
$100,000.00
OPERATIONAL IMPACT ACOUNT
Flys Year Ca itai. Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL. PROJECTED OPERATING COST
$0.00
07/10/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
Block 8 Ailey
Project Location:
Project Number: 14-002
Project Start Date:
Project End Date:
Projects Description;
Pave unpaved alley In Block 8 and 20. This alley Is bounded by SW 11th Ave and SW 10th Ave on the west and east as
well as SW 1st St and W Atlantic Ave on the south and north.
PROJECTED COSTS
Five Year Ca Tial Program.
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
118,200.00
118,200.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
1,800.00
1,800.00
TOTAL PROJECTED COSTS
120,000.001
$120,000.00
PROJECTED REVENUESFive
Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
448: Stormwater Utility Fund
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
_ f 08/15/15
CRA
120,000.00
120,000.00
TOTAL PROJECTED REVENUES
120,000.00
$120,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca , ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Daae Submitted
Project Title:
CRA Sidewalks FY16
Project Location:
CRA District Wide
Project Number: 16-672
Project Start Date:
Project End Date:
Projects Description:
Construct sidewalks within CRA District
PROJECTMCOSTS
so . . Fivd Year:CapitaE Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
30,000.00
45,000,00
45,000.00
45,000.00
45,000.00
210,000.00
Construction/ Buildings/ Other Improvements
170,000.00
255,000.00
255,000.00
255,000.00
255,000.00
1,190,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
200,000.00
300,000.00
300,000.00300,400.00
300,000.00
$1,400,000.00
PROJECTED',REVENUES
FiveYearCa i#al Program .'
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
200,000.00
300,000.00
300,000.00
300,000.00
300,000.00
1,400,000.00
-1 X101 08/19/15
TOTAL PROJECTED REVENUES
200,000.QQ
300,000.00
300,000.00 300,000.00 300,000.00
$1,400,000.00
OPERATIONAL IMPACTACOUN7
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totais
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/19/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
E Atl Av Ped Improvements
Project Location;
East Atlantic Ave.
Project Number: 14-008
Project Start Date:
Project End Date:
Projects Description:
Provide cross walks and truncated domes along E Atlantic Ave east of Gleason Street as per 2010 Parking Study.
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
160,000.00
160,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
160,000,001
$160,000.00
PROJECTED REVENUES
Five Year Ca
ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
160,000.00
160,000.00
08/15/15
TOTAL PROJECTED REVENUES
160,000.00
$160,000.00
OPERATIONAL: IMPACT ACOUNT_
Five Year Ca ital program .
Classification
FY2015-16
F'Y2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating___
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
E Atlantic Av Median
Project Location:
E Atlantic Ave
Project Number:
14-007
Project Start Date:
Project End Date:
Projects Description:
Develop conceptual plan for Installation of median on E Atlantic Ave just west of SR Al A. East Atlantic Ave.
Pedestrian Improvements (East of Gleason).
PROJECTED COSTS
_ :.... Five
Year Capital.
Program
Classification
FY2015.16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
30,000.00
30,000.00
.Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
1 30,000.001
1
$30,000.00
PROJECTED REVENUES
` ' .. " Five
Year Capital
Program.
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
special Revenue Funds
Assessment District -Special f=unding
Bond/Bank Financing/Other
83 07/08/15
CRA
30,000.00
30,000.00
TOTAL. PROJECTED REVENUES
30,000.00
$30,000.00
OPERATIONAL. IMPACT AC.OUNT
_ Five
Year Ca
ital program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019.20
Totals
Personnel
Other Operating
capital Outlay
TOTAL PROJECTED OPERATING COST
07/08/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
08/11/2014
Project Title:
MLK Phase 11
Project Location:
NW 12 Ave.
Project Number: 15-004
Project Start Date:
Project End Date:
Projects Description:
Installation of the following Items: Pavers with cross walks, landscaping, resurfacing streets along with sidewalks
from the Wall to NW 12th Ave.
PROJECTED COSTS
Five Year Ca
ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
48,000.00
48,000.00
Construction/ Buildings/ Other Improvements
267,200.00
267,200.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
4,800.00
4,800.00
TOTAL PROJECTED COSTS
320,000.00
$320,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
320,000.00
320,000.00
8,15 08/15/15
TOTAL PROJECTED REVENUES
1320,000.001
1
1
1
1 $320,000.00
OPERATIONAL IMPACT ACOUNT
Five. Year Ca
ltal. Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
NE 2 Ave/Seacrest Beaut.
Project Location:
NE 2nd Av from NE 4th St to NE 8th St
Project Number: 11-067
Project Start Date:
Project End Date:
Projects Description: `
Received Enhancement Grant to enhance crosswalks, street lighting, landscaping, bike lanes and Improve sidewalks. (CITY
PORTION OF THE GRANT FUNDED BY GAS TAX) Design and construction schedule set by FDOT.
PROJECTS[] CASTS
Fire Year C� it l:Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Ac ulsitlon
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
1,377,360.00
1,377,360.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
20,980.00
20,980.00
TOTAL PROJECTED COSTS
1,398,340.00
$1,398,340.00
PROJECTED:REVENUES
Fjve Year Ca .IaI Pra gr
am '
Revenue Source(s)
FY2015-16
FY2016-17
FY2017.18
FY2018-19
FY2019-20
Totals
334: General Ca Ital Improvements
442: Water/Sewer Renewal and Replacement Fund
448: Stormwater Utility Fund
Federal Grants
State Grants
598,340.00
598,340.00
County Grants
Special Revenue Funds
08/10/15
Assessment District -Special Funding
Bond/Bank Financing/Other
GRA
800,000.00
800,000.00
TOTAL PROJECTED REVENUES
1,398,340.00
$1,398,340.00
OPERA"IONAL IMPACT ACOUNT'.'
_Five Year Ca ital Pro ram
Classlflcatlon
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital outla
TOTAL PROJECTED OPERATING COST
$0.00
08/10/15
Department/Division
Community Redevelopment Authority
Engineering
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
07/23/2010
Project Title:
NE 3rd St Street Scape
Project Location:
Project Number: 11-024
Project Start Date:
Project End Date:
Projects Description:
Provide street enhancements and Install sidewalks on NE 3rd St between NE 2nd Av & NE 3rd Av; NE 3rd Av between NE
3rd St and NE 4th St and the alley that Is also know as Artists Alley. Conceptual designs are currently under design.
PROJECTED COSTS
Five Year Ca ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
1,206,625.00
1,206,625.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
18,375.00
18,375.00
TOTAL PROJECTED COSTS
1,225,000.00
$1,225,000.00
PROJECTED REVENUES
_, Five Year Ca /tat Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
442: Water/Sewer Renewal and Replacement Fund
100,000.00
100,000.00
448: Stormwater Utility Fund
125,000.00
125,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
6-1 [ 08/15/15
{
Assessment District -Special Funding
Bond/Bank Financia /Other
CRA
1,000,000.00
1,000,000.00
TOTAL PROJECTED REVENUES
1,225,000.00
$1,225,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL_ PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
NW 12 Ave-Atiantic/MLK
Project Location:
1_093,1_094
Project Number: 10-041
Project Start Date:
Project End Date:
Projects Description:
This beautification project will Include one -street parallel parking, landscaping and alley improvements. CRA to provide
funding for hard-scape features. Existing balances from FY 13: Fund 442 $75,000 Fund 448 $125,000
PROJECTED COSTS
: Five Year: Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
987,344.30
987,344.30
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
15,035.70
15,035.70
TOTAL PROJECTED COSTS
11,002,380MI
$1,002,380.00
PROJECTED REVENUES
_ . Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
442: Water/Sewer Renewal and Replacement Fund
75,000.00
75,000.00
448: Stormwater Utility Fund
227,380.00
227,380-00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
I 08/15/15
Bond/Bank Financing/Other
CRA
700,000.00
700,000.00
TOTAL. PROJECTED REVENUE=S
1,002,380.00
$1,002,380.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca Ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
08/15/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
NW/SW Neighborhood Alley
Project Location:
NW/SW Neighborhood (NW 5th Ave.)
Project Number: 15-040
Project Start Date:
Project End Date:
Projects Description:
Construction of an unimproved alley to be determined within the Northwest or Southwest Neighborhoods. Funding
this FY will cover design and construction costs.
PROJECTED COSTS
Five Year Ca
Ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
300,000.00
300,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
300,000.001
$300,000.00
PROJECTED REVENUES
Five Year Ca ltal Pro ram
Revenue Sources
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
448: Stormwater Utility Fund
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
08/17/15
CRA
300,000.00
300,000.00
TOTAL PROJECTED REVENUES
1300,000.001
1
1
1
1 $300,000,00
OPERATIONAL IMPACT ACOUNT
Five Year Ca Iial.Pra ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/17/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Osceola Neigh Imp FY 16
Project Location:
Osceola Park Neighborhood
Project Number: 16-649
Project Start Date:
Project End Date:
Projects Description:
Pave 3 alleys in Osceola neighborhood. CRA to fund this project.
PROJECTED COSTS
Year: Ca Ita1 Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
175,000.00
175,000.00
Construction/ Buildings/ Other Improvements
320,125.00
320,125.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
4,875.00
4,875.00
TOTAL PROJECTED COSTS
175,000.00
325,000.00
$500,000.00
PROJECTED, REVENUES .'
Five 1(ear Ca ital Pro ram .
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
448: Stormwater Utility Fund
50,000.00
50,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
08/19/15
CRA
175,000.00
275,000.00
450,000.00
TOTAL PROJECTED REVENUES
175,000.00
325,000.00
$500,000.00
OPERATIONAL IMPACT ACOUNT
„ Five Year Capita[Program _
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/19/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
DBCA Rehab
Project Location:
Old School Square
Project Number: 16-514
Project Start Date:
Project End Date:
Projects Description:
Miscellaneous repairs and maintenance to the Old School Square Building (exterior).
. ...PROJECTED COSTS
Five Year Ca ltal Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
300,000.00
300,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
300,000.00
$300,000.00
PROJECTEDREVENUES
Five Year Ca ital;Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank FinancinglOther
CRA
1300,000.001
300,000.00
( 08/15/15
TOTAL PROJECTED REVENUES 1300,000.001 1
$300,000.00
OPERATIONAL IMPACT. ACOUNT _ . _ .
Five. Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
DBCA Site/Park lmprovmnts
Project Location:
Old School Square
Project Number: 16-596
Project Start Date:
Project End Date:
Projects Description:
Complete Phase 2 OSS Master Plan. Interactive Fountain FY12, Covered Walkway/Event Fencing/Signage/Public Art
FY13, Museum Entry/Seatwalls/ Misc Hardscaping FY14, Restroom/Concession Bldg FY15, Lazer Videowall FY16 (FY 16
DESIGN ONLY)
PROJECTED COSTS :
Five
.Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
180,000.00
180,000.00
Construction/ Buildings/ Other Improvements
1,002,000.00
1,002,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
18,000.00
18,000.00
TOTAL PROJECTED COSTS
1,200,000.00
$1,200,000.00
PROJECTED REVENUES
Five Year Ca ital'Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
r'° 08/15/15
CRA
1,200,000.00
-4$1,200,000.00
1,200,000.00
TOTAL PROJECTED REVENUES
1,200,000.40
OPERATIONAL IMPACT ACOUNT
Five Year Capi#al Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
Parking Study Impi Prol
Project Location:
(WAYFINDER DESIGN & CONSTRUCTION)
Project Number: 14-069
Project Start Date:
Project End Date:
Projects Description:
PROJECTEDCOSTS
Five Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19 FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
215,000.00
215,000.00
Construction/ Buildings/ Other Improvements
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
215,000.00
$215,000.00
PROJECTED REVENUES'
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
215,000.00
215,000.00
o � 08/15/15
TOTAL PROJECTED REVENUES
1215,000.00
$215,000.00
OPERATIONAL IMPACT ACOUNT
_ Five Year CaPita] Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15115
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Veterans Park Imp
Project Location:
Veterans Park
Project Number: 16-668
Project Start Date:
Project End Date:
Projects Description:
Park improvements to Veterans Park: Replace the wooden playground at Veterans Park with a new theme playground
system which includes: shade system, poured -In-place surfacing, playground equipment, athletic equipment, swings
and benches. The present wooden playground was built in November,1993 and no longer meets current code.
Playground Phase
PROJECTED COSTS
Five Year Ca Ital Program
Classification
FY2015-16
FY2016-17
FY2017-18 FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
50,000.00
50,000.00
Construction/ Buildings/ Other Improvements
147,000.00
147,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
3,000.00
3,000.00
TOTAL PROJECTED COSTS
200,000.001
$200,000.00
PROJECTED REVENUES
Five Year Ca ital Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
IJ o '3, 08/03/15
Bond/Bank Financing/Other
CRA
200,000.00
200,000.00
TOTAL PROJECTED REVENUES
200,000.00
$200,000.00
OPERATIONAL IMPACT ACOUNT
FIve.Year Ca
Ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/03/15
Department/Division
Community Redevelopment Authority
Engineering
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
S Swinton-SW/E 1st Signal
Project Location:
Intersection of S Swinton Av and SW/SE 1st
St New Name: SE 1st Street Conversion to
2 -way Traffic.
Project Number: 13-022
Project Start Date:
Project End Date:
Projects Description:
Install mast arm signal at this intersection to accommodate two-way traffic on SE 1st St. Signal design funded in FY
13
PROJECTED COSTS...:
_ .. Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
EngineeringlArchitect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
250,000.00
250,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
250,000.001
$250,000.00
PROJi CT D REVENUES .
Five Year Ca ital Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019.20
Totals
334: General Capital Im rovements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
"k," 07/11/15
CRA 1250,000M
250,000.00
TOTAL_ PROJECTED REVENUES
1250,000.00
$250,000.00
OPERATIONAL IMPACT ACOUNi
Five`Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
07/11/15
Department/Division
Community Redevelopment Authority
Engineering
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
SE 2 St - Swinton -SE 3 Av
Project Location:
(CONSTRUCTION PHASE)SE 2nd St - S
Swinton Ave to SE 3rd Ave SE 2nd Ave - SE
3rd St to SE 2nd St Alleys in Blocks 87 and 88
FY 13 Funding carried forwared: Fund 448
$170,000 New Name: Osceola Park Business
Revitalization (includes SE 2nd St/Ave. and
Project Number: 13-020
Project Start Date:
Project End Date:
Projects Description:
Provide street enhancements Including paver sidewalks, landscaping, decorative street lights and underground utilities,
drainage and on street parking. Fund 448 has $170,000 budgeted In FY 13
PROJECTED COSTS
Five Year Ca Itdl Program
Classification
FY2015-16
FY2016-17
FY2017.18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
1,013,000.00
1,013,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
12,000.00
12,000.00
TOTAL PROJECTED COSTS
1,025,000.00
$1,025,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
448: Stormwater Utility Fund
225,000.00
225,000.00
Federal Grants
State Grants
County Grants
07 08/10/15
Special Revenue Funds
Assessment District -S eclat Funding
Bond/Bank Financing/Other
CRA
800,000.00
800,000.00
TOTAL PROJECTED REVENUES
1,025,000.00
$1,025,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other O erating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/10/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
08/11/2014
Project Title:
SE 4th Ave. Beautification
Project Location:
SE 4th Ave.
Project Number: 15-011
Project Start Date:
Project End Date:
Projects Description:
SE 2nd Street to East Atlantic Ave. Improvements to Library and Chambers.
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
788,000.00
788,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
12,000.00
12,000.00
TOTAL PROJECTED COSTS
800,000.00
$800,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
448: Stormwater Utility Fund
200,000.00
200,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
C) ( 07/18/15
CRA
600,000.00
600,000.00
TOTAL PROJECTED REVENUES
1800,000,001+$800,000-00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19 FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/18/15
Department/Division
Community Redevelopment Authority
Engineering
City of Defray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
SW 1 Av-SW 1 St to Atl Av
Project Location:
SW 1 st Ave - SW 1 st St to W Atlantic Ave
Project Number: 16-582
Project Start Date:
Project End Date:
Projects Description:
Street beautification to Include pavers, decorative street lights, landscaping and drainage. CRA to provide funding for
pavers, decorative street lights and landscaping
PROJECTED COSTS
l=ive Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-201
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
63,500.00
63,500.00
Construction/ Buildings/ Other Improvements
440,553.00
440,553.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
5,947.50
5,947.50
TOTAL PROJECTED COSTS
I 63,500,001446,500.50L
$510,000.50
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
F'Y2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
448: Stormwater Utility Fund
50,000.00
50,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
07/14/15
CRA
1 63,500.00
396,500.00
460,000.00
TOTAL PROJECTED REVENUES
1 63,500.001446,500.001
0
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/14/15
Department/Division
Community Redevelopment Authority
Engineering
City of Delray Beach
CII' Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
SW 10th/9th Ave Improv
Project Location:
SW 10th Ave & SW 9th Ave between W
Atlatnic Ave and SW 1 st St
Project Number: 14-023
project Start Date:
Project End Date:
Projects Description:
SW 10th Ave between W Atlantic Ave and SW 1st St; provide paver sidewalk, on -street paralell parking and decorative
street lights on east side. SW 91h Ave bewteen W Atlantic Ave and SW 1st St; complete the sidewalk on the west side
with paver brick sidewalk.
PROJECTED COSTS ::
Five Year' Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19'FY2019-201
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
197,000,00
197,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency_3,000.00
3,000.00
TOTAL PROJECTED COSTS
200,000.00
$200,000.00
PROJECTED REVENUES
Five Year Ca ital Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
448: Stormwater Utility Fund
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
f 3 07/29/15
Bond/Bank Financing/Other
CRA
200,000.00
200,000.00
TOTAL. PROJECTED REVENUES
200,000.00
$200,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital urogram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL. PROJECTED OPERATING COST
$0.00
07/29/15
Department/Division
Community Redevelopment Authority
11,5—
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
SW 2nd Terr
Project Location:
Project Number: 14-024
Project Start Date:
Project End Date:
Projects Description:
CRA -Reconstruct water, sewer, drainage and repave street with curb and gutters.
PROJECTED COSTS Five
Year Capital. Program
Classification FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Prelim! nary -Study
Construction/ Buildings/ Other Improvements 140,000.00i
140,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS 140,000.00
$140,000.00
PROJECTED REVENUES
.. . . Five Year Ga ital Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
442: Water/Sewer Renewal and Replacement Fund
75,000.00
75,000.00
448: Stormwater Utility_Fund
Federal Grants
State Grants
County Grants
Special Revenue Funds
unding
Assessment District -Special Funding-
1 08/31/15
Bond/Bank Financing/Other
CRA
65,000.00
65,000.00
TOTAL PROJECTED REVENUES
140,000.00
$140,000-00
OPERATIONAL IMPACT ACOUNT
Five
Year .0 pital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
08/31/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
SW 4th Ave-Atl-SW 10th
Project Location:
SW 4th Ave. from Atlantic to SW 10th Street
Project Number: 16-669
Project Start Date:
Project End Date:
Projects Description:
Improve SW 4th Ave with landscaping and misc. Im . (DESIGN PRASE)
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-201
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
100,000.00
100,000.00
Construction/ Buildings/ Other Improvements
738,750.00
738,750.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
11,250.00
11,250.00
TOTAL PROJECTED COSTS
100,000.00
750,000.00
$850,000.00
PROJECTED REVENUES
.. Five 'Year .Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
1
1100,000.001750,000.001850,000.00
117 08/15/15
TOTAL PROJECTED REVENUES
1100,000.00 1750,000.00
$85(),000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital. F ragram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
DepartmentIDlvlslon
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
SW 6,7,8,9 Ave Atl SW1 st
Project Location:
Atlantic Ave. to SW 1 st Street
Project Number: 16-654
Project Start Date:
Pro ect End Date:
Projects Description:
Misc Roadway/Alley Improvements SW 6th Ave. SW 7th Ave. SW 8th Ave. SW 9th Ave. (DESIGN PHASE)
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
30,000.00
30,000.00
Construction/ Buildings/ Other Improvements
167,000.00
167,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
3,000.00
3,000.00
TOTAL PROJECTED COSTS
1200,000.001
$200,000.00
PROJECTED REVENUES
Five Year Ca . ital Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19 FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
200,000.001
1 200,000.00
I j 08/10/15
TOTAL PROJECTED REVENUES
200,000.00
$200,000.00
OPERATIONAL IMPACT ACOUN7
Fine Year .C...ital Program.
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/10/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
SW14 Arne SW 2nd St 3rd St
Project Location:
SW 14th Ave. Alley
Project Number: 16-655
Project Start Date:
Project End Date:
Projects Description:
Improvements to Roadway and Alley SW 14 Ave. Alley from SW 2nd Street to 3rd Street (DESIGN PHASE)
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015.16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
15,000.00
15,000.00
Construction/ Buildings/ Other Improvements
85,000.00
85,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingent
TOTAL PROJECTED COSTS
100,000.00
$100,000,00
PROJECTED REVENUES
Five Year Ca ital Proram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
100,000.00
100,000.00
. 08/10/15
TOTAL PROJECTED REVENUES
100,000.00
$1001000.00
OPERATIONAL IMPACT ACOUN7
Five Year Ca ital Program . .
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
_$0.00
08/10/15
Department/Division
Community Redevelopment Authority
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
06/23/2014
Project Title:
Swinton & Atlantic Inters
Project Location:
Project Number: 12-051
Project Start Date:
Project End Date:
Projects Description:
Project limits Include: W Atlantic Ave between SW/NW 1st Ave and SIN Swinton Ave; S Swinton Ave Between SW/SE 1st
St and W Atlantic Ave; N Swinton Ave between W Atlantic Ave and NW/NE 1st St Improvements include: beautification,
decorative street lights, landscaping and wider sidewalks along W Atlantic Ave; beautification, wider sidewalks and
enhanced parking along S Swinton; address pedestrian safety crossign N Swinton Ave. Design programed In FY 13 and
construction planned for FY 14. Includes Trombone Mast Arms. This project is funded by CRA.
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
273,000.00
273,000.00
Construction/ Buildings/ Other Improvements
1,477,500.00
1,477,500.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
22,500.00
22,500.00
TOTAL PROJECTED COSTS
273,000-0011,500,000-001
$1,773,000.00
PROJECTED REVENUES
Five Year Capital Pro ram:
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019.20
Totals
334: General Capital Improvements
448: Stormwater Utility Fund
73,000.00
100,000.00
173,000.00
Federal Grants
State Grants
J23 08/15/15
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
200,000.00
1A00,000.00
1,600,000.00
TOTAL PROJECTED REVENUES
1273,000.0011,500,000-00
$1,773,000.00
OPERATIONAL IMPACT ACOUNT.
Five Year Ca
Ital.Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
FS #2 Generator Upgrade
Project Location:
35 Andrews Ave.
Project Number: 16-571
Project Start Date:
Project End Date:
Projects Description:
Replacement and upgrade of the emergency generator at Fire Station #2 to provide adequate auxiliary power for
continued emergency operations during times of power Interruptions. The current generator has been In service
since the opening of the fire station in 1991 and coming to the end of its useful service span. This facility needs a
reliable auxiliary power supply to continue in its mission of providing emergency operations during emergency
services to residents and visitors of Delray Beach and Gulf Stream.
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018.19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
100,000.00
100,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
100,000.00
$100,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016.17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
1 2- 57 08/03/15
Assessment District -Special Funding
Bond/Bank Financing/Other
100,000.00
100,000.00
CRA
TOTAL PROJECTED REVENUES
100,000.00
$100,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Program.
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/03/15
Department/Division
Fire Department
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
FS #3 Rebuild
Project Location:
651 LINTON BLVD
Project Number: 16-613
Project Start Date:
Project End Date:
Projects Description:
Rebuild Fire Station #3 Per Finance Director: Construction costs in the amount of $4,000,000 will be financed.
PROJECTED COSTS
Flee YearCa Ital Prog ram
:.
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Ac uisition
Engineering/Architect Design/ Preliminary Study
600,000.00
600,000.00
Construction/ Buildings/ Other Improvements
4,000,000.00
4,000,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
600,000.00
4,000,000.00
$4,600,000.00
PROJECTED REVENUES
Five Year Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
600,000.00
4,000,000.00
4,600,000.00
CRA
08/03/15
TOTAL PROJECTED REVENUES
1600,000.00 [4,000,000.001
$4,600,000.00
OPERATIONAL IMPACT ACOUNT
l=ive Year Capital'Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/03/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
IT HR Payroll System
Project Location:
City Hall
Project Number: 16-642
Project Start Date:
Project End Date:
Projects Description:
HRMS 1 Payroll system needed for Time & Attendance for all City staff. System will greatly Increase efficiencies of
payroll process and gain accuracies In reporting time for payroll payments. Estimate pricing from consultants report
during IT Assessment and project review lass year.
PROJECTED COSTS ;- .
Five Year,Dapital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
F'Y2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
300,000.00
300,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
1300,000.00
$300,000.00
::PPOJECTED REVENUES
Five YearCa ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
300,000.00
300,000.00
�;� 07/10/15
CRA
TOTAL PROJECTED REVENUES
1300,000.001
$300,000.00
OPERATIONAL IMPACT ACOUNT
_ _ _ Five„Year.Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07110/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
1T -San's Storage Disks
Project Location:
City Hall
Project Number: 15-613
Project Start Date:
Project End Date:
Projects Description:
Additional SAN disk storage needed for file retention
PROJECTED COSTS
Five Year Ca Ital Program
.. _.:. .
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
30,000.00
30,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
30,000.00
$30,000.00
PROJECTED .REVENUES
Five Year ,Ca ital Program:
Revenue Source(s)
FY2015-16
FY2016-17
FY2017.18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
30,000.00
30,000.00
CRA
F 07/10/15
TOTAL PROJECTED REVENUES
1 30,000.001
$30,000.00
OPERATIONAL IMPACT ACOUNT _
_: five Year Ca itaL.Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
300,000.00
300,000.00
TOTAL PROJECTED OPERATING COST
300,000.00
$300,000.00
07/10/15
Department/Division
Information Technology
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
05/19/2014
Project Title:
IT-Comp Equip RIR FY15-19
Project Location:
Project Number: 15-003
Project Start Date:
Pro'ect End Date:
Projects Description:
Replacement of computers and related equipment as requested by each department in their budget requests. NOTE:
This cost Is an ESTIMATE only. Actual costs will be determined by Budget Office once departmental budgets requests
have been reviewed and approved by City Manager. Desktop replacement to VDI Solution. Includes Hyperconverged
server equipment and 500 thin client desktops . See separate analysis for VDI project selection PC replacement for
remaining 100 Replacement of Printers, Copiers, Scanners. Replacement of Toughbooks
PROJECTED COSTS
Fivo1ear:Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildingsl Other Improvements
Equipment
260,000.00
260,000.00
260,000.00
125,000.001125,000-00
1,030,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
260,000.00
260,000,00
260,000.00
125,000.00
125,000.00
$1,030,000.00
PROJECTED REVENUES:
Five Year Ca .ital Program
Revenue Sources
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
` a 3 07/10/15
Assessment Dist rict-S ecial Funding
Bond/Bank Financing/Other
260,000.00
260,000.00
260,000.00
125,000.00
125,000.00
1,030,000.00
CRA
TOTAL PROJECTED REVENUES
260,000.00
260,000.00
260,000,001125,000-001125,000.001
$1,030,000.00
. OPERATIONAL IMPACT, ACOUNT
_ .
Five. Year Ca ital._Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL. PROJECTED OPERATING COST
$0.00
07/10/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
IT Disaster Recovery
Project Location:
City Hall
Project Number: 16-640
Project Start Date:
Project End Date:
Projects Description:
Rack space in Data Center more than 150 miles from Delray Beach for Disaster recovery. Includes connectivity and
equipment move from Police Data Center Estimate pricing from consultants report during IT Assessment
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
200,000.00
200,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
200,000.00
$200,000.00
PROJECTED REVENUES
Five Year Ca ital Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
PY2018.19
FY2019-20
Totals
334: General Capital Improvements
134,000.00
134,000.00
442: Water/Sewer Renewal and Replacement Fund
33,000.00
33,000.00
448., Stormwater Utility Fund
33,000.00
33,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
3�la 08/24/15
Bond/Bank Financing/Other
CRA
TOTAL- PROJECTED REVENUES
200,000.00
$200,000.00
OPERATIONAL IMPACT ACOUN7
Fiore Year C. pital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/24/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
IT ERP Strat Plan Upgrade
Project Location;
City Hall
Project Number: 16-641
Project Start Date:
Project End Date:
Projects Description;
Redundant iSeries, Include larger disk drives for current !Series, data mirroring, fallover capabilities, test environment ERP
Transformation initiatives - Data cleansing, Application integration, payment processing, business process review, end
user training, Navll-lne Select Migration, Cognos BI Migration - Project Manager Naviline Select I Cognos upgrade Estimate
pricing from consultants report during IT Assessment and project review last year.
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
Equipment
55,000.00
55,000.00
Inspections Fees/ Other Fees/ Costs
1,945,000.00
1,945,000.00
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
2,000,000.00
i
i
1
1 $2,000,000.00
PROJECTED REVENUES
- Five Year Ca ital Program'
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
1,500,000.00
1,500,000.00
442: Water/Sewer Renewal and Replacement Fund
250,000.00
250,000.00
448: Stormwater Utility Fund
250,000.00
250,000.00
Federal Grants
State Grants
County Grants
7 08/24/15
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
i2,000,000.00!
$2,000,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
08/24/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
IT VoIP Phone System
Project Location:
City Hall
Project Number: 16-644
Project Start Date:
Project End Date:
Projects Description;
VolP Unified Communications project - includes sysytem, handsets, POE network switches Estimate pricing from
consultants report during IT Assessment
PROJECTED COSTS
Five Year Ca Ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
1,200,000.00
1,200,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
1,200,000.00
i
$1,200,000.00
PROJECTED REVENUES _
Five Year Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
1,100,000.00
1,100,000.00
442: Water/Sewer Renewal and Replacement Fund
50,000,00
50,000.00
448: Stormwater Utility Fund
50,000.00
50,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
08/24/15
Bond/Bank Financia /Other
CRA
TOTAL PROJECTED REVENUES
1,200,000.00
$1,200,000.00
OPERATIONAL. IMPACT ACOUNT ..
_ Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-1 81
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
$0.00
08/24/15
Department/Division
Engineering
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
NE 2 Ave/Seacrest PH2
Project Location:
NE 2nd Ave (Seacrest Blvd) from Geo Bush
Blvd to NE 13th St. (Called NE 2nd
Ave./Seacrest Phase I In Grant Funding)
Project Number: 14-071
Project Start Date:
Project End Date:
Projects Description:
Transportation Alternative Program (TAP) (CITY PORTION OF THE GRANT FUNDED BY GAS TAX) Grant to add
sidewalks, bike lanes and other Improvements along this section Seacreast Blvd.
PROJECTED COSTS.Five Year Capital Pro ram
Classification FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
842,422.00
842,422.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
12,828.00
12,828.00
TOTAL PROJECTED COSTS
1855,250.001
$855,250.00
PROJECTED REVENUES
Five Year Ca
i#ai Pro' ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018.19
FY2019-20
Totals
334: General Capital Improvements
442: Water/Sewer Renewal and Replacement Fund
76,000.00
76,000.00
448: Stormwater Utility Fund
76,000.00
76,000.00
Federal Grants
250,550.00
250,550.00
State Grants
County Grants
452,700.00
452,700.00
I �, I 1 08/24/15
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
i
55,250.00
i855,250-001'
$855,250.00
OPERATIONAL. IMPACT ACOUNT
Five Year Ca 'ltal Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/24/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
NE 2 Ave/Seacrest PH3
Project Location:
NE 13th Street to NE 22nd Street on North
East 2nd Ave. (Called NE 2nd Ave./Seacrest
Phase 2 In Grant Funding)
Project Number: 14-086
Project Start Date:
Project End Date:
Projects Description:
Transportation Alternative Program (TAP) (CITY PORTION OF THE GRANT FUNDED BY GAS TAX) Grant to add
sidewalks, bike lanes and other Improvements along this section of Seacrest Blvd,
PROJECTED COSTS's
Faye Year Capital Program
,
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019.20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
204,000.00
204,000.00
Construction/ Buildings/ Other Improvements
904,149.00
904,149.00
Equipment
Ins actions Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
13,768.00
13,768,00
TOTAL PROJECTED COSTS
204,000.001
1917,917.001$1,121,917.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
129,000.00
129,000.00
442: Water/Sewer Renewal and Replacement f=und
25,000.00
75,000.00
100,000.00
448: Stormwater Utility Fund
50,000.00
100,000.00
150,000.00
Federal Grants
State Grants
County Grants
742,917.00
742,917.00
Special Revenue Funds
I 1, 08/24/15
Assessment Distrlci-S ecial Funding
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
204,000.00
917,917.00
$1,121,917.00
OPERATIONAL IMPACT ACOIJNT
Fide Year Capital Pro
ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
08/24/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
NE 2 Ave/Seacrest PH4
Project Location:
NE 22nd Street to Gulfstream Blvd. on North
East 2nd Ave. (Called NE 2nd Ave./Seacrest
Phase 3 In Grant Funding)
Project Number: 15-066
Project Start Date:
Project End Date:
Projects Description:
Transportation Alternative Program (TAP) (CITY PORTION OF THE GRANT FUNDED BY GAS TAX) Grant to add sidewalks,
bike lanes, and other Improvements along this section of Seacrest Blvd.
PROJECTED COSTS
Five Year Ca itai Program.
Classification
FY 2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
290,000.00
290,000.00
Construction/ Buildings/ Other Improvements
1,231,250.00
1,231,250.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
18,750.00
18,750.00
TOTAL PROJECTED COSTS
1290,000.001
11,250,000.001$1,540,000.00
PROJECTED REVENUES
Five Year Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
140,000.00
140,000.00
442: Water/Sewer Renewal and Replacement Fund
75,000.00
250,000.00
325,000.00
448: Stormwater Utility Fund
75,000.00
250,000.00
325,000.00
Federal Grants
State Grants
County Grants
750,000.00
750,000.00
Special Revenue Funds
.- 08/24/15
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
290,000.00
1,250,000.00
$1,540,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
$0.00
08/24/15
Department/Division
Police Department
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
05/19/2014
Project Title:
PD Laptop Replace - FY 14
Project Location:
Project Number:
15-006
Project Start Date:
Project End Date:
Projects Description:
Replace the Department's 139 "ruggedized" laptops used by Officers In the field. These laptops are used by Officers
to connect with Dispatch, FCIC/ NCIC, messaging, and OSSI. They improve officer safety, efficiency, and
productivity. Cost estimate Is $550,.000 for all (approx. $4k ea.) Including warranty. The current laptops will be four
years old in March 2014 and are no longer under warranty. PD will consult and corrdinate with IT for all computer
replacements. Note: Finance Director shall review Lease Option.
PROJECTED COSTS
Five Year Ca
31tal Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
61,054.00
61,054.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
61,054.001
$61,054.00
PROJECTED REVENUES::
Five
Year. Capital
ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
F'Y2019-20
Totals
334: General Capital improvernents.
Federal Grants
State Grants
County Grants
/-A 08/04/15
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
61,054.00
61,054.00
CRA
TOTAL PROJECTED REVENUES
i 61,054.00
1
1
$61,054.00
OPERATIONAL IMPACT ACOUNT
Five
Year Ca
Ital .Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/04/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
P25/Motorola Radio Repl.
Project Location:
City Wide.
Project Number: 16-564
Project Start Date:
Project End Date:
Projects Description:
P25 project migration for City's communications. Project 25 Is a standard for the design and manufacturing of
interoperable digital two-way wireless communications products. The equipment Police Department currently utilizes is
13 years old and will no longer be supported by Motorola in 2016 therefore the need for interoperability along with state
of the art equipment is a must to move forward and remain compliant with the industry standard.
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
Equipment
2,459,977.00
2,459,977.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
2,459,977.00
$2,459,977.00
PROJECTED REVENUES
Fine Year Ca'
ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
I L, 9 08/19/15
Bond/Bank Financing/Other
2,459,977.00
2,459,977.00
CRA
TOTAL PROJECTED REVENUES
2,459,977.00
$2,459,977.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital.Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
08/19/15
Department/Division
Police Department
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PD Patrol Vehicle GPS
Project Location:
PD
Project Number: 16-598
Project Start Date:
Project End Date:
Projects Description:
Outfit all marked patrol vehicles with GPS/AVL units (98 vehicles) 9 $988 ea. for a total of approx. $97,000. This
provides the Dept. with accountability for every marked vehicle. When integrated with the new OSSI Public Safety
system, it will provide the ability to dispatch the nearest vehicle to the scene. Activation fee and monthly costs
requested in general rev. budget. Additionally, our new OSSI CAD system provides software that gives us the
capability to dispatch the closest unit available with this technology. This cost includes the server and the license
fees. This module was not purchased as part of the rollout of the OSSI Public Safety Software implementation
because of the cost and the fact that GPS devices were not in cars. Cost of the OSSI module Is approx. $64,500
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY201 B-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
161,500.00
161,500.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
161,500.00
$161,500.00
PROJECT15D REVENUES
"_ Five Year Ca ital Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY201 B-19
FY2019-20
Totals
334: General Capital Improvements
161,500.00
161,500.00
Federal Grants
State Grants
07/11/15
o -N. N
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
1161,500.001
$161,500.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital'Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/11/15
Department/Division
Police Department
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
06/09/2014
Project Title:
PD -Security Cameras
Project Location:
300 W. Atlantic Ave
Project Number: 15-565
Project Start Date:
Project End Date:
Projects Description:
The City is interested in placing security cameras in the Downtown area from 1-95 to the beach as both a deterrent and
a way to Investigate crimes that may occur. The project would be rolled out in phases, with Phase 1 being to install
approximately 6 cameras, build the internal infrastructure to view the video at PD, and conduct additional research.
PROJECTED COSTS
Five Year Capital:Pragram, „ .
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment..._
250,000.00
250,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL_ PROJECTED COSTS
250,000,00
$250,000,00
PROJf=CTED R V NOES _ _
Five Year Ca ital Program'
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
250,000.00
250,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
r �7? " 3� 07/11/15
CRA
TOTAL PROJECTED REVENUES
250,000.00
$250,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/11/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Sound. Polygraph/int. Rm.
Project Location:
Police Dept.
Project Number:
16-567
Project Start Date:
Project End Date:
Projects Description:
Soundproof Interrogation rooms and polygraph room with sound proofing material. Needed due to thin walls; this
also poses Issues when multiple suspects are involved as conversations can be heard from one room to another.
PROJECTED COSTS
r=ive
Year. Ca
ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
28,900.00
28,900.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
28,90Q.Q0
$28,900.00
PROJECTED REVENUES
Five
Year Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
28,900.00
28,900.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
08/04/15
CRA
TOTAL PROJECTED REVENUES
1 28,900.001
$28,900.00
OPERATIONAL IMPACT ACOUNT
Five
Year Capital
Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/04/15
Department/Division
Parks and Recreation
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PR -Comm Center Rebuild
Project Location:
50 NW 1st Ave
Project Number: 16-606
Project Start Date:
Project End Date:
Projects Description:
Renovate and Redesign the Delray Beach Community Center. A two story building which will Include meeting rooms,
expanded gymnasium, fitness center, locker room, rest rooms, kitchen, storage, administrative and staff offices, elevator,
reception area and lobby area. FY 2015; Needs Analysis and Conceptual Design FY 2016; Design Drawings & Bid
Documents FY 2017; Construction Note: Funding for 6,000,000 In FY 18119 will be financed per Director of Financing.
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
25,000.00
900,000.00
925,000.00
Construction/ Buildings/ Other Improvements
5,010,000.00
5,010,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
90,000.00
90,000.00
TOTAL PROJECTED COSTS
25,000,001900,000.00'5,100,000.00
$6,025,000.00
PROJECTED REVENUES
- ; Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
57
08/19/15
Bond/Bank Financing/Other
25,000.00
900,000.00
5,100,000.00
6,025,000.00
CRA
TOTAL PROJECTED REVENUES
25,000.00
900,000.00
5,100,000.00
$6,025,000.00
OPERATIONAL IMPACT ACOUN7
Five bear Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/19/15
Department/Division
Parks and Recreation
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
05/19/2014
Project Title:
PR -Skate Park R&R
Project Location:
505 SE 5th Ave
Project Number: 15-009
Project Start Date:
Project End Date:
Projects Description:
Presently the "Hobbit" Skate Park ramps are all wood and require annual replacement which Is costly. Hardcore
Shotcrete Skateparks are completely constructed from concrete eliminating annual replacement of ramps. Cost to
renovate and re -design "Hobbit" Skate Park is $250,000. Funding prodded via donation.
is
PROJECTED COSTS
Five.Year.Ca ,ital Program
Classification
FY2015-16
FY2016-17
FY2017-18 FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
250,000.00
250,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
1250,000.001
$250,000,00
PROJECTED RSVENUES.
Five 'Year:Ca i#ol Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
250,000.00
250,000.00
08/19/15
1
CRA
TOTAL PROJECTED REVENUES 1 1250,000.001$250,000.00
.OPERATIONAL IMPACT;ACOUNT ;_Five Year Capital Program
Classification FY2015-16 FY2016-17 FY2017-18 FY2018-19 FY2019-20 Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST $0.00
08/19/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Barwick Road Sidewalks
Project Location:
Barwick Road from Lake Ida north to L-30
Canal
Project Number: 16-504
Project Start Date:
Project End Date:
Projects Description:
Install sidewalks on west side of Barwick Road from Lake Ida north to L-30 Canal. (UNFUNDED)
PROJFCTED'.COSTS
;.Flue Year'Capitaf Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019.20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
25,000.00
25,000.00
Construction/ Buildings/ Other Improvements
160,000.00
160,000.00
160,000.00
1
480,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
. Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
185,000.00
160,000.00
160,000.00
$505,000.00
PROJECTED REVENUES
Five Year CapitaN:Pro 'ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019.20
Totals
334: General Capital Improvements
185,000.00
160,000.00
160,000.00
505,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
!/ �' / 07/29/15
TOTAL PROJECTED REVENUES 1185,000-001160,000.001160,000.001
1
1 $505,000.00
OPERATIONAL IMPACT ACOUNT
-, Five Year Ca, ItaI ,Rmgram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/29/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Bldg for Christmas Tree
Project Location:
Old FEC Train Depot Station
Project Number:
16-580
Project Start Date:
Project End Date:
Projects Description:
Construction of building to store Christmas Tree. (UNFUNDED)
PROJECTED COSTS
Five
Year. Ca
ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19 FY2019-20
Totals
Land Acquisition
Engineering/Architect Design) Preliminary Study
Construction/ Buildings/ Other Improvements
40,000.00
40,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
40,000.00
$40,000.00
PROJECTED REVENUES
Fire
Year Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
40,000.00
40,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
1 08/19/15
TOTAL PROJECTED REVENUES
140,000.001
$40,000.00
OPERATIONAL IMPACT ACOUNT
Five
Year Capital
Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating_
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/19/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Bridge Repair & Maint.
Project Location,
City Limits
Project Number: 16-520
Project Start Date:
Project End Date:
Projects Description:
Routine bridge repairs and maintenance that is required by FDOT Inspections. (UNFUNDED)
PROJECTED COSTS
Five Year Ca ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
250,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
50,000.00
50,000,00
50,000.001
50,000.00
50,000.001
$250,000.00
PROJECTED CTED RI VENUS
Five Year Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
250,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
07/29/15
TOTAL PROJECTED REVENUES
1 50,000.00
50,000.04
50,000.00
50,000.00
50,000.00
$250,000.00
OP15RATIONAL IMPACT ACOUNY
.Five Year Ca itaI Program
Classification
FY2015-16
FY2016.17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
$0,00
07/29/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Comm Ctr Roof Repair
Project Location.
Community Center
Project Number:
16-659
Project Start Date:
Project End Date:
Projects Description:
Repair roof at Community Center with Reflective Roof (UNFUNDED)
PROJECTED COSTS
Five
Year Capital.
Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
25,000.00
25,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
1 25,000.001
1
1
1
1 $25,000.00
PROJECTED REVENUES
Five
Year Capital
Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
25,000.00
25,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
1 08/20/15
TOTAL, PROJECTED REVENUES 1 25,000.00
$25,000.00
OPERATIONAL IMPACT ACOUNT
Five
Year Capital
Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FYY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0,00
08/20/15
Department/Division
Public Works
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
DBCA Digital Signage
Project Location:
Center for the Arts @ OSS
Project Number; 16-612
Project Start Date:
Project End Date:
Projects Description:
Provide three digital directories to be located at the three prominent corners of the OSS site; Swinton Avenue/Atlantic
Avenue, Swinton Avenue/NE 1 Street, and Atlantic Avenue/NE 1 Avenue, This signage will enable those in the
community to learn what events are happening and Invite them to experience the culture OSS has to offer to the
community. Funding Budget is as follows: $144,000 Digital Displays with all hardware and Software $60,000 Structural
Benches & Support Walls $15,000 Electrical Provisions $5,000 Landscape & Irrigation modifications at signs
$16,000 Design Expenses $240,000 Total (UNFUNDED)
PROJECTED COSTS
_.
Fire Year Capi#al Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
36,000.00
36,000.00
Construction/ Buildings/ Other Improvements
204,000.00
204,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
240,000.001
$240,000.00
PROJECTED REVENUES -
Fire Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
1240,000.00
240,000.00
Federal Grants
State Grants
County Grants
08/15/15
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
1
240,000.00
$240,000.00
OPERATIONAL IMPACT ACOUNT
Fine Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Elect Boards & Signs
Project Location:
City wide
Project Number:
16-509
Project Start Date:
Project End Date:
Projects Description:
Procure electronic stop andspeed signs along with message boards. (UNFUNDED)
PROJECTED COSTS
Five
Year Ca
Atal Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
Equipment
25,000.00
25,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
25,000MI
$25,000.00
PROJ15CTED REVENUES
Five
'.Year .Capital.
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
25,000.00
25,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
/ '- 1 07/29/15
TOTAL PROJECTED REVENUES
1 25,000.00
$25,000.00
OPERATIONAL IMPACT ACOUNT
Five
Year Capital
Pru ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
07/29/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Electronic Charging Stat
Project Location:
City Wide
Project Number:
16-661
Project Start Date:
Project End Date:
Projects Description:
Expand network of electric vehicle charging stations (UNFUNDED)
PROJECTED COSTS
Five
Year Ca
ital Program .
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
25,000.00
25,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
25,000.00
$25,000.00
PROJECTED REVENUES
Five Year Co Ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18 FY2018-19
FY2019-20
Totals
334: General Capital Improvements
25,000.00
25,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
08/15/15
TOTAL PROJECTED REVENUES
25,000.00
$25,000.00
OpE'RATIONAL IMPACT ACOU.Ni .
Five
Year Capital
Program.
p _
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
FEC Pedestrian Gates
Project Location:
City Limits
Project Number: 16-522
Project Start Date:
Project End Date:
Projects Description:
FEC Pedestrian Gates maintenance and repairs. As part of the All Aboard Florida project, Quiet Zones will be created
throughout Delray Beach. As part of the Quiet Zone creation, additional gates must be added to each x-ing. The City
is responsible for paying the annual maintenance cost of these added gates. This project provides the city's cost to
maintain the gates. (UNFUNDED)
PROJECTED COSTS
.. .... ..
Five: Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
50,000.00
50,000.00
50,000.00
50,000.00
200,000.00
Equipment
inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
50,000.00
50,000.00
50,000.001
50,000.00
$200,000.00
PROJECTED: :REVENUES
FiveiYearCapitalProgram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
50,000.00
50,000.00
50,000.00
50,000.00
200,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
-7 08/19/15
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
50,000.00
50,000.00
50,000.00
50,000.00
$200,000.00
(JPERATIONAL IMPACT AGOUNT
Five Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/19/15
Department/Division
Fire Department
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Fire Training Center
Project Location:
Project Number: 16-604
Project Start Date,
Project End Date:
Projects Description:
Site improvements for Fire-Rescue training evolutions, equipment testing and personnel functions. FY 17-18: (1)
Pump Testing Pit ($50,000); (2) Paving Covered Concrete Pad ($44,000); (3) Breathing Air Fill Station ($24,000); (4)
Training Tower ($98,000); FY 18-19: (5) Exterior Lighting Flashover Simulator ($45,000); (6) Classroom Facility
$57,000); (7) Two Apparatus Bays for Training Engine ($89,000). (UNFUNDED)
PROJECTED COSTS -
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
F'Y2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
216,000.00
191,000.00
407,000.00
Equipment
Inspections Fees/ Other Fees' Costs
Public Arts Program/ Contingent
TOTAL PROJECTED COSTS
1216,000.001191,000-001
$407,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017.18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
216,000.00
191,000.00
407,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
08/15/15
1'
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
216,000,00
191,000.00
$407,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
FS Hard Floor Installment
Project Location:
City Limits
Project Number:
16-575
Project Start Date:
Project End Date:
Projects Description:
The high Incidence of cancer In the DBFR Department has raised the awareness of its membership to the deadly
results of increased exposure to carcinogens. Inasmuch, management and the newly formed Cancer Committee
seek to reduce personnel exposure. This initiaitve will remove all carpet from the stations and replace with a durable
commerical hard flooring substitute at the following station locations: - Fire Station #1 located at 501 W. Atlantic
Avenue - Fire Station #2 located at 35 Andrews Avenue - Fire Station #4 located 4321 Lake Ida Road - Fire Station #5
located at 4000 Old Germantown Road (UNFUNDED)
PROJECTED COSTS
Five Year Ca
Dital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
50,000.00
50,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingent
TOTAL PROJECTED COSTS
50,000.001
$50,000.00
PROJECTED REVENUES
Five
Year Ca
Dital Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
50,000.00
50,000.00
Federal Grants
State Grants
/79 08/03/15
County Grants
Special Revenue Funds
Assessment District -S ecial Fundis
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
50,000.00
$50,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/03/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
FS Lifeguard Tower Repl
Project Location:
South Towers #3 and #5
Project Number: 16-578
Project Start Date:
Project End Date:
Projects Description:
The City of Delray Beach is a beautiful small taste of paradise and has become a popular destination for vacationers.
Our beach Is an extremely Important part of what we offer. So It is Important that we maintain every component
Including the lifeguard towers. Currently, many of the towers are In various stages of disrepair. The towers are
crumbling and have become a safety hazard for Ocean Rescue personnel. This project will began to replace the eight
(8) large towers, two (2) per year until all have been replaced. (UNFUNDED)
PROJECTED COSTS
Five Year 'Capital 'Pro gram
Classification
FY2015-16
FY2016-17
FY2017.18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
77,400.00
77,400.00
77,400.00
77,400.00
309,600.00
Equipment
Inspections Feesl Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
77,400.00
77,400,00
77,400.001
77,400.00
$309,600.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
77,400.00
77,400.00
77,400.00
77,400.00
309,600.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
08/24/15
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
1 77,400,00
77,400.00
77,400.00
77,400,00
$309,600.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca Ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/24/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
FS #1 Apparatus Floor Res
Project Location:
501 West Atlantic Ave.
Project Number:
16-574
Project Start Date:
Project End Date:
Projects Description:
The apparatus floor needs to be resurfaced. In tis current state, it poses a safety risk to members walking across the
floor. At any given time, a large chunk of floor surface can be dislodged by a member simply walking across the
floor. Resurfacing the floor will decrease the risk of injury to personnel or visitors, and will increase the general
aesthetics of the apparatus bay area. (UNFUNDED)
PROJECTED COSTS Five
Year Capital
Pro ram
p' g
Classification FY2015-16
FY2016-17
PY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
Equipment 39,560.00
39,560.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS 39,560.00
$39,560.00
PROJECTED REVENUES
Five
Year Capital
Program
Revenue Source(s)
FY2015.16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
39,560.00
39,560.00
Federal Grants.
State Grants
County Grants
Special Revenue Funds
>x 08/03/15
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
39,560.00
$39,560.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca
Atal Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018.19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/03/15
Department/Division
Fire Department
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
06/23/2014
Project Title:
FS 1 Kitchen Remodeling
Project Location:
Fire HO Note: Move to Operating Account
Project Number:
15-551
Project Start Date:
Project End Date:
Projects Description:
Kitchen remodeling (UNFUNDED)
PROJECTED COSTS
Five
Year Ca
ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19 FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
26,000.00
26,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
26,000.00
$26,000.00
PROJECTED, REVENUES
Five
Year C.a
p.1tal Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
26,000.00
26,000.00
Federal Grants
State Grants
County Grants
-Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
/ a 06/03/15
TOTAL PROJECTED REVENUES 1
26,000.001
1 1
1
1 $26,000.00
OPERATIONAL IMPACT ACOUNT
Flue
Year Ca
Ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
$0.00
08/03/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Historic House Repairs
Project Location:
City Wide
Project Number: 16-660
Project Start Date:
Project End Date:
Projects Description:
Building repairs (interior and exterior) for the following Historic Homes: Sandoway Cason Bungalow Hunt
(UNFUNDED)
PROJECTED COSTS
Five. Year Ca ital P rog ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
25,000.00
25,000.00
25,000,00
25,000.00
25,000.00
125,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
i 25,000.00
25,000.00
25,000.00
25,000.00
25,000.001
$125,000.00
PROJECTED REVENUES .
Five Year Ca
ital'Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
25,000.00
25,000.00
25,000.00
25,000.00
25,000.00
125,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
� 07/29/15
TOTAL PROJECTED REVENUES
1 25,000.001 26,000.001
25,000.001 25,000.00
25,000.001 $125,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Program
Classification
FY2015.16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
$0.00
07/29/15
Department/Division
Administration
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
HR/Risk/Chamber Renovate
Project Location:
100 NW 1st Ave
Project Number: 16-620
Project Start Date:
Project End Date:
Projects Description:
The Project includes the renovation of the HR Department offices, Risk Management offices, computer room, corridor
expansion, and expanded City Commission Chambers (Option B.) The design will follow the previously prepared
report. (UNFUNDED)
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
60,000.00
60,000.00
Construction/ Buildingsl Other Improvements
334,000.00
334,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingent
6,000.00
6,000.00
TOTAL PROJECTED COSTS
60,000.001340,000.001
$400,000.00
PROJECTED REVENUES
Five Year Capi#al Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
60,000.00
340,000.00
400,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
� 08/03/15
CRA
TOTAL PROJECTED REVENUES
60,000.00
340,000.00
$400,000.00
OPERATIONAL IMPACT.ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/03/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
IT Online Plan Review
Project Location:
City Hall
Project Number: 16-643
Project Start Date:
Project End Date:
Projects Description:
On-line plan review system for Community improvement and Planning & Zoning, System will dramatically Increase
efficiencies to City staff and customers Estimate pricing from consultants report during IT Assessment and project
review last year. (UNFUNDED)
PROJECTED COSTS
Five
Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
300,000.00
300,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
300,000.00
$300,000.00
PROJECTED REVENUES
,Five Year Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
1300,000.001
i
300,000.00
ol! 08/19/15
1
1
CRA
TOTAL PROJECTED REVENUES
130o.000.Ool
$300,00000
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017.18
FY2018-19 FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/19/15
Department/Division
Administration
i
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Lobby -1st Fl Restroom Imp
Project Location:
100 NW 1st Ave
Project Number: 16-619
Project Start Date:
Project End Date:
Projects Description:
The Project includes the improvements for renovation of City Hall lobby and first floor public restrooms. The design
will follow the previously prepared study and report. (UNFUNDED)
PROJECTED COSTS
Five Year Ca pital Program
Classification
FY2015-16
FY2016-17:
FY2017-1 8
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
30,000.00
30,000.00
Construction/ Buildings/ Other Improvements
167,000.00
167,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
3,000.00
3,000.00
TOTAL PROJECTED COSTS
30,000.00
170,000.00
$200,000.00
PROJECTED REVENUES
Five Year C p1tal Pro gram
..
Revenue Source s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
30,000.00
170,000.00
200,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
F- CRA
08/04/15
TOTAL PROJECTED REVENUES
130,000-001170,000.001
$200,000.00
OPERATIONAL IMPACT ACOUN7 _
_ Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
$0.00
08/04/15
Department/Division
Engineering
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:-
NE 8th Av Paving
Project Location:
NE 8th Av from N of Bond Way to N end of
unpaved street
Project Number: 13-060
Project Start Date:
Project End Date:
Projects Description:
Install water main, drainage and pave unpaved section of NE 81h Av, just north of Bond Way. (UNFUNDED)
PROJECTED COSTSFive
. .. ..... .. Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
EngineeringlArchitect Design/ Preliminary Study
27,300.00
27,300.00
Construction/ Buildings/ Other Improvements
182,000.00
182,000,00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
209,300.00
$209,300.00
PROJECTED REVENUES
Five Year C ....Pital Pro gram;
Revenue Source s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
84,300,00
84,300.00
442: Water/Sewer Renewal and Replacement Fund
50,000.00
50,000.00
448: Stormwater Utility Fund
75,000.00
75,000.00
Federal Grants
State Grants
Count Grants
Special Revenue Funds
Assessment District -Special Funding
08/15/15
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
209,300.00
$209,300.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Pave Alleyway
Project Location:
From NE 5th Street to NE 4th Street
between 6th Ave. and 7th Ave.
Project Number: 16-570
Project Start Date:
Project End Date:
Projects Description:
Need to resurface the alleyway which has deteriorated over time. (UNFUNDED)
PROJECTED COSTS
Five Year Ca ital Program..
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
18,750.00
18,750.00
Construction/ Buildings/ Other Improvements
106,250.00
106,250.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
1125,000.00
$125,000.00
PROJECTED REVENUES
Five Year Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
125,000,00
125,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
() .:,-, 08/15/15
TOTAL PROJECTED REVENUES
1125,000.001
$125,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$o.00
08/15/15
Department/Division
Police Department
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
05/21/2014
Project Title:
PD A1C R&R
Project Location:
Project Number: 15-550
Project Start Date:
Project End Date:
Projects Description:
Scheduled replacement of air conditioners based on age, condition and importance; FY 2014-2015; Carrier Package
Unit SOSX-024-301 AA (1996) FY 2014-2015; Carrier Package Unit 50EK-034-E610CA (1999) FY 2015-2016; Carrier
Condenser 38BRC042520 & Air Handier (1998) FY 2015-2016; Carrier Condenser & Air Handier (Unknown) FY
2018-2019; Carrier Package Unit 50AK-040-EE20965 2007) (UNFUNDED)
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
F'Y2017-18
FY2018-19
FY2019.20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment '
30,000.00
80,000.00
110,000.00
Inspections Fees/ Other Fees/ Costs
5,000.00
5,000.00
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
35,000.00
80,000.00
$115,000.00
PROJECTED REVENUES
Five Year Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
35,000.00
80,000.00
115,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
`"°' 0 08/20/15
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
35,000.00
80,000.00
$115,000,00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program..
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/20/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Add. RMS License
Project Location:
Police Dept.
Project Number:
16-563
Project Start Date:
Project End Date:
Projects Description:
Due to our new Intel Ilgence-Led Policing initiative, newly formed sector units need access to the Investigator
Dashboard which is located within RMS so they can follow up on cases and this information can be tracked. As we
moved forward with OSSI RMS, more users are in need of access to utilize the tools the OSSI RMS provides. 25
additional licences are requested. (UNFUNDED)
PROJECTED COSTS
Five
Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
37,500.00
37,500.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingent
TOTAL PROJECTED COSTS
37,500.00
$37,500.00
PROJECTED REVENUES
Five
Year Ca
pital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-201
Totals
334: General Capital Improvements
37,500.00
37,500.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
,i.;� 08/20/15
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
37,500.00
$37,500.00
OPERATIONAL IMPACT ACOUNT
Five
Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
6,000.00
6,000.00
6,000.00
6,000.00
6,000.00
30,000.00
Capital Outlay
TOTAL PROJECTED OPERATING COST
6,000.001_6,000.00
6,000-001
6,000.00
6,000.00
$30,000.00
08/20/15
Department/Division
Police Department
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PD AED's
Project Location:
Project Number:
16.593
Project Start Date:
Pro ect End Date:
Projects Description:
The Police Department currently owns approximately 40 AED units. These Devices have been proven to save lives.
However, they are most effective when available for immediate use. Since Police Officers are often the first
responders on the scene, the Department seeks to increase the number of AEDs available in Police cars by 30.
Additionally, the 40 devices currently owned reached the end of their expected life expectancy In 2010. It Is therefore
necessary to budget replacements. Budgeted at $2,000 ea (which includes batteries and ads).
PROJECTED COSTS
Five
Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design) Preliminary Stud
Construction/ Buildings/ Other Improvements
Equipment
90,000.00
90,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
90,000.00
$90,000,00
PROJECTED REVENUES
. . Five
Year Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
} 06/04/15
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
90,000.00
90,000.00
CRA
TOTAL PROJECTED REVENUES
90,000.00
$90,000.00
OPERATIONAL. IMPACT ACOUNT
Five
Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
$0.00
08/04/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PD ALPR Cameras Project
Project Location:
City Wide
Project Number: 16-651
Project Start Date:
Project End Date:
Projects Description:
Project involves purchase and installation of Automated License Plate Recognition (ALPR) cameras along the barrier
Island In effort to reduce crime in the high tourist area and Identify those who have perpetrated those crimes. Other
police agencies along the barrier island have been discussing ways to reduce crime and Town of Manalapan, Ocean
Ridge (Including Briny Breezes), Boynton Beach, Gulfstream and Highland Beach have agreed to install ALPRs along
their thoroughfares and City of Boca Raton and Town of Palm Beach already operate ALPRs on their roadways. This
project includes cameras, installation, software configuration, cabling, modems, and onsite annual support.
(UNFUNDED)
PROJECTED COSTS
Five Year Ca ital Program.
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
75,000.00
75,000.00
150,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
75,000.00
75,000.00
$150,000.00
PROJECTED REVENUES
Five Year Ca ital Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
08/24/15
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
75,000.00
75,000.00
150,000.00
CRA
TOTAL PROJECTED REVENUES
75,000.00
75,000-001
$150,000.00
OPERATIONAL IMPACT ACOU.NT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/24/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PD Corrupter Room Relocat
Project Location:
Police Dept
Project Number: 16-652
Project Start Date:
Project End Date:
Projects Description:
Currently our Halon system Is haused at the Police Main Building. More sealable space is needed as the Halon system
was not Intended to be utilize in current space and poses potential health risk and damage to records stored in
adjacent room. Fire Department performed inspection and is in support of a new structure. The Halon system
inadvertently deployed during FY 09-10. This was first requested in 2010 for FY 10111 and was approved for FY 11112
but deferred due to loss of funding. (UNFUNDED)
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
39,000.00
39,000.00
Construction/ Buildings/ Other Improvements
221,000.00
221,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL. PROJECTED COSTS
1260,000.001
$260,000.00
PROJECTEDREVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
260,000.00
260,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
08/15/15
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
1
1260,000.001
$260,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital.Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PD Impact Doors Windows
Project Location:
Police Dept
Project Number:
16-653
Project Start Date:
Project End Date:
Projects Description:
Main Police Department building front doors upgrade to the Impact doors; also windows upgrade with roll down
shutters. (UNFUNDED)
PROJECTED COSTS
Five.Year
Capital
Program
Classification
FY2015- 16
FY201 6-17
FY201 7-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
45,000.00
45,000,00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
1 45,000.001
1 $45,000.00
PROJECTED REVENUES
Five
Year Capital.
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
25,000.00
25,000.00
Federal Grants
State Grants
20,000.00
20,000.00:
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
08/15/15
7
CRA
TOTAL PROJECTED REVENUES
1
45,000-001
1
1
1 $45,000.00
OPERATIONAL IMPACT ACOUNT
Five
Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capitai Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
In -car Video/Equip. Veh.
Project Location:
Police Dept.
Project Number: 16-562
Project Start Date:
Project End Date:
Projects Description:
The equipment is used daily during routine traffic enforcement and community patrol. In -car video has the ability to
secure solid evidence for criminal prosecution, real time recording of events, and enhanced officer safety. It also
reduces likelihood of civil liability claims. Other equipment includes command boxes and racks/docking stations.
This is equipment purchased annually for any new vehicles that are on fleet's replacement schedule due to reaching
life expectancy (Or vehicles in need of replacement for other reasons)
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminar Study
Construction/ Buildings/ Other Improvements
Equipment
100,000.00
100,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
100,000.00
$100,000.00
PROJECTED REVENUES
Five Year Capital Program ..,. .
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
/ / 09/01/15
Assessment District -Special Funding
Bond/Bank Financing/Other
100,000.00
100,000.00
CRA
TOTAL PROJECTED REVENUES
100,000.00
$100,000.00
OPERATIONAL IMPACT ACOUNT -
Five Year Ca ital. Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
09/01/15
Depart ment/DivlsIon
New project
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Date Submitted
Project Title:
Project Location:
Project Number:
Latent Print Station
Police Dept.
16-555
Project Start Date:
Project End Date:
Projects Description:
Latent Print Station to be used for latent print Input and review. Currently, the Department Is performing this
function at the outside agency that allows one of our CSIs to use their machine. This is done at the outside agency
convenience and can end at any time. It would be more effective to have machine on premises as good amount of
time is spent traveling to the agency and back,as well as input and review of latent prints would be able to be
completed promptly. This item has been requested since 2007. This would allow immediate access to over 600,000
fingerprint and 300,000 palm print files in the PESO database, over 16,000,000 fingerprint and 2,500,000 palm print
files in FDLE database and approx. 80,000,000 FBI files. High number of crimes are committed by transients passing
through rehab facilities with no criminal record in Florida but have criminal record in other states and may be
identified through FBI database. (UNFUNDED)
PROJECTED COSTS:
Five
Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
Equipment
75,000.00
75,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingent
TOTAL PROJECTED COSTS
75,000,001
1
1
$75,000.00
PROJECTED REVENUES
Five Year Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19 FY2019-20
Totals
334: General Capital Improvements
1 75,000,001
1
1 75,000.00
06/20/15
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
i 75,000.00
$75,000.00
OPERATIONAL IMPACT ACOUNT
Five
Year Capital
Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
11,500.00
11,500.00
11,500.00
11,500.00
46,000.00
Capital Outlay
TOTAL PROJECTED OPERATING COST
i 11,500.00
11,500,00
11,500.00
11,500.00
$46,000.00
08/20/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Noritsu Photo Printer Rep
Project Location:
Police Dept.
Project Number:
16-553
Project Start Date:
Project End Date:
Projects Description:
Photo printer replacement is needed due to equipment age and performance Issues. The equipment is operational
with some issues (Lines appearing on photos) but maintenance for the printer is no longer available and
replacement parts are no longer being manufactured. When current parts supplies are exhausted, printer will no
longer be operational. This machine prints photos used for court. Due to the nature of Images printed, options would
be limited on what can be done if the machine breaks without parts to fix It.
PROJECTED COSTS.
Pirie Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
Equipment
36,000.00
36,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
36,000.00
$36,000.00
PROJECTED REVENUES
Five
Year CapItaI
P rog ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
09/01/15
Special Revenue Funds
Assessment District -S eclat Funding
Bond/Bank Financing/Other
36,000.00
36,000.00
CRA
I
I I
I
TOTAL PROJECTED REVENUES
i 36,000,00
$36,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
$0.00
09/01/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Range Track Syst. Repl.
Project Location:
Police Range
Project Number:
16-560
Project Start Date:
Project End Date:
Projects Description:
Current system In place Is from 1987. Parts for repairs are becoming harder to find and range is in need of
replacement in order to continue meeting our training needs. (Current unit is not rifle rated). The range is used for
firearms training and firearms qualifications/certifications are a necessity and of high Importance. New range would
allow for rifle training with assurance that control unit(s) would be protected even if hit with projectile. (UNFUNDED)
PROJECTED COSTS
_ Five
Year Ca 1tal Program
Classification
FY2015-16
FY2016-17
FY2017-18 FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
80,000.00
80,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingent
TOTAL PROJECTED COSTS
80,000.00
i
$80,000.00
PROJECTED REVENUES
Five
Year ,Capltal
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
08/24/15
Assessment District -Special Funding
Bond/Bank Financia /Other
80,000.00
80,000.00
CRA
TOTAL PROJECTED REVENUES
80,000.00
$80,000.00
OPERATIONAL IMPACT ACOUNT
- Five
Year Ca
Dital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/24/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Tactical Obs. Platform
Project Location:
Police Dept.
Project Number:
16-568
Project Start Date:
Project End Date:
Projects Description:
Tactical observation platform can be used to help reduce crime, collect evidence and control crowds. It is portable,
and can be deployed in various areas especially during Special Events.
PROJECTED COSTS .
Five,Year
Capital
Program
Classification
FY2015.16
FY2016-17
FY2017.18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements.
73,000.00
73,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
73,000,00
$73,000.00
REVENUES
F!Ve:Year
.Capitalro
Pm
raPROJECTED
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-1 B
FY2018-19
FY2019-20
Totals
501: Central Garage Fund
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
73,000.00
73,000.00
08/19/15
CRA
TOTAL PROJECTED REVENUES
73,000.00
$73,000.00
OPERATIONAL IMPACT ACOUNY
Five
Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18 FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/19/15
Department/Division
Parks and Recreation
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PR-Atl Dunes Nature TO
Project Location:
Atlantic Dunes Park
Project Number: 16-586
Project Start Date:
Project End Date:
Projects Description:
Remove/replace exotic plants with native species $70,000. Cover nature trail (818' x 6') w/elevated boardwalk and one
observation platform (pressure treated wood, $95,000) with educational signage throughout the trail. Parks and
Recreation will research grant funding. (UNFUNDED) Note: This project will only move to construction if funding from
a Grant is approved.
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
23,600.00
23,600.00
Construction/ Buildings/ Other Improvements
25,000.00
157,600.00
182,600.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
2,364.00
2,364.00
TOTAL PROJECTED COSTS
25,000.00
183,564.00
$208,564.00
PROJECTED REVENUES
Five Year Ca ital Program .
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
25,000,00
5,840.00
30,640.00
Federal Grants
State Grants
177,924.00
177,924.00
County Grants
Special Revenue Funds
Assessment District -Special Funding
08/15/15
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
25,000.00
183,564.00
$208,564.00
OPERATIONAL IMPACT ACOUNT
. ... dive Year Capital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
Parks and Recreation
City of Delray Beach -
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title.
PR-Ballfields Control Sys
Project Location:
Various parks
Project Number:
16-600
Project Start Date:
Project End Date:
Projects Description:
Install a Control Link System at the following ball -fields to control, monitor, and manage the facility lighting: Pine
Grove $12,000.00 Currie Commons $12,000.00 Merritt Park $12,000.00 Miller Park $24,000.00 Note: Analysis on
Payback/forced reduction or reassignment is requ!red.
PROJECTED COSTS
Five
Year Ca'
ital Program.
g ;
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
60,000.00
60,000-00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
60,000.001
$60,000.00
PROJECTED REVENUES
Five
Year Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
09/01/15
Bond/Bank Financing/Other
60,000.00
60,000.00
CRA
TOTAL PROJECTED REVENUES
60,000.00
$60,000.00
OPERATIONAL IMPACT ACOUNT
Five,Year Ca
31tal Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
09/01/15
Department/Division
Parks and Recreation
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PR-Hilltopper Lights R&R
Project Location:
2501 Seacrest Avenue
Project Number: 16-611
Project Start Date:
Project End Date:
Projects Description:
Replace Sports Lighting fixtures at Hilltopper Stadium. Lighting system is approximately 30 years old and need to be
upraded for Sports Destination events through Palm Beach County Commission, Price includes: New Musco fixtures
and hardware; New control Link cabinet; Removal and Installation; 40 foot-candles.
PROJECTED COSTS
Five Year. C p1tal Program
Classification
FY2015-16
PY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
Equipment
175,300.00
175,300.00
Inspections Fees/ Other Fees/ Costs
Public Arts Programl Contingency
TOTAL, PROJECTED COSTS
175,300.00
$175,300.00
PROJECTED REVENUES
Five Year Ca
ital Program.
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
175,300.00
175,300.00
09/01/15
CRA
TOTAL, PROJECTED REVENUES
175,300.00
$175,300.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19 FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL. PROJECTED OPERATING COST
$0.oa
09/01/15
Department/Division
Parks and Recreation
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PR -LED Message Signs
Project Location:
Linton/1-95, Atlantic/1-95, South & North
Federal Highway
Project Number: 16-601
Project Start Date:
Project End Date:
Projects Description:
Install four (4) double sided LED message display signs at entrances into the City: Linton Blvd. and 1-95, Atlantic Ave.
and 1-95, South and North Federal Highway. These signs will replace the present signs used to market events and
programs in the City. Information can be changed and updated from one central location. $57,800/sign (UNFUNDED)
PROJECTED. COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
254,700.00
254,700.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
254,700.00
$254,700.00
PROJECTED REVENUES
Five Year Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
254,700.00
254,700.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
y 08/15/15
CRA
TOTAL PROJECTED REVENUES
254,700.001
1
$254,700.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017.18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$Q•00
06/15/15
Department/Division
Parks and Recreation
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
06/11/2010
Project Title.,
Little Fenway Park Bldg
Project Location:
Robert P. Miller Park
Project Number: 11-022
Project Start Date:
Project End Date:
Projects Description:
Construct a new concession building and restroom at the Little Fenway field at Robert P. Miller Park. $305,500 from
2012/2013 project account to be rolled over to complete project funding (UNFUNDED).
PROJECTED COSTS
Five Year Ca. ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-201
Totals
Land Acquisition
Englneering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
154,500.00,
154,500.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
.154,500.100
$154,500.00
PROJECTED REVENUES
Five Year Ca plial Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334., General Capital Improvements
154,500.00
154,500.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bo nd/Bank Financing/Other
CRA
I
L
08/20/15
14-
TOTAL PROJECTED REVENUES
154,500.00
$154,500.00
OPERATIONAL. IMPACT ACOUNT _ .. Five Year. Ca ital. Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/20/15
Department/Division
Parks and Recreation
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PR -Miller Park Gas Mit
Project Location:
Miller Park
Project Number: 16-597
Project Start Date:
Project End Date:
Projects Description:
Recommended protective and risk reduction measures related to the subsurface gas issue. Gases, methane and
carbon dioxide, are commonly found In landfills. (UNFUNDED)
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
38,205.00
38,205.00
Construction/ Buildings/ Other Improvements
212,675.00
212,675.00
Equipment
Inspections Feesl Other Fees/ Costs
Public Arts Program/ Contingency
3,820.50
3,820.50
TOTAL PROJECTED COSTS
38,205.00
216,495.50
$254,700.50
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
38,205.00
216,495.00
254,700.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
�, 08/15/15
TOTAL PROJECTED REVENUES
1 38,205.001216,495.001
1 $254,700,00
OPERATIONAL IMPACT ACOUNT
....l=ive Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
Parks and Recreation
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PR -Miller Park Shade Syst
Project Location:
1905 SW 4th Av
Project Number:
16-592
Project Start Date:
Project End Date:
Projects Description:
Shade system to cover bleachers at Miller Park to protect spectators from weather and foul balls. Shade system
would be installed over (8) 18'x12'x8'5 row bleachers and (2) 30'x22'x12' row bleachers. Estimated Cost $90,000.00.
(UNFUNDED) Note: $90,000 shall be funded if a Grant is approved.
PROJECTED COSTS
five
Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
90,000.00
90,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
90,000.00
$90,000.00
PROJECTED REVENUES
- Five
Year Ca
3 ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
90,00000
90,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
" 08/15/15
r
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
90,000.00
$90,000.00
OPERATIONAL IMPACT ACOUNT
_ .. Five Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
Parks and Recreation
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PR -Office Expansion
Project Location:
320 SW 4th St
Project Number: 16-587
Project Start Date:
Project End Date:
Projects Description:
Expand office space at Parks Maintenance complex by expanding Into bay not presently used for equipment storage.
(UNFUNDED) Note: These funds shall be eliminated if an Outsource for Landscape Maintenance RFP is approved (FY
17118 and FY 18119)
PROJECTED COSTS
Five Year. Ca ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
13,500.00
13,500.00
Construction/ Buildings/ Other Improvements
90,000.00
90,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingent
TOTAL PROJECTED COSTS
13,500.00
90,000.00
$103,500.00
PROJECTED REVENUES
Five Year Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
13,500.00
90,000.00
103,500.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
`� 08/15/15
CRA
TOTAL PROJECTED REVENUES
1
13,500.001
90,000.001
1
$103,500.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
Parks and Recreation
City of Defray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PR -Pompey Gym PA Syst
Project Location:
1101 NW 2nd Sr
Project Number:
16-602
Project Start Date:
Project End Date:
Projects Description:
Install a PA Sound System In Pompey Park gym. System Includes: speakers, amplifiers, processors, mixer, and a
metal cabinet to secure the system. The PA System can be used for sport events and stage events such as
speeches and plays. (UNFUNDED)
PROJECTED COSTS
Five Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Bulldingsl Other Improvements
Equipment
25,000.00
25,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
25,00M01
$25,000.00
PROJECTEDREVENUES
Five Year Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
25,000.00
25,000,00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
08/15/15
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
25,000.00
$25,000.00
OPERATIONAL; IMPACT ACOUNT
Five
Year Ca
ltal Program
Classification
FY2015-16
FY2016-17
FY2017-16
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
Parks and Recreation
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PR -Pompey Plc -Shade Syst
Project Location:
1101 NW 2nd St
Project Number:
16-588
Project Start Date:
Project End Date:
Projects Description:
Shade system that covers bleachers to protect spectators from weather and foul balls. Shade system would be
Installed on 2 Little League fields & Major League bleachers.(3 systems @ $22,000 ea.) (UNFUNDED) Note: This
project will move forward with funding if a Grant! approved In FY18/19.
PROJECTED COSTS
Five Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildingsl Other Improvements
Equipment
66,000.00
66,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
66,000,001
$66,000.00
PROJECTED REVENUES
Five Year Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
66,000.00
66,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
°., ` OB/I 5115
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
66,000.00
$66,000.00
OPERATIONAL IMPACT ACOUNT
Five
Year Ca
Ditall Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
Parks and Recreation
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Pompey Pool Redesign
Project Location:
1101 NW 2nd St Note: This project will
move forward with funding if a Grant is
approved In FY 15116.
Project Number: 14-027
Project Start Date:
Project End Date:
Projects Description:
Redesign Kiddie Pool to a zero -depth entry pool w/water features. Add colorful umbrellas & tables for deck area,
attracting a more diverse population. Currently, we are not in compliance with the new ADA standards for accessiblity
at pools. Parks and Recreation submitted a request for grant funding to FRDAP In September, 2012. Funds have not
been awarded as of this date. (UNFUNDED)
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
54,000.00
54,000.00
Construction/ Buildings/ Other Improvements
300,600.00
300,600.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
5,400.00
5,400.00
TOTAL PROJECTED COSTS
1 54,000.00
306,000.00
$360,000.00
PROJECTED REVENUES
Five Year Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
54,000.00
155,700.00
209,700.00
Federal Grants
State Grants
150,300.00
150,300.00
County Grants
Special Revenue Funds
,' 0
1114--�"% 7 08/15/15
Assessment District -Special Funding
Bond/Bank Financia /Other
CRA
TOTAL PROJECTED REVENUES
54,000.00
306,000.00
$360,000.00
OPERATIONAL IMPACT ACOUNT
- l=ive Year Ca ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
Parks and Recreation
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PR-Hilltopper New Bldg
Project Location:
2501 Seacrest Ave
Project Number: 16-599
Project Start Date:
Project End Date:
Projects Description:
The new building would consist of new restroom facilities, concession stand, stand, storage and patio area. This new
facility would be used by user groups such as, Delray Rocks/Cheerleaders, Delray Beach Athletic Club, Village
Academy, etc. (UNFUNDED)
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
58,500.00
58,500.00
Construction/ Buildings/ Other Improvements
325,650.00
325,650.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
5;850.00
5,850.00
TOTAL PROJECTED COSTS
1 58,500.00
331,500.00
$390,000.00
PROJECTED REVENUES
Five Year Ca ital Pro ram
Revenue Source(s)
FY2015-16
F'Y2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
58,500.00
331,500.00
390,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
A 08/15/15
CRA
TOTAL PROJECTED REVENUES
1 58,50M01331,500-001
$390,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
Public Works
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title.
Keyless Lock/Entry System
Project Location:
434 S Swinton Ave
Project Number: 16-675
Project Start Date:
Project End Date:
Projects Description:
To Install keyless lock & security system at various buildings; FY 2014-2015; ESD Complex FY 2015.2016; City
Hall/City Attorney FY 2016-2017; Police/Fire/Parks FY 2017-2018; Pollceffire/Parks (UNFUNDED)
PROJECTED COSTS
Five. Year Ca Ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
25,000.00
25,000.00
25,000.00
25,000.00
100,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
25,000.00
25,000.00
25,000.00
25,000.00
$100,000.00
PROJECTED REVENUES
Five Year Ca
Ital.Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019.20
Totals
334: General Capital Improvements
25,000.00
25,000.00
25,000.00
25,000.00
100,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
!..07/29/15
�L
TOTAL PROJECTED REVENUES 25,000.00
25,000.00
25,000.00
25,000-001
1 $100,000.00
OPERATIONAL IMPACT ACOUNT
_Flve Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/29/15
Department/ Divi sl on
Public Works
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PW Locker Rm Maintenance
Project Location*
434 S Swinton Ave
Project Number:
16-614
Project Start Date:
Project End Date:
Projects Description:
To replace all the existing lockers, bathroom partitions and sinks 1 cabinets In two (2) locker rooms. (UNFUNDED)
PROJECTED COSTS
Five Year Ca.
31tal Pro gram
Classification
FY2015-16
FY2016-17'FY2017-18
FY2018-19IFY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
25,000,00
25,000.00
Equipment
-
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
1 25,000.001
1
1 $25,000.00
PROJECTED REVENUES
Five
Year Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
25,000.00
25,000,00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
08/15/15
TOTAL, PROJECTED REVENUES
125,000.001
1
1
$25,000.00
OPERATIONAL IMPACT ACOUNT
Five
Year Ca
ltal Program .
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
Public Works
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PW Parking FY 14
Project Location:
434 S Swinton Ave
Project Number:
16-607
Project Start Date:
Project End Date:
Projects Description:
Public Works complex - resurface all the blacktop, stripe all parking spaces and paint all curbs and stops.
(UNFUNDED)
PROJECTED CASTS
Five
Year Ca
Atal Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
55,000.00
55,000.00
Construction/ Buildings/ Other Improvements
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
55,000.00
$55,000.00
PROJECTED REVENUES
Five
Year Capital
Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
1=Y2019-20
Totals
334: General Capital Improvements
55,000.00
55,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
I._ 08/15/15
CRA
TOTAL_ PROJECTED REVENUES
1
55,000.00
$55,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capt#al
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Tatals
Personnel
Other Operating
Capital Outlay
TOTAL. PROJECTED OPERATING COST
$0.00
08/15/15
Department/Division
Engineering
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
06/23/2014
Project Title;
RR X-Ing Maintenance FY15
Project Location:
Various Crossings (UNFUNDED)
Project Number: 15-010
Project Start Date:
Project End Date:
Projects Description:
Annual cost of FEC crossing maintenance. Typically one of the eleven crossing gets replaced each year.
Reimbursement to FEC for repairs to S.E. 10th Street.
PROJECTED; COSTS
Fwe YearCapital',Program
Classificatlon
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
375,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
$375,000.00
PROJECTED REVENUES
Five Year C6bit6l,Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
375,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
{1 08/19/15
TOTAL PROJECTED REVENUES 1
75,000.001
75,000.001
75,000MI
75,000.001
75,000,00T$375,000,00
OPERATIONAL IMPACT ACOUN7
Five Year Ca it6LProgram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/19/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Signalized Crosswalk
Project Location:
City Limits
Project Number:
16-528
Project Start Date:
Project End Date:
Projects Description:
Installation of a LED Signalized Crosswalk to act as a pilot project with the City. (UNFUNDED)
PROJECTED COSTS
Five Year Ca
31tal Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
60,000.00
60,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
60,000.00
$60,000.00
PROJECTED REVENUES
Fivd
Year Capital
Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19 FY2019-20
Totals
334: General Capital Improvements
60,000.00
60,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
I
07/29/15
TOTAL PROJECTED REVENUES
1 60,000.00
$60,000.00
OPERATIONAL IMPACT ACOUNT
Five
Year Ca
pital Pro rare _ _ . .
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
07/29/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015.16 to FY2019-20
New project
Date Submitted
Project Title:
St Lt Upg SE 7 Ave 2nd St
Project Location:
SE 7th Ave. between Atlantic Ave. and 2nd
Street
Project Number;
16-657
Project Start Date:
Project End Date.
Projects Description:
Street lighting upgrade to premium lighting (LED) on SE 7th Avenue between Atlantic Avenue and 2nd Street
(UNFUNDED)
PROJECTED COSTS
Five
Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
25,000.00
25,000.00
E uipment
Inspections Feesl Other Fees/ Costs
Public Arts Program/ Contingent
TOTAL PROJECTED COSTS
25,000.00
$25,000.00
PROJECTED REVENUES'
Five
Year Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
25,000.00
25,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
08/20/15
CRA
TOTAL PROJECTED REVENUES
1 25,000.00
$25,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital
program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
06/20/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015.16 to FY2019-20
New project
Date Submitted
Project Title:
Teen Center Roof Repl
Project Location:
Teen Center
Project Number: 16-658
Project Start Date:
Project End Date:
Projects Description:
Replace Roof at Teen Center s/Reflective Roof
PROJECTED COSTS
FiveYear Ca
ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
100,000.00
100,000.00
E ui ment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
1100,000.001
$100,000.00
PROJECTED REVENUES
Five Year Ca ital Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
100,000.00
100,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
09/01/15
TOTAL PROJECTED REVENUES
1100,000.00
$100,000.00
OPERATIONAL. IMPACT ACOUNT
Five Year. Capita! Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
$0.00
09/01/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015.16 to FY2019-20
New project
Date Submitted
Project Title:
Traffic Calming Measures
Project Location:
City Limits.
Project Number: 16-523
Project Start Date:
Project End Date:
Projects Description:
Procure 5 HDPE traffic calming measures humps). (UNFUNDED)
PROJECTED COTS _
_ Flve Y®aw.Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
20,000.00
20,000.00
Construction/ Buildings/ Other Improvements
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
250,000.00
Equipment
Inspections Feesl Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
70,000.001
50,000.001
50,000.00
50,000.00
50,000.001
$270,000.00
PROJECTED REVENUES
Five Year Capita i Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
70,000.00
50,000.00
50,000.00
50,000.00
50,000.00
270,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
~ 07/29/15
TOTAL PROJECTED REVENUES
1 70,000.00150,000-001
50,000.00
50,000.00
50,000.00 $270,000.00
OPERATIONAL IMPACT ACOUNT _
_. Five Year Capital Prog ram.
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/29/15
Department/Division
Engineering
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Zeder Av
Project Location.
Project Number: 16-674
Project Start Date:
Project End Date:
Projects Description:
Pave Zeder Ave utilizing CDBG funding. Add improvements to underground utilities (water, sewer, and storm).
(UNFUNDED)
PROJECTED COSTS
Five Year Ca ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
120,000.00
120,000.00
Construction/ Buildings/ Other Improvements
669,800.00
669,800.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
10,200.00
10,200,00
TOTAL PROJECTED COSTS
1120,000.001680,000.001
1 $800,000.00
PROJECTED REVENUES
Five Year Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19 FY2019-20
Totals
118: Community_Development f=und
334: General Capital Improvements
120,000.00
880,000.00
500,000.00
442: Water/Sewer Renewal and Replacement Fund
250,000.00
250,000.00
448: Stormwater Utility Fund
50,000.00
50,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
®� 08/20/15
mow. M�
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
120,000,00
680,000.00
$800,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/20/15
Department/Division
Environmental Services Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
05/16/2014
Project Title:
Rclmd Wtr Cstmr Conn FY15
Project Location:
City Wide FY 16-20.
Project Number: 15-014
Project Start Date:
10/01/2014
Project End Date:
0.913012015
Projects Description:
Connect individual customers in the recently constructed Reclaimed system after system is constructed and accepted
by the city-
-.
PROJECTEDC�S.TS ' ..::,
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
220,000.00
220,000.00
220,000.00
220,000.00
880,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
220,000.00
220,000.00
220,000.00
220,000.00
$880,000.00
PROJ CT p.: V Nutb ' :
ewe Year Capita'
wogr
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
441-5161: Water/Sewer New Capital
220,000.00
220,000.00
220,000.00
220,000.00
880,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
.Assessment District -Special Funding
07/14/15
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES220,000.00 220,000.00 220,000.00 220,000.00 $880,000.00
OPERATIONAL: IMPACT `bC,0'UN ...:` .Year Capital I�ro��am ..
Classification FY2015-16 FY2016-17 FY2017-18 FY201&19 FY2019-20 Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST $0.00
07/14/15
Department/Division
Environmental Services Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
06/15/2011
Project Title:
Reclaimed Water, Area 128
Project Location:
AIA Casuarina Road to Poinsettia Road
Project Number: 12-009
Project Start Date:
Project End Date:
12129/2017
Projects Description:
Phased construction of expanding the Reclaimed Water transmission and distribution system on the Barrier Island from
Casuarina Road south to Poinsettia Rd. Construction of reclaimed water system serving area referred to as Area 12B. AIA
south from Casuarina Road to Poinsettia Road.(consulting fees include construction administration; $2.5 Million total; see
442 w/s and 448 storm).
PROJECTED COSTS
Five Year. Ca ital Program,:,.
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engine ring/Architect Design/ Preliminary Study
180,000.00
180,000.00
Construction/ Buildings/ Other Improvements
1,165,000.00
1,165,000.00
Equipment
Inspections Fees/ Other l=ees/ Costs
Public Arts Program/ Contingent
TOTAL. PROJECTED COSTS
L 1,345,000.00
$1,345,000.00
PROJECTED REVENUES
Five Year: Ca
ital Program
Revenue Sources
FY2015-16
FY2016.17
FY2017-18
FY2018-19
FY2019-20
Totals
441-5161: Water/Sewer New Capital
1,200,000.00
1,200,000.00
442: Water/Sewer Renewal and Replacement Fund
70,000.00
70,000.00
448: Stormwater Utility Fund
75,000.00
75,000.00
Federal Grants
State Grants
07/29/15
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
1,345,000.00
$1,345,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca Ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/29/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Now project
Date Submitted
Project Title:
Recl. Water Area 12-C
Project Location:
Al A, Lewis Cove to Del Haven Drive
Project Number: 16-547
Project Start Date:
Project End Date;
Projects Description:
Design and installation of reclaimed water system serving area referred to as Area 12-C; AIA, south at Lewis Cove to Del
Haven Dr, and east side of AM to Casuarina Rd.(co suiting fees include construction administration)
PROJECTED COSTS...
. .... . Five Year Ca pital Program
Classification
FY2015-16
FY2016.17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
140,000.00
60,000-00
200,000.00
Construction/ Buildings/ Other Improvements
1,720,000,00
1,720,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
140,000.00i
1,780,000.00,
$1,920,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19 FY2019-20
Totals
441-5161., Water/Sewer New Capital
140,000.00
1,460,000.00
1,600,000.00
442: Water/Sewer Renewal and Replacement Fund
120,000.00
120,000.00
448: Stormwater Utility Fund
200,000.00
200,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment Dist rl ct-Specl al Funding
07/29/15
Bond/Bank Financing/Other
CRA
TOTAL. PROJECTED REVENUES
140,000.00
1,780,000.00
$1,920,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/29/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Date Submitted
Project Title:
Recl. Mst. Plan Update
Project Location:
City Wide
Project Number:
16-539
—
Project Start Date:
Project End Date:
Projects Description:
Update the 2003 Reclaimed Water System Master Plan; review area (communities) connections for feasibility,
priority, and update cost estimates.
........... . P :Year 'C6 ft M'
Pro9" rim
I1 7 ......... .. ....... . . --- . .......... ...
Classification
FY2015-16
FY2016-17
FY2017-18.
FY2018-19
FY2019-20
Totals
Land Ac uisition
Engineering/Architect Design/ Preliminary Study
80,000.00
80,000.00
Construction/ Buildings/ Other Improvements
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
80,0007001
$80,000,00
.... ....�Cbp
Five :.Ybae:
ital;;Pro "ram
Revenue So urce(s)
FY2015-16
FY2016-17IFY2017-18
FY2018-19
FY2019-20
Totals
441-5161: Water/Sewer New Capital
80,000.00
80,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
07107/15
CRA
TOTAL PROJECTED REVENUES 80,000.001 1 1 1 1 $80,000.00
.
OPERATIONAL LMPACT ACOUNT. -Five Year. Capital: program . ..
Classification FY2015-16 FY2016-17 FY2017-18 FY2018-19 FY2019-20 Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST $0.00
07/07/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Recl. Water Area 6
Project Location:
Lake Ida Rd, Rainberry Bay
Project Number: 16-538
Project Start Date:
Project End Date:
Projects Description:
Design and installation of reclaimed water system serving area referred to as Area 6, Lake Ida Rd, Rainberry Bay
(consulting fees include construction administration)
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
. Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
130,000.00
50,000.00
180,000.00
Construction/ Buildings/ Other Improvements
1,000,000.00
1,000,000.00
Equipment:
Inspections Fees/ Other Feesl Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
130.000.00
1,050,000.00
$1,180,000.00
- PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
441-5161: Water/Sewer New Capital
130,000.00
1,050,000.00
1,180,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
07/14/15
'Z
TOTAL PROJECTED REVENUES
130,000.00 1,050,000.00
$1,180,000.00
OPERATIONAL IMPACT'ACOUNT :
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/14/15
Department/Division
Environmental Services Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Reclaimed Water, Area 10
Project Location:
NW 1st Ave from NW 2nd Street to Atianic
Ave, and south along SW 2nd Ave from
Atlanic to SW 4th Street.
Project Number: 16-595
Project Start Date:
Project End Date:
Projects Description:
Phased construction expanding the Reclaimed Water transmission and distribution system along NW 1st Ave and SW
2nd Ave to serve City Hall, Community Center, Old School Square, PD, County Courthouse, ESD Complex, and Park
Maintenance.
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
285,000.001
285,000.00
Construction/ Buildings/ Other Improvements
1,200,000.00
1,200,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
285,000.00
1,200,000.00
$1,485,000.00
PROJECTED REVENUES
Five Year
Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
441-5161: Water/Sewer New Capital
285,000.00
1,200,000.00
1,485,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
/07/14/15
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
285,000.00
1,200,000,00
$1,485,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19 FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0,00-
07/14/15
Department/Division
Environmental Services Division
City of Delray Beach
CII' project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Reclaimed Water; Area 8
Project Location:
Barwick Road, north of Lake Ida Road.
Project Number: 16-594
Project Start Date:
Project End Date:
Projects Description:
Phased construction expanding the Reclaimed Water transmission and distribution system to serve Barwick Road
neighborhoods.
PROJECTED.COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
90,000.00
90,000.00
Construction/ Buildings/ Other Improvements
600,000.00
600,000,00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
90,000.00
600,000.00
$690,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Sources)
FY2015-16
FY2016-17
FY2017-18 FY2018-19
FY2019-20
Totals
441-5161: Water/Sewer New Capital
90,000.00
600,000.00
690,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
07/14/15
TOTAL PROJECTED REVENUES
90,000.0a 600,000.00 $690,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/14/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Date Submitted
Project Title:
SCRWWTP City Cont. CIP
Project Location:
1801 North Congress Ave.
Project Number: 16-535
Project Start Date:
Project End Date:
Projects Description:
City of Delray Beach share of anticipated costs associated with Capital improvement projects at the wastewater
treatment plant.
..bAQTEP.COST8 ......
... ......... . ..
Tiv bry ilt-�COOIUW Program:
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
500,000.00
550,000.00
600,000,00
650,000.00
700,000.00
3,000,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
500,000.001550,000.00�600,000.00–r65-0,-00-0.00
700,000-00
$3,000,000.00
...........
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY201 8-19
FY2019-20
Totals
441-5161: Water/Sewer New Capital
500,000.00
550,000.00
600,000-001650,000.00
700,000.00
3,000,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District-Special.Funding
Bond/Bank Financing/Other
CRA
07/07/15
TOTAL PROJECTED REVENUES 500,000.00 550,000.00 600 000.00 650,000.00 1 700,000.00 $3,000,000.00
OpN✓RA7iONAL IMPACT.ACOUN .. �irre',Year C Ital f+rn ram,.
Classification FY2015-16 FY2016-17 FY2017-18 FY2018-19 FY2019-20 Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST $0.00
07107/15
Department/Divislon
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Date Submitted
Project Title:
Aband./Demo. LS 80
Project Location:
3685 Lake Ida Road
Project Number: 16-543
Project Start Date: —
Project End Date:
Projects Description:
Process abandonment of lift station and demolish.
PROJECTED COSTS
Flve.Year C... pital Program
Classification
Land Acquisition
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
i 15,000.00
85,000.00,
15,000.00
85,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
100,000.001
$100,000.00
Five Yeartal.Pro ram
fROJEtTED. R15VENUES: Ca, pi
Revenue Source(s) FY2015-16 FY2016-17 FY2017-18 FY2018-19 FY2019-20 Totals
442: Water/Sewer Renewal and Replacement Fund
100,000.00
100,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
07/06/15
TOTAL PROJECTED REVENUES 110o,000.001
I
$100,000.00
OPERATIONAL IMPACT ACOUNT
l=ive Year. Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/06/15
Department/Division
Water -Sewer Network
City of Deiray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
Delray Shores WM Ph 3
Project Location:
Delray Shores Neighborhood
Project Number: 15-054
Project Start Date:
Project End Date:
Projects Description:
Upgrade of existing 4" and 6" water mains to 8" Including ROW restoration. Delray Shores W/M Phase 3 and 4.
PROJECTED COST$
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
91,000.00
91,000.00
Construction/ Buildings/ Other Improvements
983,000.00
983,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
91,000.00
983,000.00
$1,074,000.00
`PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
91,000.00
983,000.00
1,074,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
7/ 07/30/15
TOTAL PROJECTED REVENUES
1 91,000,001
1983,000.001$1,074,000.00
OPI~RATIONAL IMPACT ACOUNT
Five. Year Capital Pra gram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL. PROJECTED OPERATING COST
$0.00
07/30/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
El Dorado Ln WIVI Upgrade
Project Location:
Eldorado Lane between NW 8th Ave. to east
end of cul-de-sac.
Project Number: 15-051
Project Start Date:
Project End Date:
Projects Description:
Construction of water main upgrade along Eldorado Lane; between NW 8th Ave. to end cul-de-sac, approx. 1000 LF of
water main. Designed In -House engineering.
Five Year C
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
225,000.00
225,000.00
Equipment
Ins2ections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
225,000,001
$225,000.00
PROJECTED REVENUES:
Five Year C pital Program
442: Water/Sewer Renewal and Replacement Fund
225,000.00
225,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
O7/29/15
� (� /
TOTAL PROJECTED REVENUES
225,000.00
$225,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Program
Classl#Ication
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/29/15
partment/Division
lities
ect Title:
Tank MaInt - FY16-20
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Project Location:
City Wide
Existing project
Submitted
Project Number: 16-629
Project Start Date:
Project End Date:
rojects Description:
nnual cost for full asset maintenance of elevated water tank per RFP 2015-33.
PROJECTED COSTS Five Year Capital Program
Classification FY2015-16 FY2016-17 FY2017-18 FY2018-19 FY2019-20 Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements 70,000.00 25,000.00 25,000.00 25,000.00 25,000.00 170,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
OTAL PROJECTED COSTS 70,000.00 25,000.00 25,000.00 25,000.00 25,000.00 $170,000.00
PROJECTED REVENUES
Revenue Source(s)
WaterlSewer Renewal and Replacement Fund
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
Five Year Capital Program
FY2015-16 FY2016-17 FY2017-18 FY2018-19 FY2019-20 Totals
70,000.001 25,000,001 25,000,00 25,000.00 25,000-001 170,000.00
07/07/15
TOTAL PROJECTED REVENUES
1 70,000.00
25,000-001
25,000.00
25,000.00
25,000-001
$170,000,00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/07/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
Golf Club Estates Wtr Swr
Project Location:
Golf Club Estates/Barwick Road
Project Number: 13-088
Project Start Date:
Project End Date:
Projects Description:
Installation of water and sewer mains to serve residents of Golf Club Estates and Barwick Road (north of Sabal Lakes
Road).
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
225,000.00
225,000.00
Construction/ Buildings/ Other Improvements
1,275,000.00
1,275,000.00
Equipment
Inspections Fees/ .Other Fees/ Costs
Public Arts Program/ Contingent
TOTAL PROJECTED COSTS
225,000.00
1,275,000.00
A
$1,500,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
225,000.00
1,275,000.00
1,500,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank FinancinglOther
CRA
`- 07/07/15
TOTAL PROJECTED REVENUES 225,000.00 1,275,000.00
$1,500,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
Personnel
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
0
07/07/15
Department/Divislon
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
IT Cartegraph OMS
Project Location,
ESD
Project Number: 16-639
Project Start Date:
Project End Date:
Projects Description:
Ballpark pricing from Cartegraph for Cloud version for ESD work orders, integrated with ESRI maps Estimate pricing
from Cartegraph
. PROJECTED COSTS
Five Year Ca ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
140,000.00
140,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
140,000.001
$140,000.00
PROJECTED REVENUES
Fire Year Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018.19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
140,000.00
140,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
p �, 08/03/15
TOTAL PROJECTED REVENUES
1 T$140,000.00
.1140,000.001
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Pro ram .
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
$0.00
08/03/15
Department/Division
Environmental Services Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
Lake Ida Drain. Study
Project Location:
North Lake Ida Area
Project Number: 13-072
Project Start Date.
Project End Date:
Projects Description:
Installation and relocations of water utilities associated with the project. (Total project estimate is $720,000; refer to 448
account for drainage portion of the work).
PROJECTED COSTS
Flee Year'Capl#al Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
720,000.00
720,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
720,000.00
$720,000.00
PROJECTED REVENUES
so i
F!Ve Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
275,000.00
275,000.00
448: Stormwater Utility Fund
445,000.00
445,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -5 ecial Funding
Bond/Bank Financing/Other
07/24/15
CRA
TOTAL PROJECTED REVENUES
720,000.00
$720,000.00
Opl~.H.. ATIQNAL IMIACT:ACO.U.NT
Five Year Capital Prram
..........._.
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/24/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Lift Station 1 Upgrade
Project Location:
505 SE 5th Ave.
Project Number: 16-632
Project Start Date:
Project End Date:
Projects Description:
Lift Station #1 has reached its useful life and Is In need of major upgrading; to Include studylanalysis for future growth,
perform design of upgrades, and construction administration.
PROJECTED COSTS
Five Year Ca ital Pra ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
150,000.00
500,000.00
650,000.00
Construction/ Buildings/ Other Improvements
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
150,000.00
500,000.00
$650,000.00
PROJECTED REVENUI=S
Five Year Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
150,000.00
500,000.00
650,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
07/30/15
TOTAL. PROJECTED REVENUES
150,000.00500,000.00
$650,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/30/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Lift Station Rehab FY 16
Project Location:
City Wide
Project Number: 16-631
Project Start Date:
Project End Date:
Projects Description:
Annual program of rehabilitating lift stations; re lace pumps, rails and guides, fittings, valves, and coat wet well.
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
75,000.00
75,000.00
752000.00
75,000.00
75,000.00
375,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
$375,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017.18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
375,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
"' 4 ° 07/07/15
TOTAL PROJECTED REVENUES
75,000.00
75AG.001
75,000.00
-),000.001
$075,000.00
- IMPACT ACOUNT
Five Year Ca ital Program
_OPERATIONAL.
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL. PROJECTED OPERATING COST
$0.00
07/07/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
05/19/2014
Project Title:
LS Wet Well Rehab FY15-19
Project Location:
City wide.
Project Number: 15-018
Project Start Date:
10101/2014
Project End Date:
09/30/2015
Projects Description:
Annual program to rehabilitate wet wells at buildinglift stations based on condition assessment.
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18 FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design) Preliminary Study
Construction/ Buildingsl Other Improvements
70,000.00
70,000.00
70,000.00 70,000.00
70,000.00
350,000.00
Equipment
Inspections Feesl Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
1 70,000.001
70,000.001
70,000M1 70,000.00
70,000.00
$350,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
70,000.00
70,000.00
70,000.00
70,000.00
70,000.00
350,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment Dist rlct-Special Funding
Bond/Bank Financing/Other
r, Fr 07/07/15
CRA
TOTAL PROJECTED REVENUES
70,00o
)01
70,000-001
70,000.aa
$350,000.ao
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/07/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Date Submitted
Project Title:
NW 1 st Ave NW 2nd Ave WM
Project Location:
NW 1 st Ave.
Project Number: 16-633
Project Start Date:
Pro'ect End Date:
Projects Description:
Upgrade of existing 2" water mains to 8" on NW 1st Ave; between NW 1st Ave to NW 2nd Ave; per the WM upgrade
master plan. (Engineering and construction in-house staff).
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-201
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
150,000.00
150,000.00
Equipment
Inspections Feesl Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
150,000.00
$150,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
150,000.00
150,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
c: 07/07/15
TOTAL PROJECTED REVENUES
1150,000.001$150,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/07/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
NW 17th Street WM Upgrade
Project Location.
NW 17th Street
Project Number: 16-634
Project Start Date:
Project lend Date:
Projects Description:
Upgrade of existing 2" water mains to 8" on NW 17th Street; between Swinton Ave. to NW 2nd Ave; per the WM upgrade
Master Pian. (Engineering and construction by in-house staff),
PROJECTED COSTS
Five Year. Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
105,000.00
105,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
105,000.00
$105,000.00
PROJECTED REVENUES :.
Five,:Year. Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY201 B-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
105,000.00
105,000.00
Federal Grants
State Grants
County Grants
S ecial Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
07/14/15
TOTAL PROJECTED REVENUES --[105,000,001
1
1
$105,000.00
OPERATIONAL IMPACT'ACOUNT
Five Year Ca ital Pro rarr
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/14/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
NW 4th Ave WM Upgrade
Project Location:
NW 4th Ave, between NW 22 Street and
cul-de-sac.
Project Number:
15-050
Project Start Date.
Project End Date:
Projects Description:
Construction of water main upgrade along NW 4th Ave; between NW 22 St and end of cul-de-sac, approx. 500 LF of
WM. (Engineering and construction by in-house staff).
PROJECTED COSTS
Five
Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
75,000.00
75,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
75,000.00
$75,000.00
PROJECTED REVENUES
Five
Year Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
75,000.00
75,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
0 3 07/07/15
CRA
TOTAL PROJECTED REVENUES
1 75,000-001
1 1
1 1
$75,000.00
OPERATIONAL IMPACT ACOUNT
Five
Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/07/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
NW 9th Ave WM Upgrade
Project Location:
NW 9th Ave. between NW 3rd Street and
NW 2nd Street.
Project Number: 15-053
Project Start Date:
Project End Date:
Projects Description:
Construction of water main upgrade along NW 4th Ave; between NW 3rd St and NW 2nd St approx. 700 LF of WM.
(Engineering and construction by in-house staff).
PROJECTED CO T5.
Five Year Ca
1tal Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
105,000.00
105,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
105,000.00
$105,000.00
PROJECTED REVENUES
Five Year Ca italProgram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
105,000.00
105,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
3 ; 07/14/15
TOTAL PROJECTED REVENUES
1105,000.001$105,000.00
OPERATIONAL IMPACT ACOUNT
Five Year.Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/14/15
DepartmenVDivision
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Date Submitted
Project Title:
Prod Well Rehab FY16
Project Location:
City Wide
Project Number: 16-635
Project Start Date:
Project End Date:
Projects Description:
Annual program for rehabilitation/re-development of raw water production wells to maximize the withdrawal capacity of
the well. Anticipate rehab. of 8 wells
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
150,000.00
150,000.00
150,000.00
100,000.00
100,000.00
650,000.00
Equipment
Inspections Fees/ Other l=ees/ Costs
Public Arts Program/ Contingent
TOTAL PROJECTED COSTS,1150,o"00.001150,000.00[150,000.001100,000.001100,000.00,
$650,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
150,000.00
150,000.00
150,000.00
100,000.00
100,000.00
650,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
= 07/07/15
TOTAL PROJECTED REVENUES
150,000.00
150,000.00 150,000.00 100,000.00 100,000.00
$650,000.00
OPERATIONAL IMPACT ACOUNT
l=ive Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/07/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Date Submitted
Project Title:
Prospect St WM Upgrade
Project Location:
Prospect Street
Project Number: 16-636
Project Start Date:
Project End Date:
Projects Description:
Upgrade of existing 2" water mains to 8" on Prospect Street, between Washington Ave to Roosevelt Ave; per WM
upgrade master plan. (Engineering and construction by in-house staff).
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
120,000.00
120,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
120,000.00
$120,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-201
Totals
442: Water/Sewer Renewal and Replacement Fund
120,000.00
120,00000
Federal Grants
Slate Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
07/07/15
TOTAL PROJECTED REVENUES
1120,000.001
1
1
1
1 $120,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/07/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
05/19/2014
Project Title:
PU Generator Rplcmnt FY15
Project Location:
City wide.
Project Number; 15-042
Project Start Date:
10/01/2014
Project End Date:
09/30/2015
Projects Description:
Annual replacement of aging fixed and mobile generators at key utility facilities; units are over 20 years old, parts
unavailable, and service costly. Annual program to replace aging stand-by generators at Key facilities; lift station, raw
water, tank sites or pumping stations.
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
375,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
75,000.00
75,000.001
75,000.00
75,000.001
75,000.00
$375,000.00
PROJECTED REVENUES
Five Year Capltal Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
375,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
3 / / 07/07/15
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
75,000.00
75,000.00
75,000,00
75,000.00
75,000.00
$375,000.00
OPERATIONAL IMPACT ACOUNT
Fire Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/07/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
05/19/2014
Project Title:
San Swr M.H. Rehab FY15
Project Location:
City wide.
Project Number: 15.020
Project Start Date:
10/01/2014
Project End Date:
09/29/2015
Projects Description:
Annual program to rehabilitate deteriorating sanitary sewer manholes identified through inspections via Interior
coating.
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19 FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
50,Q00.00
50,000.00
50,000.00
50,000.00 50,000.00
250,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
50,000.00
50,000.00
50,000-001
50,00M01 50,000.00
$250,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
250,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
07/07/15
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
$250,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/07/15
Department/Division
Water -Sewer Network
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
06/23/2014
Project Title:
San Swr Main Rehab FY15
Project Location:
City wide.
Project Number: 15-021
Project Start Date:
Project End Date:
Projects Description:
Annul program to rehabilitate sanitary sewer mains and laterals via cured in place pipe lining.
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
100,000.00
100,000.00
100,000.00
100,000.00
100,000,00
500,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
100,000.00
100,000.00
100,000.001100,000.001100,000.001
$500,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
500,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
07/07/15
TOTAL PROJECTED REVENUES
100,000.00
100,000.00
1 x0,000.00
100,000.00 100,000.x0
$50x,000.00
OPERATIONAL IMPACT ACOUNT
Fire Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
F'Y2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/07/15
Department/Division
Water-Sewer Network
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
SW 11th Ave WM Upgrade
Project Location:
SW 11th Ave.
Project Number: 16-637
Project Start Date:
Project End Date:
Projects Description:
Upgrade of existing 2" water mains to 8" on SW 11th Ave, between SW 8th Street to SW 10th Street; per the WM upgrade
master plan (Engineering and construction by in-house staff).
PROJECTED COSTS
l=ive'Year Ca italPro ran
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
120,000.00
120,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
120,000.00
$120,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
120,000.00
120,000.00
448: Stormwater Utility Fund
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
F 07/29/15
CRA
TOTAL PROJECTED REVENUES
120,000.00
$120,000.00
OPERATIONAL, IMPACT ACO,UNT
Five Year Capital P.rogiram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL. PROJECTED OPERATING COST
$0.00
07/29/15
Department/Dlvision
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Date Submitted
Project Title:
SCRWWTP City Cont. R&R
Project Location:
1801 North Congress Avenue
Project Number: 16-540
Project Start Date:
Project End Date:
Projects Description:
City of Delray Beach share of anticipated costs associated with Repair & Rehabilitation projects at the Wastewater
Treatment Plant.
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
84,000.00
84,000.00
84,000.00
84,000.00
84,000.00
420,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
84,000.00
84,000.00
84,000.00
84,000.00
84,000.00
$420,000.00
PROJECTE=D REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
PY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
84,000.00
84,000.00
84,000.00
84,000.00
84,000.00
420,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
'gip I o� 07/07/15
TOTAL PROJECTED REVENUES
84,000.00
84,000.00 84,000.00 i
[1000.001
$420,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
F'Y2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/07/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
Sunshine Dr WM Upgrade
Project Location:
Project Number: 15-052
Project Start Date:
Project End Date:
Projects Description:
PROJECTED COSTS.
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
225,000.00
225,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingent
TOTAL PROJECTED COSTS
225,000.00
$225,000.00
PROJECTED REVENUES
Five Year Ca
itaL /Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
225,000.00
225,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
07/29/15
TOTAL PROJECTED REVENUES
1225,000.001
1
1
$225,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca Ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/29/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
05/15/2013
Project Title:
System 58A Frce Mn Rplcmt
Project Location:
Spanish Wells across Linton Blvd. to LS 58.
Project Number: 14-039
Project Start Date:
10/01/2013
Project End Date:
09/30/2016
Projects Description:
Replace approx. 1,600 LF of deteriorating force main from IMS 58A (Spanish Wells) across Linton Blvd to LS 58
(Shadywoods I).
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
175,000.00
175,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
175,000.00
$175,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
175,000.00
175,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
2 3 07/07/15
Band/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
175,000.00
$175,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/07/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
07/10/2014
Project Title:
Tropic Palms WM Ph 2
Project Location:
Tropic Palms
Project Number: 15-022
Project Start Date:
Project End Date.
12/30/2016
Projects Description:
Upgrade 2" water mains on Ibis Dr. Approximately 2,000 LF of water main.
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design) Preliminary Study
Construction/ Buildings/ Other Improvements
773,000.00
773,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contin enc
TOTAL PROJECTED COSTS
773,000.00
$773,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
773,000.00
773,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
07/06/15
TOTAL PROJECTED REVENUES
1773,ODO,001
I I
1
1 $773,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
07/06/15
Department/Division
Engineering
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Tropic Palms WM Ph 3
Project Location:
Tropic Palms
Project Number: 16-608
Project Start Date:
Project End Date:
Projects Description:
Upgrade 2" water mains on Heron Dr. Approximatel, 3,000 LF of water main.
PROJECTED COSTS
Five Year,Ca pital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
99,000.00
99,000.00
Construction/ Buildings/ Other Improvements
660,000.00
660,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency_
TOTAL PROJECTED COSTS
99,000.00
660,000.00
$759,000.00
PROJECTED REVENUES
Five Year C pital. Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
99,000.00
660, 000.00
759,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
07/30/15
TOTAL. PROJECTED REVENUES
10.001660,000.001
1 $759,000.00
OPERATIONAL IMPACT ACOUNT
Rive Year. Ca ital Pra ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/30/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Date Submitted
Project Title:
W Mtr RR Lrg Meters FY16
Project Location:
City Wide
Project Number:
16-638
Project Start Date:
Project End Date:
Projects Description:
Annual program to replace large water meters due to age and or faulty operation.
PROJECTED COSTS
Five Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
15,000.00
15,000.00
15,000,00
15,000.00
15,000.00
75,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
$75,000.00
PROJECTED REVENUES
Five
Year Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2019-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
75,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
07/07/15
TOTAL PROJECTED REVENUES
1 15,000.001
15,000.001
15,000.00
1
;,000.001
$75,000.00
OPERATIONAL IMPACT ACOUNT
Five
Year Ca
ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-201
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/07/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
06/10/2014
Project Title:
Water Dist Syst Eval FY15
Project Location:
City wide.
Project Number: 15-023
Project Start Date:
10/01/2014
Project End Date:
09/30/2016
Projects Description:
Evaluation of the potable water distibution and transmission system for maintenance of water quality. Secure services
of a consultant to perform an analysis of the WTP In regards to live cycle and projected service population, with
recommendations for treatment options and probable costs for each. (plant Is 50 plus years in age)..
PROJECTED COSTS
PROJECTED _ .
_
Five Year Ca ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect-Design/ Preliminary Study
150,000.00
50,000.00
150,000.00
150,000.00
150,000.00
650,000.00
Construction/ Buildings/ Other Improvements
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
150,000.001
50,000.00
150,000.00
150,000.00
150,000.00
$650,000.00
PROJECTED REVENUES
Five Year Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
150,000.00
50,000.00
150,000-00
150,000.00
150,000.00
650,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
07/30/15
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
1150,000.001
50,000-00,150,000.00
150,000.00
150,000.00
$650,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
07/30/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
05/19/2014
Project Title:
Water Mtr RIR Srvcs FY15
Project Location:
City wide.
Project Number: 15-025
Project Start Date:
10/01/2014
Project End Date:
09/30/2015
Projects Description:
Contracted vendor services associated with replacement of malfunctioning water meters. Annual program to replace
small water meters due to age and or faulty operation.
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction! Buildings/ Other Improvements
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
250,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Programl Contingency
TOTAL PROJECTED COSTS
50,000-001
50,000.00
50,000.00
50,000.00
50,000,00
$250,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
250,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
xra 07/07/15
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
$250,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
07/07/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
05/1912014
Project Title:
Water Service Reloc FY 15
Project Location:
City wide.
Project Number: 15-026
Project Start Date:
10/01/2014
Project End Date:
09/30/2015
Projects Description:
Annual program to relocate rear yard water meters and services to front yard.
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
EngineeringlArchitect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
25,000.00
25,000.00
25,000.00
25,000.00
25,000.00
125,000:00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
25,000.00
25,000.001
25,000.001
25,000.00
25,000-001
$125,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
F'Y2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
25,000.00
25,000.00
25,000.00
25,000.00
25,000.00
125,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
f.rF 07/07/15
CRA
TOTAL PROJECTED REVENUES
25,000.00
25,000.001
25,000.00
25,000.001
25,000.001
$125,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capita! Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/07/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
05/19/2014
Project Title:
Water Valves RIR FY 15
Project Location:
City wide.
Project Number: 15-027
Project Start Date:
10/01/2014
Project End Date:
09/30/2015
Projects Description:
Replace inoperable or broken 6" and 8" water valves In the distribution system. Annual program to repair and or replace
faulty or In -operable water valves within the City water distribution system.
PROJECTED COSTS
Flue Year Capita[ Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
36,000.00
36,000.00
36,000.00
36,000.00
144,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
36,000.00
36,000,001
36,000.00136,000.001
$144,000.00
PROJECTED REVENUES
:, Five Year: Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
36,000.00
36,000.00
36,000.00
36,000.00
144,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
07/30/15
Bond/Bank Financia /Other
CRA
TOTAL PROJECTED REVENUES
36,000.00
36,000.00
36,000.00
36,000.00
$144,000.00
OPERATIONAL IMPACT ACOUNT
Five. Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/30/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
05/19/2014
Project Title:
WTP Ammonia Tank Rpcmt
Project Location:
Water Treatment Plant site.
Project Number:
15-028
Project Start Date:
10/0112014
,Project End Date:
�09/30/2015
Projects Description:
Replace aging ammonia tank at WTP.
PROJECTED COSTS
Five Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-201
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
30,000,00
30,000-00
Equipment_
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
30,000,00!
$30,000.00
PROJECTED REVENUES
:TIve:Year Capltal
Progr am
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: WaterlSewer Renewal and Replacement Fund
30,000.00
30,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
07/14/15
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
30,000.00
$30,000.00
OPERATIONAL IMPACT ACOUNT
Five
Year Capital
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/14/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
06/09/2014
Project Title;
WTP Bleach Tank FY15
Project Location:
Water Treatment Plant
Project Number:
15-029
Project Start Date:
10/01/2014
Project End Date:
09/30/2015
Projects Description:
Purchase and install a secondary 8,600 gallon Sodium Hypochlorite tank at the Water Treatment Plant.
PROJECTED] COSTS
Five
Year Ca
31tal Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
50,000.00
50,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
50,000.00
$50,000.00
PROJECTED REVENUES :..
Fi.ue.
Year: Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
50,000.00
50,000.00
Federal Grants
State Grants
County -Grants
Special Revenue Funds
Assessment District -Special Funding
= A-1 07114115
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
50,000.00
$50,000.00
OPERATIONAL IMPACT ACOUNT
..Five Year Capital
Program.
Classlflcation
FY2015-16
FY2016-17
FY2017-18
FY2016-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$OAO
07/14/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
06/30/2014
Project Title:
WTP Clarifier Rehab FY1 5
Project Location:
Water Treatment Plant site.
Project Number: 15-030
Project Start Date:
10/01/2014
Project End Date:
109/30/2015
Projects Description:
Rehabilitation of Water Treatment Plant Clarifiers (two of four); to include sandblasting and painting of internal
structural parts, and necessary equipment upgrades.
PROJECTED COS.:
ST
Five Year P pital Prog ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2016-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
175,000.00
175,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
175,000.00
$175,000.00
PROJECTED REVENUM
Five Yea'r:Capltal"P r9grr
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
175,000.00
175,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding_
07/14/15
Bond/Bank Financing/Other
CRA
TOTAL PROJECTED REVENUES
175,000.00
$175,000.00
OPERATIONAL IMPACT ACOUNT
- Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/14/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
06/06/2014
Project Title:
WTP Filter Drn Valve FY15
Project Location:
Water Treatment Plant
Project Number: 15-031
Project Start Date:
10/01/2014
Project End Date:
09/30/2015
Projects Description:
Replace filter drain and fill valves at WTP, one set per year (1 of 7). Annual program to repair and or replace faulty or
In -operable water valves within the WTP.
PROJECTED COSTS
Five Year Capital Pro ram'
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Stud
Construction/ Buildings/ Other Improvements
65,000.00
50,000.00
50,000.00
50,000.00
50,000.00
265,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
65,000.001
50,000.001
60,000.00
50,000.00J
50,000.001
$265,000.00
PROJECTED REVENUES
dive Year'C Oita l Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
65,000.00
50,000.00
50,000.00
50,000,00
50,000.00
265,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
a /I/ 5 07/30/15
BondlBank Financing/Other
CRA
TOTAL PROJECTED REVENUES
65,000.00
50,000.00
50,000.00
50,000.00
50,000.00
$265,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/30/15
Department/Division
Utilities
City of Delray Beach
CIP Project Detail Sheet .
FY2015-16 to FY2019-20
Existing project
Date Submitted
06/30/2014
Project Title:
WT Lime Slaker Rplcmnt
Project Location:
Water Treatment Plant site.
Project Number: 15-032
Project Start Date:
10/01/2014
Project End Date;
09/30/2015
Projects Description:
Replace and upgrade the aging Lime Slaker unit at the Water Treament Plant. Replacement of 22 year old lime slaker
unit at the WTP, Phase 2, east unit.
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
200,000.00
200,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingent
TOTAL PROJECTED COSTS
200,000.00
$200,000.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
442: Water/Sewer Renewal and Replacement Fund
200,000.00
200,00000
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
`� " W 07/07/15
BondlBank Financing/Other
CRA
TOTAL PROJECTED REVENUES
200,000.00
$200,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19 FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/07/15
Department/Division
Engineering
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
Project Title:
Alley Drainage Improv.
Project Location:
North South Alley In 100 Block between
Pineapple Grove Way and NE 3rd Av
Project Number:
11-113
Project Start Date:
Project End Date:
Projects Description:
Reconstruct alley with previous pavers to help allevlate drainage issue with properties lower than alley.
PROJECTED COSTS
Five
Year.Co
ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
74,640.00
74,640.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
74,640.001
$74,640.00
PROJECTED REVENUES
Five
Year Ca
oltal Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19 FY2019-20
Totals
334: General Capital Improvements
448: Stormwater Utility Fund
74,640.00
74,640.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
a 08/14/15
CRA
TOTAL PROJECTED REVENUES
74,640.00
$74,640.00
OPERATIONAL IMPACT ACOUNT
Five
Year Ca
Atal Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19 FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/14/15
Department/Division
Engineering
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Existing project
Date Submitted
06/23/2014
Project Title:
Basin Pump Sta Upgrade
Project Location:
Project Number: 15-033
Project Start Date:
Project End Date:
Projects Description:
Upgrade existing pump station.
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018.19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
22,500.00
22,500.00
Construction/ Buildings/ Other Improvements
77,500.00
75,000.00
152,500.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
100,000,00
75,000-001
$175,000.00
PROJECTED REVENUES
Five Year Ca ital Program.
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
448: Stormwater Utility Fund
100,000.00
75,000.00
175,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
,� 08/14/15
TOTAL PROJECTED REVENUES
100,000.00
75,000.001___$175,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Pra ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/14/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
City Swales
Project Location:
City Wide
Project Number: 16-519
Project Start Date:
Project End Date:
Projects Description:
Construction of swales along roadways to improve drainage which Is part of the NPDES requirements.
PROJECTED COSTS::.Five
Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
85,000.00
100,000.00
100,000.00
100,000.00
385,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
85,000.00
100,000.00
100,000.00
100,000.00
$385,000.00
PROJECTED REVENUES
Five Year Ca Itaf Program.
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
448: Stormwater Utlllt Fund
85,000.00
100,000.00
100,000.00
100,000.00
385,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
3 08/14/15
TOTAL PROJECTED REVENUES
1 85,000.001100,000,001100,000-001100,000-001
$385,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Cs ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
$0.00
08/14/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Delhaven Drainage Imp.
Project Location:
Delhaven and AIA
Project Number: 16-510
Project Start Date:
Project End Date:
Projects Description:
Install drainage improvements and repave Delhaven Road.
PROJECTED COSTS
Five Year Ca pita.1 Program.
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
45,000.00
45,000.00
Construction/ Buildings/ Other Improvements
105,000,00
105,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
1150,000.00
$150,000.00
PROJECTED REVENUES
Five Year Ca pital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19IFY2019-20
Totals
448: Stormwater Utility Fund
150,000.00
150,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
08/1 4/15
TOTAL PROJECTED REVENUES
1 1
1150,000.001$150,000.00
OPERATIONAL IMPACT ACOUNT.
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/14/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
ICWW Flap Gates
Project Location:
ICWW
Project Number:
16-515
Project Start Date:
Project End Date:
Projects Description:
Installation of 5 -flap gates on the outfalls in the ICWW
PROJECTED COSTS
Five
Year Ca
Ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
20,000.00
20,000.00
40,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
20,000.00
20,000.00
$40,000.00
PROJECTED .REVENUES
Five
Year Capital
Program.
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
448: Stormwater Utility -Fund
20,000.00
20,000.00
40,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
�r� 08/14/15
TOTAL PROJECTED REVENUES
120,000-001 20,000.001
1 $40,000.00
OPERATIONAL IMPACT ACOUNT
Five
Year. Ca
ital. Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/14/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Lakeview Drainage Imp.
Project Location:
Lakeview Subdivision
Project Number: 16-513
Project Start Date:
Project End Date:
Projects Description:
Repair and maintenance of Lakeview Drainage System.
PROJECTED:COSTS
Five Year. Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18 FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
25,000.00
25,000.00
Construction/ Buildings/ Other Improvements
100,000.00
100,000.00
Equipment
Inspections l=ees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
25,000.001100,00M01
$125,00400
PROJECTED REVENUES
Five Year Ca Ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
448: Stormwater Utility Fund
25,000.00
25,000.00
Federal Grants
100,000.00
100,000.00
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
9 08/14/15
TOTAL PROJECTED REVENUES
I 25,000.00 100,000.00
$125,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-201
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/14/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
LWDD L33 Culvert Report
Project Location:
Atlantic Ave near Congress Ave.
Project Number: 15-063
Project Start Date:
Pro ect End Date:
Projects Description:
Clean, Inspect, televise, and repair If necessary the L-33 Culvert as required by LWDD Permit
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19IFY2019-20
Totals
Land Acquisition
I
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
100,000.00
100,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
100,000.001
1
1
1
$100,000.00
PROJECTED REVENUES
Five Year C.
pital Prdg ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
448: Stormwater Utility Fund
100,000.00
100,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
08/14/15
TOTAL PROJECTED REVENUES
1100,000.001
L 1
$100,000.00
OPERATIONAL IMPACT ACOUNt
Five Year Ca
ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/14/15
Department/Division
Engineering
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Misc, Storm Improvements
Project Location:
City Limits
Project Number:
16-525
JProject Start Date:
JProject End Date:
Projects Description:
Miscellaneous improvements to drainage system.
PROJECTED COSTS ...
... Five
Year Capital
Pro gram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
.15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
75,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
15,000-00
15,000.00
15,000.00
15,000.00
15,000,00
$75,000.00
PROJECTED REVENUES
Five
Year Capital
Pro gram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
448: Stormwater Utility Fund
15,000.00
15,000.00
15,000.00
15,000.00
15,000,00
75,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
08/14/15
TOTAL. PROJECTED REVENUES 15,000.00
15,00(
001 15,000.001 15,000.001
$75,000.00
OPERATIONAL IMPACT ACOUNT
Five
Year Ca
Atal Pro ram
g _.
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outla
TOTAL PROJECTED OPERATING COST
1 $0.00
08/14/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PalmTrall South Drainage
Project Location:
Project Number:
16-505
Project Start Date:
Project End Date:
Projects Description:
Installation of storm sewer Infrastructure on Palm Trail South.
PROJECTED COSTS
Fire
Year Capital.
Program .
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
75,000.00
75,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
75,000.00
$75,000.00
PROJECTED; REVENUES
Five
Year Ca
ltal. Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
448: Stormwater Utility Fund
75,000.00
75,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
07/29/15
TOTAL PROJECTED REVENUES
75,000.00 $75,000.00
OPERATIONAL IMPACT ACOUNT
Fire
Year Capital.
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/29/15
Department/Division
Engineering
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Pump Sta Rehab FY 15-19
Project Location:
various locations
Project Number: 16-624
Project Start Date:
Project End Date:
Projects Description:
Major rehabilitation of storm pump stations.
PROJECTED COSTS
Five Year Ca ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
125,000.00
140,000.00
140,000.00
175,000.00
170,000,00
750,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
125,000.001140,000.001140,000.001175,000.00'170,000.001
$750,000.00
PROJECTED REVENUES
Five Year Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
448: Stormwater Utility Fund
125,000.00
140,000.00
140,000.00
175,000.00
170,000.00
750,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
08/14/15
TOTAL PROJECTED REVENUES
1125,000.001140,000-001140,000.001175,000.001170,000.001
$750,000.00
OPERATIONAL IMPACT ACOUN7
l=ive Year Ca Ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$O.QO
08/14/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Seawall Repairs
Project Location:
434 Andrews Ave. and NE 2nd Street.
Project Number: 16-503
Project Start Date:
Project End Date:
Projects Description:
Need to repair approximately 100' concrete seawalls at 2 locations. Both locations are public maintained seawalls.
PROJECTED COSTS
Fire Year Ca
Ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design) Preliminary Study
40,000.00
40,000.00
Construction/ Buildings/ Other Improvements
100,000.00
100,000.00
Equipment
-
Inspectlons Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
40,000.00
100,000.00
$140,000,00
PROJECTI D REVENUES
Five Year Ca ital Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019.20
Totals
448: Stormwater Utility Fund
40,000.00
100,000.00
140,040.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
08/14/15
TOTAL PROJECTED REVENUE
140,000.001100,000,001
1
1
1
$140,000.00
OPERATIONAL IMPACT ACOUNT
Five.Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0,00
08/14/15
Department/Division
Engineering
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Thomas Pump Sta Upgrade
Project Location:
Project Number: 16-605
Project Start Date:
Project End Date:
Projects Description:
Upgrade existing pump station
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015.16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
22,500.00
22,500.00
Construction/ Buildings/ Other Improvements
77,500.00
65,000.00
142,500,00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
1100,000M
65,000,00
$165,000.00
PROJECTED REVENUES
Five Year Ca ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-201
Totals
448: Stormwater Utility Fund
100,000.00
65,000.00
165,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
7 � 08/14/15
TOTAL PROJECTED REVENUES
1100,000.001
65,000.00
$1651000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital.Progrom
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/14/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
LIDR Mapping Updates
Project Location:
City Limits
Project Number: 16-625
Project Start Date:
Project End Date:
Projects Description:
Update the LIDR Map within the City Limits and Perform a Flood Analysis to compare with updated FEMA Maps. This
project may joined with neighboring municipalities. (UNFUNDED)
PROJECTED COSTS
Flve. Year. Ca ital_ Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Ac uisition
Engineering/Architect Design/ Preliminary Study
100,000.00
100,000.00
200,000.00
Construction/ Buildings/ Other Improvements
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
1100,000.00
100,000.00
$200,000.00
PROJECTED .REVENUES
Five YearCapital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
448. Stormwater Utility Fund
100,000.00
100,000.00
200,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment Dist rict-S ecial Funding
Bond/Bank Financing/Other
CRA
.� 07/29/15
TOTAL PROJECTED REVENUES
100,000.00 100,000.00
$200,000.00
OPERATIONAL IMPACT ACOUNi
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/29/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
NE 6th Ave. Alley Imp.
Project Location:
210 NE 6th Ave.
Project Number: 16-529
Project Start Date:
Project End Date:
Projects Description:
Redesign the alleyway between 5th and 6th Ave. between NE 2nd Street and NE 3rd Street to prevent flooding by 210
NE 6th Ave. (UNFUNDED)
.:PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
45,000.00
45,000.00
Construction/ Buildings/ Other Improvements
300,000.00
300,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
45,000,00
300,000.00
$345,000,00
PROJECTED REVENUES
Flve.Year. Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
448: Stormwater Utility Fund
45,000.00
300,000.00
345,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
"'��' 07/29/15
TOTAL PROJECTED REVENUES
1 45,000.001300,000.001
1
$345,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/29/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Rainberry Woods Drainage
Project Location:
Rainberry Woods
Project Number: 16-506
Project Start Date:
Project End Date:
Projects Description:
Install drainage improvements in the development. (UNFUNDED)
PROJECTED COSTS
Five Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
45,000.00
45,000.00
Construction/ Buiidingsl Other Improvements
255,000.00
255,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
45,000.00
255,000.00
$300,000.00 11
PROJECTI=D REV8NUES
Five Year Ca ital.Pro 'ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
448: Stormwater Utility Fund
45,000.00
45,000.00
Federal Grants
255,000.00
255,000.00
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
07/29/15
TOTAL PROJECTED REVENUES
5,000.00
1 45,000.001255,000.001--
255,000.00
$300,000.00
OPERATIONAL IMPACT ACOUNT
.. .. .... Five Year. Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
1 $0.00
07/29/15
Department/Divislon
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Storm Sewer Cleaning
Project Location:
City Wide
Project Number: 16-517
Project Start Date:
Project End Date:
Projects Description:
Cleaning and televising our storm sewers Infrastructure per NPDES requirements. (UNFUNDED)
PROJECTED COSTS...
Flve Year Ca
ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
250,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
50,000.001
50,000.00
50,000.001
50,000,001
50,000.001
$250,000.00
PROJECTED REVENUES
Five Year Capital, Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
448: Stormwater Utility Fund
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
250,000.00
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
3 7 � 07/29/15
TOTAL PROJECTED REVENUES
1 50,000.00
50,000-001
50,000.001
50,000.00
50,000.00
$250,000.00
OPERATIONAL IMPACT ACOUNT
...... Five Year Capital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
07/29/15
Department/Division
Public Works
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
05/11/2015
Project Title:
Street Light Bucket Truck
Project Location:
Clean and Safe.
Project Number: 16-501
Project Start Date:
10/01/2016
Project End Date:
06/01/2016
Projects Description:
Purchase of a 40' articulating bucket truck for street light maintenance and lights that are owned by the City.
Budgeted by Fleet (in their budget)
PROJECTED COSTS
Five Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
125,000.00
125,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
125,000.001
$125,000.00
PROJECTED REVENUES
Five Year Ca Ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-16
FY2018-19
FY2019-20
Totals
501: Central Garage Fund
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
�' 08/11/15
Bond/Bank Financing/Other
125,000.00
125,000.00
CRA
TOTAL PROJECTED REVENUES
125,000.00
$125,000.00
OPMATIONAI_ IMPACT ACOUNT
Five Wear Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
125,000.00
125,000.00
TOTAL PROJECTED OPERATING COST
125,000.001
1
1
1
1 $125,000.00
08/11/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
Date Submitted
Project Title:
Refuse Compactor Truck
Project Location:
City Parks and Downtown Area
Project Number:
16-502
Project Start Date:
Project End Date:
Projects Description:
Purchase of a new 6 Yard refuse compactor truck. Replacement of truck 794, a 2000 trash compaction truck
operated by parks maintenance for collection of trash from City Parks and Downtown.
PROJECTED COSTS
Five
Year Capital
Program.
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
95,000.00
95,000-00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
95,000.00
$96,000,00
PROJECTED REVENUES ;
Five
Year Ca
Hal Pro ram _.
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
501: Central Garage Fund
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
95,000.00
95,000.00
08/11/15
3
CRA
TOTAL PROJECTED REVENUES 95,000.00
$95,000.00
OPERATIONAL IMPACT ACOUNT
Five
Year Ca
.ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/11/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
15 Seat Passenger Van
Project Location:
Teen Center and Catherine Strong Park
Project Number:
16-548
Project Start Date:
Project End Date:
Projects Description:
Since 2012, Fall, Winter, and Summer camps have been implemented at the Teen Center and Catherine Strong Park,
Example - Chev Express 3500 FLA Sheriff's Assoc. & FLA Assoc. of Counties Bid - southern estimate: $26,492.
PROJECTED COSTS
Five Year Cap
ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
30,000.00
30,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
30,000.001
1
1
$30,000.00
PROJECTED REVENUES
Five Year „Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
501: Central Garage Fund
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
30,000.001
30,000.00
a fl:), -
08/11/15
CRA
TOTAL PROJECTED REVENUES
30,000.00
$30,000.00
OPERATLONAL. IMPACT ACOUNT
Five. Year Ca
ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/11/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
PD Mobile Comm. Vehicle
Project Location:
Police Dept.
Project Number. 16-559
Project Start Date:
Project End Date:
Projects Description:
Mobile Command Center to be utilized during an incident. Last MCC was purchased in 1996 and retired/sold in 2010.
Uses would Include: natural disasters, civil unrest, tactical operations, and/or Special Events. The MCC would be
used as the Emergency Operations Center (EOC). It can also be used as a mobile substation and to support local
crime fighting efforts, (UNFUNDED)
PROJECTED COSTS
Five Year Capital.
Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
650,000.00
650,000.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
1650,000.00
$650,000.00
PROJECTED REVENUES '.
Five Year Ca Ital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
501: Central Garage Fund
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
:: 0.7 08/24/15
BondBank Financing/Other
650,000.00
650,000.00
CRA
TOTAL PROJECTED REVENUES
650,000.00
$650,000.00
OPERATIONAL IMPACT ACOUNT
Five Year Capital.Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
08/24/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Police Vessel
Project Location:
Police Dept.
Project Number: 16-565
Project Start Date:
Project End Date:
Projects Description:
Police vessel; 28' Contender Tournament with Twin Yamaha 250 XCA (4 -Stroke) engine and accessories. Impact to
operating would include annual maintenance, fuel, dockage and misc. expenses. (UNFUNDED)
PROJECTED COSTS
Five Year Ca ital Pro ram
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
Equipment
129,500.00
129,500.00
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
129,500.001
$129,500.00
PROJECTED REVENUES
Five Year Capital Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
501: Central Garage Fund
Federal Grants
State Grants
20,000.00
20,000.00
County Grants
S ecial Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
109,500.00
109,500.00
CRA
. 0 c:� 08/24/15
TOTAL PROJECTED REVENUES
1129,500,001
1
1 $129,500.00
OPERATIONAL IMPACT ACOUNT
- Five. Year Capital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
66,500.00
66,500.00
Capital Outlay
TOTAL PROJECTED OPERATING COST
66,500.00
$66,500.00
08/24/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
Tactical Obs. Platform
Project Location:
Police Dept.
Project Number:
16-568
Project Start Date:
Project End Date:
Projects Description:
Tactical observation platform can be used to help reduce crime, collect evidence and control crowds. It Is portable,
and can be deployed in various areas especiallyduring Special Events. (UNFUNDED)
PROJECTED COSTS
Five
Year Capital.
Program.
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
73,000.00
73,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
TOTAL PROJECTED COSTS
73,000.00
$73,000.00
PROJECTED REVENUES
Five
Year Capital
Program
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
501: Central Garage Fund
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
73,000.00
73,000.00
08/24/15
CRA
TOTAL PROJECTED REVENUES
73,000.00
$73,000.00
OPMATIONAL IMPACT ACOUNT
Five Year Capital
Progrem
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-201
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/24/15
Department/Division
City of Delray Beach
CIP Project Detail Sheet
FY2015-16 to FY2019-20
New project
Date Submitted
Project Title:
SW 2nd Street Paving
Project Location:
1-95 to 2nd Ave.
Project Number: 16-676
Project Start Date:
Project End Date:
Projects Description:
Repaving SW 2nd Street
PROJECTED COSTS
Five Year Ca Ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY201 B-19
FY2019-201
Totals
Land Acquisition
Engineering/Architect Design/ Preliminary Study
Construction/ Buildings/ Other Improvements
197,000.00
197,000.00
Equipment
Inspections Fees/ Other Fees/ Costs
Public Arts Program/ Contingency
3,000-00
3,000.00
TOTAL PROJECTED COSTS
200,000.00
$200,000.00
PROJECTED REVENUE
..Five Year Ca ital Pro ram
Revenue Source(s)
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
334: General Capital Improvements
Federal Grants
State Grants
County Grants
Special Revenue Funds
Assessment District -Special Funding
Bond/Bank Financing/Other
CRA
200,000.00
200,000.00
08/31/15
TOTAL PROJECTED REVENUES
1200,000,001
1 1
1
$200,000.00
OPERATIONAL IMPACT ACOUNT
:Five .Year Ca ital Program
Classification
FY2015-16
FY2016-17
FY2017-18
FY2018-19
FY2019-20
Totals
Personnel
Other Operating
Capital Outlay
TOTAL PROJECTED OPERATING COST
$0.00
08/31/15
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 001 GENERAL FUND
FY 2016-2020
SOURCES OF FUNDS:
9/4/2015
FINAL
9/4/2015
ACCOUNT NAME
BALANCE SHEET
MULTI
FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20
UNDESIGNATED FUND BALANCE
23,700,752 35,719,608 35,719,608 35,719,608 35,719,608 35,719,608
CURRENT YEAR BALANCE
12,018,856
TOTALREVENUE
35,719,608 35,719,608 35,719,608 35,719,608 35,719,608 35,719,608
USES OF FUNDS:
Unassigned Fund Balance of $23,700,352 as of September 30, 2014 represented
24.6% of actual Operating Expenditures, $96,249,387. The Unassigned General Fund Balance
is needed to supplement cash flow in the first quarter of the new year (period prior to receipt
of property tax revenues) and to fund emergency or unforeseen situations (hurricane damage,
etc.) The net fund increase as of July 31, 2015 is $12,018,856, with current year expenditures
totaling $86,911,525 and revenue collections of $98,930,381.
FUND NO. 112
LAW ENFORCEMENT TRUST
FUND
CITY OF DELRAY BEACH FINAL
CAPITAL IMPROVEMENT PLAN 9/4i2015
FY 2016 - 2020
DESCRIPTION
FY2014-15 FY2015-16 FY2016-17 FY2017-18 FY2018-19 FY2019-20
99,250
SOURCE OF FUNDS
15,000
Prior Year Fund Balance
388,572 514,028
Confiscated Property
239,706 121,250
State Fines & Forfeitures
Interest Earnings
Total revenues from all sources628,278
635,278
USES OF FUNDS
FY2014-15
FY2015-16 FY2016-17 FY2017-18 FY2018-19 FY2019-20
Operating Expenses
99,250
Machinery & Equipment
15,000
25,000
Project Reserve
96,250
Total expenditures
ear n
514,028
0
514,028
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 115 PUBLIC ART
FY 2016-2020
FINAL
9/4/2015
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19 FY 19/20
115-0000-248-94.06
Prior Year Reserve
51,328
51,328
51,328
51,328
51,328 51,328
115-0000-381-10.00
Interfund Transfer -General Construction Fund
56,100
114,990
38,625
104,950
90,000 -
115-0000-381-17.00
Interfund Transfer -Recreation Impact Fund
Total Revenues from all sources
107,428
5,622
171,940
89,953
156,278
141,328 51,328
CRA NE 3rd St Street Scape
11-024
18,375
CRA NW 12 Av-Atlantic/MILK
10-041
15,035
USES OF FUND:
CRA Osceola Neigh Imp FY 16
16-649
4,875
CRA-DBCA Site/Park Improvmnts
16-596
115-1702-579-31.90
Operating
56,100
120,612
38,625
104,950
90,000 -
15-011
12,000
CRA SW 1 Av-SW 1 St to Atl Av
16-582
5,950
CRA SW 10th/9th Ave Improv
Total Expenditures
Year End Balance
56,100
51,328
120,612
51,328
38,625
51,328
104,950
51,328
90,000 -
51,328 51,328
USES OF FUNDS:
PROJECT NAME
PROD#
FY 14/15 FY 15/16
FY 16/17 FY 17/18 FY 18/19 FY 19/20
CRA BLK 117 GARAGE STUDY
13-001
99,000
CRA Block 32 Alley
11-009
1,500
CRA Block 63 Alley
15-001
1,500
CRA Block 8 Alley
14-002
1,800
CRA MLK Drive Phase II
15-004
4,800
CRA NE 2 Ave /Seacrest Beaut.
11-067
15,980 20,980
CRA NE 3rd St Street Scape
11-024
18,375
CRA NW 12 Av-Atlantic/MILK
10-041
15,035
CRA Osceola Neigh Imp FY 16
16-649
4,875
CRA-DBCA Site/Park Improvmnts
16-596
18,000
CRA SE 2 St - Swinton SE 3 AV
13-020
12,000
CRA -SE 4th Av Beautification
15-011
12,000
CRA SW 1 Av-SW 1 St to Atl Av
16-582
5,950
CRA SW 10th/9th Ave Improv
14-023
2,620 3,000
CRA SW 4th Ave-Atl-SW 10th
16-669
11,250
CRA SW 6,7,8,9 Ave Atl SW 1st
16-654
3,000
CRA Swinton & Atl Intersection
12-051
22,500
CRA Veterans Park Imp
16-668
3,000
NE 2 Ave/Seacrest PH2
14-071
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 115 PUBLIC ART
FY 2016-2020
FINAL
9/4/2015
ACCOUNT NUMBER ACCOUNT NAME FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20
NE 2 Ave/Seacrest PH3
16-646
NE 2 Ave/Seacrest PH4
16-647
PR Comm Center Rebuild
16-606 90,000
PR -Beach Master Plan FY 14/15
15-008 37,500
PR-Hilltopper Field Imp.
16-551 5,622
PR -Little Fenway Park Build. 16-550
The City appropriates 1.5% of the total eligible construction costs to be used for artist design services and for the selection, acquisition and
display of artwork, and administration of the Public Arts Program.
TOTALi0 i 90,000
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 115 FEDERAL FORFEITURS
FY 2016-2020
FINAL
9/4/2015
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
115-0000-248-99.00
Beginning Fund Balance
602,074
532,540
532,540
532,540
532,540
532,540
Forfeitures
115-0000-355-22.00
87,365
80,000
80,000
80,000
80,000
80,000
Interest on Investments
115-0000-361-10.00
Total Revenues from all sources
1,000
•0613,540
1,000
1,000
1,000
1,000
1,000
613,540
USES OF FUND:
FY 14/15 1
FY 15/16 1
FY 16/17 1
FY 17/18 1
FY 18/19 1
FY 19/20
115-1702-579-31.90
Operating
157,8991
81,0001
81,0001
81,0001
81,0001
81,000
115-2112-521-99.01
Project Reserve
532,5401
532,5401
532,5401
532,5401
532,5401
532,540
Special Project Funds are used to account for Federal contraband forfeitures,
held in trust by the City for a variety of Police related purposes.
Total Expenditures
1 690,439 1
613,5401
613,540 1
613,540 1
613,5401
613,540
FUND NO. 115
SPECIAL PROJECT FUND
FY 16-20
IN LIEU OF PARKING
DESCRIPTION FY2014-15 FY2015-16 FY2016-17
FY2017-18
FY2018-19
FY2019-20
SOURCE OF FUNDS
Beginning Balances:
In Lieu of Parking fees- Area "1" 75,000 75,000 75,000
75,000
75,000
75,000
In Lieu of Parking fees- Areas"2" 100,000 100,000 100,000
100,000
100,000
100,000
In Lieu of Parking fees- Areas "3" 10,000 10,000 10,000
10,000
10,000
10,000
In Lieu of Parking fees- Areas ~a" 0 01 01
0
01
0
Parking License Fees 135,000 135,000 135,000
135,000
135,000
135,000
Total revenues from all sources 320,000 320,000 320,000
320,000
320,000
320,000
AVAILABLE FOR APPROVED PROJECTS
Parking Expenses - Area "1" 75,000 75,000 75,000
75,000
75,000
75,000
Parking Expenses - Areas"2" 100,000 100,000 100,000
100,000
100,000
100,000
Parking Expenses - Areas "T' 10,000 10,000 10,000
10,000
10,000
10,000
Parking Expenses - Areas "4" 0 0 0
0
0
0
Parking Expenses 135,000 135,000 135,000
135,000
135,000
135,000
In Lieu of Parking Fees are monies paid by a commercial property owner in -lieu of
providing a required number of on-site or off-street parking spaces. The fee is based on the
location of the property for which in -lieu fees are being sought. Parking or Valet License
Parking Fees are monies paid for a license to operate a parking facility with a valet service
or operator, allowing for attendants to receive, park, and deliver the automobiles of occupants,
tenants, customers, invitees, and visitors, including tandem parking. All proceeds from such
fees shall be used for parking purposes.
Total expenditures 320,000 320,000 320,000
Year End Balance
320,000
320,000
320,000
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 117 RECREATION IMPACT FEE FUND
FY 2016-2020
SOURCES OF FUNDS:
FINAL
9/4/2015
ACCOUNT NUMBER
ACCOUNT NAME
PROJ# BUDGETED
FY 14/15
FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20
117-4133-572-99.01
PRIOR YEAR FUND BALANCE
412,030
117-0000-301-17.00
PRIOR YEAR SURPLUS
443,680
746,098 328,176 328,676 329,176 329,676
117-0000-303-17.00
PRIOR YEAR ENCUMBRANCES
23,300
374,800 67
117-0000-361-10.00
INTEREST -INVESTMENTS
500
500 500 500 500 500
117-0000-363-17.00
RECREATION IMPACT FEES
25,000
117-0000-366-70.00
CRA CONTRIBUTIONS
150,000
450,000
USES OF FUNDS:
ACCOUNT NUMBER
PROJECT NAME
PROM BUDGETED
FY 14/15
FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20 Page No.
117-4133-572-99.01
PROJECT RESERVE
412,030
117-4151-572-63.40
REC. IMPROV-MERRITT PK RENOVATION
14-052 230,450
488,000 65
117-4151-572-xx.xx
HILLTOPPER FIELD IMPR
16-551
374,800 67
117-9111-581-91.15
PUBLIC ART TRANSFER
5,622
117-6111-519-99.01
MISC. EXPENDITURE -PROJECT RESERVE
TOTAL EXPENDITURES
:0
868,422
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 118 NEIGHBORHOOD SERVICES FUND
FY 2016-2020
FINAL
9/412015
ACCOUNT NUMBER
ACCOUNT NAME
SOURCES OF FUNDS:
BUDGETED
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
Prior Year Fund Balance - FY 13/14
118-0000-301-18.00
Prior Year Surplus
24,455
300,350
300,651
300,651
300,651
300,651
118-0000-303-18.00
Prior Year Encumbrances
42,050
35,000
35,000
35,000
35,000
35,000
118-0000-331-84.xx
Comm Development Block Grant
988,342
408,120
408,124
408,124
408,124
408,124
118-0000-334-42.00
FEMA -Residential Mitigation
239,269
1,440,000
118-0000-334-48.xx
Ship Program
373,770
300,650
300,651
300,651
300,651
300,651
118-0000-361-10.00
Interest -Investments
72,235
69,610
69,610
69,610
69,610
69,610
118-0000-366-28.00
Miscellaneous Contributions
2,070
2,070
2,070
2,070
2,070
2,070
118-0000-366-70.53
NRC Planner/ Inspector Reimbursement
76,810
79,530
76,810
76,810
76,810
76,810
118-0000-366-70.56
Curb Appeal Program
63,939
35,000
35,000
35,000
35,000
35,000
118-0000-366-70.57
Neighborhood Stabilization Program
69,610
69,610
69,610
69,610
69,610
69,610
118-0000-366-70.93
Micro Lending
100,000
35,000
25,000
25,000
25,000
25,000
118-0000-369-31.00
Recovery of Prior Yrs Exp
125,000
118-0000-388-10.00
NSP (Cash) Proceeds
60,750
80,910
80,906
80,906
80,906
80,906
118-0000-381-10.00
118-0000-366-19.01
Transfer from General Fund
149,430
149,430
149,430
149,430
149,430
149,430
Workforce Housing 4,594 1,440,000
Transfer to General Fun
TOTAL•2,600,320i
YEAR •
TOTAL REVENUE 2,134,339 2,600,320 1,147,601 1,147,601 1,147,601
1,147,601
ACCOUNT NUMBER
I PROJECT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
USES OF FUNDS:
118-1924-554
Ship Program -State Grant
373,770
300,350
300,651
300,651
300,651
300,651
118-1930-554
Curb Appeal
163,939
35,000
35,000
35,000
35,000
35,000
118-1931-562
Beacon Center - Village Program
52,000
118-1933-554
Workforce Housing
4,594
1,440,000
118-1930-554
Micro Lending
35,000
25,000
25,000
25,000
25,000
118-1934-554
Neighborhood Stabilization -CRA
72,235
69,610
69,610
69,610
69,610
69,610
118-1935-554
Neighborhood Stabilization -DCA
173,710
80,910
80,906
80,906
80,906
80,906
118-1936-554
FEMA -Residential Mitigation
239,269
118-1961-554
Planning Administration
79,130
79,360
81,624
81,624
81,624
81,624
118-1963-554
Housing Rehab -Federal Grant
568,877
238,870
240,282
240,282
240,282
240,282
118-1965-554
CDBG Misc. Exp -Federal Grant
43,000
25,000
25,000
25,000
25,000
25,000
118-1965-559
Micro Lending
125,000
118-1966-554
Grants/Aids-Fed Grant -Econ Devel
60,750
61,220
61,218
61,218
61,218
61,218
118-1974-554
Neighborhood Housing
230,065
182,7001
228,310
1 228,310
1 228,310
Transfer to General Fun
TOTAL•2,600,320i
YEAR •
300
�__"310
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 119 BEAUTIFICATION TRUST FUND
FY 2016-2020
SOURCES OF FUNDS:
FINAL
9/4/2015
ACCOUNT NUMBER
ACCOUNT NAME
PROJ# BUDGETED
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
Prior Year Fund Balance - FY 13/14
119-0000-361-10.00
Interest -Investments
500
500
500
500
500
119-0000-366-70.00
CRA
36,000
119-0000-381-10.00
General Fund Transfers
870,000
927,000
870,000
870,000
870,000
870,000
119-0000-381-41.00
Water/Sewer Fund Transfers
5,190
5,190
5,190
5,190
5,190
5,190
TOTALREVENUE
875,690
968,190
875,690
875,690
875,690
875,690
USES OF FUNDS:
ACCOUNT NUMBER PROJECT NAME BUDGETED FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20
FY 14/15
119-4144-572 Multi Operating Expenses 875,690 884,750 875,690 875,690 875,690 875,690
119-4144572-99.01 Project Reserve 83,440
TOTAL•0 968,190 875,690 875,690 875,690 875,690
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 332 BEACH RENOURISHMENT GRANT FUND
FY 2016-2020
SOURCES OF FUNDS:
FINAL
9/4/2015
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
Beach Tilling
16,050
16,050
17,000
17,000
20,000
20,000
Prior Year Encumbrances/Surplus
59,343
1,931,320
County Grants
3,510
77,000
25,515
26,012
245,142
49,431
Federal Grants
4,442,369 1
57,900
65,823
67,105
632,418
127,521
State Grants
27,280
12,540
25,515
26,012
245,142
49,431
Transfer from General Fund
TOTALREVENUE
62,330
4,594,8322,016,760
15,000
52,447
169,300
45,171
164,300
44,598
1,167,300
226,383
USLJ OF FUNM:
PROJECT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
Beach Tilling
16,050
16,050
17,000
17,000
20,000
20,000
Final & Constr Engineering
Pre/Post Constr Surveys
136,343
77,000
80,000
65,000
65,000
65,000
Pre -Construction Environmental
1,000,000
Sea Turtle Monitoring
53,150
53,150
55,000
65,000
65,000
65,000
Travel, Training, memberships
9,300
7,900
9,300
9,300
9,300
9,300
Yearly replacement (snow fence)
8,000
6,000
8,000
8,000
8,000
8,000
Bond Issuance Expense
59,083
Beach Renourishment Note Interest
16,582
1,841,980
Beach Renourishment Note Principal
TOTAL•
4,355,407
94
14,680
1 .1
169,300
164,300
1,167,300
226,383
YEAR END BALANCE
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND
FY 2016-2020
FINAL
9/4/2015
ACCOUNT NO.
ACCOUNT NAME
PROM BUDGET -FY 14/15
FY 15/16
FY 16/17 FY 17/18 FY 18/19 FY 19/20 PG. NO.
SOURCES OF FUNDS:
Prior Year Fund Balance - FY 13/14
334-0000-303.34-00
Prior Year Encumbrances
7,265,242
3,706,527
334-0000-301.34-00
Prior Year Surplus
1,881,550
* Federal Grants:
334-0000-331-62.05
Federal Hwy Beautification
1,493,234
* State Grants:
334-0000-334-62.15
NE 2nd Av/Seacrest Beautification
598,340
334-0000-334-xx.xx
NE 2 Ave/Seacrest PH2
267,427
334-0000-334-xx.xx
NE 2 Ave/Seacrest PH3
350,167
334-0000-334-xx.xx
NE 2 Ave/Seacrest PH4
369,375
* Community Redevelopment Agency Contributions
334-0000-366-70.xx
ADA PED Atl. Ave. and 2nd Ave
25,000
334-0000-366-70.18
BILK 117 Garage Study
750,000 6,600,000
334-0000-366-70.47
Block 20 Alley Improvements
40,000
334-0000-366-70.69
Block 32 Alleys
100,000
334-0000-366-70.96
Block 63 Alley
34,637
100,000
334-0000-366-70-85
Block 8 Alley
1,927
120,000
334-0000-366-70.87
Sidewalks/Bikeways FY 16-20
300,000
200,000
300,000 300,000 300,000 300,000
334-0000-366-70.79
Downtown Tree Grate Replacement
15,220
334-0000-366-70.98
E Atl /Venetian Signal
125,000
334-0000-366-70.90
E Atl Av Ped Improvements
160,000
334-0000-366-70.97
E Atl/Gleason Signal
125,000
334-0000-366-70.89
E Atlantic Av Median
1,130
30,000
334-0000-366-70.67
Fire HO Public Plaza
275,000
334-0000-366-70.46
MLK Jr Drive Phase II
320,000
334-0000-366-70.70
NE 2 Ave/SeacrestBeaut.
52,514
800,000
334-0000-366-70.68
NE 3rd Street Scape
650
1,000,000
334-0000-366-70.58
NW 12 Ave-Atlantic/MLK
700,000
334-0000-366-70.xx
NW/SW Nbrhd Alley
300,000
334-0000-366-70.99
NW/SW Neighborhood Alley PH 2
100,000
334-0000-366-70.08
Osceola Alleys Phase 2
141,267
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND
FY 2016-2020
FINAL
9/4/2015
ACCOUNT NO.
ACCOUNT NAME
PROM BUDGET -FY 14/15
FY 15/16
FY 16/17
FY 17/18 FY 18/19 FY 19/20 PG. NO.
334-0000-366-70-xx
Osceola Neigh Imp FY16
175,000
275,000
334-0000-366-70-xx
DBCA Rehab
300,000
334-0000-366-70-xx
DBCA Site/Park Improvmnts
1,200,000
334-0000-366-70.94
Parking Study Impl Proj
215,000
334-0000-366-70-xx
PR Veterans Park Imp
200,000
334-0000-366-70-xx
S Swinton-SW/E 1st Signal
250,000
334-0000-366-70.10
BE 1 st St Conversion to 2 -Way Traffic
18,955
334-0000-366-74.02
BE 2nd SVSW Swinton SE 3rd Av-Osceola
1,025,000
334-0000-366-74.03
SE 4th Ave Beautification
100,000
800,000
334-0000-366-70-xx
SW 1 Av-SW 1 St to Atl Av
63,500
396,500
334-0000-366-70.92
SW 10th/9th Ave Improv
17,710
200,000
334-0000-366-70.91
SW 2nd Terr
65,000
334-0000-366-70-xx
CRA -SW 2nd Street Phase 2
200,000
334-0000-366-70-xx
SW 4th Ave-Atl-SW 10th
100,000
750,000
334-0000-366-70-xx
SW 6,7,8,9 Ave Atl SW 1st
200,000
334-0000-366-70-xx
SWI 4 Ave SW 2nd St 3rd St
100,000
334-0000-366-70.73
Swinton & Atlantic Intersection
9,900
200,000
1,400,000
334-0000-366-70.95
TCRPC LDRS-Treasure Coast
* Interfund Transfers
334-0000-381-10.00
Received from General Fund
176,290
379,927
350,167 369,375
Donation:
334-0000-366-11.08
Hobbit Skate Park
250,000
334-0000-366-11.09
Beach Beautification
40,000
334-0000-366-51.07
Fed Hwy Beautification -Up Town Delray
24,109
Financing:
334-0000-384.14-00
Fire Diesel Exhaust Sys
313,000
334-0000-384.14-00
FS 2 Generator Upgrade
100,000
334-0000-384-14.00
FS#3 Rebuild
600,000
4,000,000
334-0000-384-14.00
IT Disaster Recovery
134,000
334-0000-384-14.00
IT HR Payroll System
300,000
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND
FY 2016-2020
FINAL
9/4/2015
ACCOUNT NO.
ACCOUNT NAME
PROM BUDGET -FY 14/15
FY 15/16
FY 16/17 FY 17/18 FY 18/19 FY 19/20 PG. NO.
334-0000-384-14.00
IT -Sans Storage Disks
30,000
334-0000-381-14-00
IT -Comp Equip R/R(FY 15-20)
125,000
260,000
260,000 260,000 125,000 125,000
334-0000-384-14.00
IT -ERP Strat Plan Upgrade
1,500,000
334-0000-384-14.00
IT-VoIP Phone System
1,100,000
334-0000-384.14-00
New Financial System
900,000
334-0000-384-14.00
PD AED's
90,000
334-0000-384-14.00
PD In -car Video/Equip. Veh.
100,000
334-0000-384-14.00
PD Laptop Replace
61,054
334-0000-384-14.00
PD Laptop Replace
550,000
334-0000-384-14.00
PD Motorola System
6,000,000
334-0000-384-14.00
PD Noritsu Photo Printer Rep
36,000
334-0000-384-14.00
PD P25/Motorola Radio Repl
2,459,977
334-0000-384-14.00
PD Patrol Vehicle GPS
161,500
334-0000-384-14.00
PD Security Cameras
250,000
334-0000-384-14.00
PD Sound Polygraph/Int. RM.
28,900
334-0000-384-14.00
PR Ballfields Control Sys
60,000
334-0000-384-14.00
PR Comm Center Rebuild
25,000 900,000 5,100,000
334-0000-384-14.00
PR Hilltopper Lights R&R
175,300
Transfer from the General Fund
334-0000-381-10.00
PR -Teen Center RoofRepl
100,000
334-0000-381-10.00
Debt Financing
92,000
334-0000-384-37.49
2015 Util Rev REF/IMP BND
15,100,000
•
•
• 675,000
ACCOUNT NUMBERI PROJECT NAME I PROD# I FY 14/15 1 FY 15/16 1 FY 16/17 1 FY 17/18 1 FY 18/19 1 FY 19/20 IPAGE NO
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND
FY 2016-2020
FINAL
9/4/2015
ACCOUNT NO.
ACCOUNT NAME
PROM
BUDGET -FY 14/15
FY 15/16
FY 16/17 FY 17/18 FY 18/19 FY 19/20
PG. NO.
USES OF FUNDS:
334-3162-541-65.36
Barwick Road
15-058
79,879
334-4141-572-68.83/54 Beach Beautification
105,970
334-6112-519-31.30
City Hall Lobby Makeover
13-083
579
334-6111-519-63.90
City Wide Master Sign
14-005
25,000
334-3162-541-xx.xx
CRA -ADA PED Atl. Ave. and 2nd Ave
16-650
25,000
69
334-3151-545-31.90/x
CRA-BLK 117 Garage
13-001
400
750,000 6,501,000
71
334-3162-541-68.56
CRA -Block 20 Alley Improvements
2009-06
40,000
334-3162-541-xx.xx
CRA -Block Alleys 32
98,500
73
334-3162-541-68.98
CRA -Block 63 Alley
15-001
34,637
98,500
75
334-3162-541-68.96
CRA -Block 8 Alley
14-002
10,326
118,200
77
334-3162-541-63.11
CRA- Dist Sidewalks FY 15
15-002
300,000
334-3162-541-61.17
CRA Sidewalks FY16
16-672
200,000
300,000 300,000 300,000 300,000
79
334-3162-541-68.99
CRA -E Atl /Venetian Signal
14-078
125,000
334-3162-541-63.11
CRA -E Atl Av Ped Improvements
14-008
48,006
160,000
81
334-3162-541-68.99
CRA -E Atl/Gleason Signal
14-077
125,000
334-3162-541-61.15
CRA -E Atlantic Av Median
14-007
1,130
30,000
83
334-2311-522-68.71
CRA -Fire HO Public Plaza
11-017
275,000
334-3162-541-68.57
CRA-MLK Drive Phase II
15-004
315,200
85
334-3162-541-68.78
CRA -NE 2 Ave/Seacrest Beaut.
11-067
28,435
1,377,360
87
334-3162-541-68.72
CRA -NE 3rd Street Scape
11-024
130,205
981,625
89
334-3162-541-68.60
CRA -NW 12 Av-Atlantic/MLK
2010-41
56,319
684,965
91
334-3162-541-68.98
CRA-NW/SW Neighborhood Alley
15-040
100,000
300,000
93
334-3162-541-65.85
CRA -Osceola Alleys
13-015
141,267
334-3162-541-xx.xx
CRA -Osceola Neigh Imp FY 16
16-649
175,000
270,125
95
334-4151-572-xx.xx
CRA- DBCA Rehab
16-514
300,000
97
334-4151-572-xx.xx
CRA-DBCA Site/Park Improvmnts
16-596
1,182,000
99
334-3162-541-34.65
CRA -Parking Study Impl Proj
14-069
215,000
101
334-4126-572-63.90
CRA -PR Veterans Park Imp
16-668
197,000
103
334-3162-541-68.32
CRA -S Swinton -SW/SE 1 st Signal
13-022
37,357
250,000
105
334-3162-541-65.88
CRA -SE & NE 1 st St One -Way Pair
2004-06
18,955
334-3162-541-68.30
CRA -SE 2 St- Swinton SE 3 Av-Constr
13-020
27,160
1,013,000
107
334-3162-541-69.25
CRA -SE 4th Av Beautification -Design
15-011
100,000
788,000
109
334-3162-541-xx.xx
CRA -SW 1 Av-SW 1 St to Atl Av
16-582
63,500 390,550
111
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND
FY 2016-2020
FINAL
9/4/2015
ACCOUNT NO.
ACCOUNT NAME
PROM
BUDGET -FY 14/15
FY 15/16
FY 16/17 FY 17/18 FY 18/19 FY 19/20
PG. NO.
334-3162-541-68.95
CRA -SW 10th/9th Ave Improv -Design
14-023
17,710
197,000
113
334-3162-541-68.94
CRA -SW 2nd Terr
14-024
7,749
65,000
115
334-3162-541-xx.xx
CRA -SW 2nd Street Phase 2
16-676
200,000
393
334-3162-541-xx.xx
CRA -SW 4th Ave-Atl-SW 10th
16-669
100,000
738,750
117
334-3162-541-xx.xx
CRA -SW 6,7,8,9 Ave Atl SW 1st
16-654
197,000
119
334-3162-541-xx.xx
CRA-SW14 Ave SW 2nd St 3rd St -Design
16-655
100,000
121
334-3162-541-68.86
CRA -Swinton & Atlantic Intersection
12-051
12,911
200,000
1,377,500
123
334-3162-541-68.52
Fed Hwy Beautification
2009-09
6,810,840
334-2311-522-64.90
Fire Diesel Exhaust Sys
14-089
337,750
334-2311-522-68.71
Fire HO Public Plaza
11-017
3,432
334-2311-522-64.90
Fire -Zoll E Series
18,000
334-2311-522-64.90
FS 2 & 3 Generator Upgrade
54,230
334-2311-522-64.90
FS 2 Generator Upgrade
16-571
100,000
125
334-2311-522-64.90
FS 5 Generator R&R
14-011
50,000
334-2311-522-xx.xx
FS#3 Rebuild
16-613
600,000
4,000,000
127
334-6111-519-31.90
ILA -Treasure Coast/City/CRA-Land Dev Regulation
63,750
334-6111-519-xx.xx
IT HR Payroll System
16-642
300,000
129
334-6112-519-64.12
IT- Office Equipment
15-003
7,670
334-6111-519-xx.xx
IT -Sans Storage Disks
15-613
30,000
131
334-6111-519-64.11
IT -Comp Equip R/R(FY 15-20)
167,400
260,000
260,000 260,000 125,000 125,000
133
334-6112-519-64.11
IT -Disaster Recovery
16-640
134,000
135
334-6112-519-xx.xx
IT -ERP Strat Plan Upgrade
16-641
1,500,000
137
334-6112-519-64.11
IT -OMS Server Replacement
14-013
1,575
334-6112-519-xx.xx
IT-VOIP Phone System
16-644
1,100,000
139
334-3162-541-68.84
NE 1stAv Improvements
12-042
38,554
334-3162-541-68.78
NE 2 Ave/SeacrestPH2
14-071
106,624
534,854
141
334-3162-541-xx.xx
NE 2 Ave/Seacrest PH3
16-646
700,334
143
334-3162-541-xx.xx
NE 2 Ave/Seacrest PH4
16-647
112,500 738,750
145
334-6111-519-66.15
New Financial System
12-012
900,000
334-4151-572-64.90
OSS Gym AC R&R
14-015
80,000
334-2111-521-xx.xx
PD AED's
16-593
90,000
203
334-2111-521-xx.xx
PD In -car Video/Equip. Veh.
16-562
100,000
211
334-2115-521-44.30
PD -Laptop Lease Purchase
550,000
334-2115-521-xx.xx
PD Laptop Replace
15-006
61,054
147
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND
FY 2016-2020
FINAL
9/4/2015
ACCOUNT NO.
ACCOUNT NAME
PROM
BUDGET -FY 14/15
FY 15/16
FY 16/17 FY 17/18 FY 18/19 FY 19/20
PG. NO.
334-2111-521-64.32
PD Motorola System
15-007
6,000,000
334-2111-521-xx.xx
PD Noritsu Photo Printer Rep
16-553
36,000
215
334-2111-521-xx.xx
PD P25/Motorola Radio Repl
16-564
2,459,977
149
334-2111-521-xx.xx
PD Patrol Vehicle GPS
16-598
161,500
151
334-2111-521-xx.xx
PD Security Cameras
15-565
250,000
153
334-2111-521-xx.xx
PD Sound Polygraph/Int. RM.
16-567
28,900
155
334-2111-521-46.20
PD -A/C Replacement -PD Roof Top -Balance Due
25,935
334-2111-521-63.90
PD -Range Roof
14-016
50,000
334-4151-572-xx.xx
PR Ballfields Control Sys
16-600
60,000
223
334-4125-572-62.10
PR Comm Center Rebuild
16-606
25,000 900,000 5,010,000
157
334-4151-572-31.90
PR -Beach Master Plan FY 14/15
15-008
75,000
334-4144-572-63.20
PR -Beach Master Plan
2,962,500
334-4173-572-62.10
PR -Little Fenway Park Build
11-022
420,500
334-4173-572-xx.xx
PR Hilltopper Lights R&R
16-611
175,300
225
334-4151-572-69.24
PR -Hobbit Skate Park
15-009
250,000
334-4123-572-62.14
PR -Lifeguard Towers
14-019
72,000
159
334-4151-572-31.90
PR -Parks Master Plan
12-044
60,140
334-4127-572-62.10
PR -Pompey Bldg Reroof
14-020
276,330
334-4119-572-xx.xx
PR -Teen Center Roof Repl
16-658
100,000
255
334-3162-541-31.90
Sign Warrant Studies
15-060
7,900
334-3162-541-61.17
StreetResurf/Reconstr-
11-108
2,604
334-3162-541-61.17
Street Resurfacing FY 15
14-022
251,290
334-9111-581-91.01
Transfer to General fund
334-3162-541-31.30
Transport Element Upgrade
14-094
33,615
334-9111-581-91.15
Trnsfr to Special Fund -Public Arts
56,100
114,990
38,625 104,950 90,000 -
334-xxxx-xxx-xx.xx
Expenses -PY Encumbrances
3,706,527
334-6511-581-99.01
Contingency - Project Reserve
6,000,000
334-7111-519-71.43
Debt Service -General Construction Note-Princ
7,522,170
334-7111-519-72.43
Debt Service -General Construction Note -Int
71,064
334-7111-519-71.43
Debt Service- Financing
92,000
CAPITAL MAINTENANCE PROJECTS:
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND
FY 2016-2020
FINAL
9/4/2015
ACCOUNT NO.
ACCOUNT NAME
PROM
BUDGET -FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20 PG. NO.
334-6112-519-46.10
Building Maintenance
16-581
13,850
334-3162-541-46.17
CRA -Tree Grate Replacements
13-023
15,220
334-6111-519-52.27
Equipment<$1,000
14-012
2,600
334-6112-519-51.20
IT Computer Equip - <$1,000
15-003
116,440
334-3162-541-46.15
Pompey Baseball Field
12-081
19,465
334-3162-541-46.90
NE/SE 4 Ave Signal Repair
15-059
6,535
334-3162-541-46.90
RR X-ing Annual Maint (FY 15-19)
15-010
55,686
334-3162-541-46.90
BE & NE 1 st St One -Way Pair
2004-06
16,919
334-3162-541-46.90
Sign Inventory 2014
14-084
22,834
334-4145-572-46.90
TC -Tennis Court Rehab
16-615
31,818
Total Expenditures
fil$
334-3162-541-xx.xx JlBarwick Road -Sidewalks 16-504 1 1 185,0001 160,000 1 160,000 161
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND
FY 2016-2020
FINAL
9/4/2015
ACCOUNT NO.
ACCOUNT NAME
PROM
BUDGET -FY 14/15 FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
PG. NO.
334-6111-519-xx.xx
Bldg for Christmas Tree
16-580
40,000
163
334-6111-572-xx.xx
Bridge Repair & Maint
16-520
50,000
50,000
50,000
50,000
50,000
165
334-4125-572-xx.xx
Comm Ctr Roof Repair
16-659
25,000
167
334-4151-572-xx.xx
DBCA Digital Signage
16-612
240,000
169
334-6111-519-xx.xx
Electric Board & Signs
16-509
25,000
171
334-6111-519-xx.xx
Electronic Charging Stat
16-661
25,000
173
334-3162-541-xx.xx
FEC Pedestrian Gates
16-522
50,000
50,000
50,000
50,000
175
334-2311-522-xx.xx
Fire -Training Center
16-604
216,000
191,000
177
334-2311-522-xx.xx
FS Hard Floor Installment
16-575
50,000
179
334-4144-572-63.20
FS Lifeguard Towers
16-578
77,400
77,400
77,400
77,400
181
334-2311-522-xx.xx
FS#1 Apparatus Floor Res
16-574
39,560
183
334-2311-522-xx.xx
FS#1 Kitchen Remodeling
15-551
26,000
185
334-6111-519-xx.xx
Historic House Repairs
16-660
25,000
25,000
25,000
25,000
25,000
187
334-6112-519-xx.xx
HR/Risk/Chamber Renovate
16-620
60,000
340,000
189
334-6111-519-xx.xx
IT Online Plan Review
16-643
300,000
191
334-6112-519-xx.xx
Lobby -1 st FI Restroom Imp
16-619
30,000
170,000
193
334-3162-541-xx.xx
NE 8th Av Paving
13-060
84,300
195
334-3162-541-xx.xx
Pave Alleyway
16-570
125,000
197
334-2111-521-64.90
PD A/C R&R
15-550
35,000
80,000
199
334-2111-521-xx.xx
PD Add. RMS License
16-563
37,500
201
334-2111-521-xx.xx
PD ALPR Cameras Project
16-651
75,000
75,000
205
334-2111-521-xx.xx
PD Computer Room Relocate
16-652
260,000
207
334-2111-521-xx.xx
PD Impact Door Windows
16-653
45,000
209
334-2111-521-xx.xx
PD Latent Print Station
16-555
75,000
213
334-2111-521-xx.xx
PD Range Track Syst. Repl
16-560
80,000
217
334-2111-521-xx.xx
PD Tactical Obs. Platform
16-568
73,000
219
334-4151-572-xx.xx
PR Atl Dunes Nature TO
16-586
25,000
183,564
221
334-4151-572-xx.xx
PR LED Message Signs
16-601
254,700
227
334-4173-572-62.10/(IZ PR Fenway Concession Bldg
10-100
227A
334-4173-572-63.90
PR Miller Park Gas Mit
16-597
38,205
216,495
229
334-4173-572-63.90
PR Miller Park Shade Syst
16-592
90,000
231
334-41xx-572-xx.xx
PR Office Expansion
16-587
13,500
90,000
233
334-4127-572-xx.xx
PR Pompey Gym PA Syst
16-602
25,000
235
334-4127-572-xx.xx
PR Pompey Pk Shade Syst
16-588
66,000
237
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 334 GENERAL CONSTRUCTION FUND
FY 2016-2020
FINAL
9/4/2015
ACCOUNT NO.
ACCOUNT NAME
PROM
BUDGET -FY 14/15 FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20 PG. NO.
334-4127-572-xx.xx
PR Pompey Pool Redesign
14-027
54,000
306,000
239
334-4173-572-62.10
PR-Hilltopper New Bldg
16-599
58,500
331,500 241
334-6112-519-xx.xx
PW Keyless Lock/Entry System
15-548
25,000
25,000
25,000
25,000
243
334-6112-519-xx.xx
PW Locker Rm Maintenance
16-614
25,000
245
334-6112-519-xx.xx
PW Parking
16-607
55,000
247
334-3162-541-46.90
RR X-ing Annual Maint (FY 15-19)
15-010
75,000
75,000
75,000
75,000
75,000 249
334-3162-541-61.17
Signalized Crosswalk
16-528
60,000
251
334-3162-541-xx.xx
I St Lt Upg SE 7 Ave 2nd St
16-657
1
1
1 25,000
1
253
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 380 2004 G.O.Bond
FY 2016-2020
SOURCES OF FUNDS:
FINAL
9/4/2015
UJLS OF FUNUS:
ACCOUNT NUMBER PROJECT NAME FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20
380-4150-572-31.90 Other Professional Services 1,050
380-4150-572-99.01 Project Reserve
TOTAL EXPENDITURES 1,050
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 426 MARINA FUND
FY 2016-2020
SOURCES OF FUNDS:
FINAL
9/4/2015
ACCOUNT NUMBER
ACCOUNT NAME
BUDGETED
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
92,390
92,390
FY 14/15
92,390
426-4311-581-99.01 Project Reserve 387,362
75,820
73,690
73,690
426-0000-301-42.00
Prior Year Surplus
350,270
52,970
52,970
52,970
52,970
52,970
426-0000-329-xx.xx
Other License/Fees/Permits
1,800
1,700
1,700
1,700
1,700
1,700
426-0000-347-51.00
Wastewater Pump Station
3,100
3,100
3,100
3,100
3,100
3,100
426-0000-347-81.00
Marina Dock Fees
213,000
213,000
213,000
213,000
213,000
213,000
426-0000-347-82.00
Late Fees
300
300
300
300
300
300
426-0000-361-10.00
Interest on Investments
450
450
450
450
450
450
426-0000-362-25.00
Comm -King Coin Laundry - Rent
250
200
200
200
200
200
426-000-369-00.00
Misc. Revenue
200
1 300
1 300
300
1 300
1 300
TOTAL REVENUE 569,370 219,050 219,050 219,050 219,050 219,050
USES OF FUNDS:
ACCOUNT NUMBER PROJECT NAME Proj# FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
Multi Operating Cost 132,158
90,260
92,390
92,390
92,390
92,390
426-4311-581-99.01 Project Reserve 387,362
75,820
73,690
73,690
73,690
73,690
426-4311-572-91.01 Transfer to General Fund 49,850
52,970
52,970
52,970
52,970
52,970
YEAR END BALANCE
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 441 WATER/SEWER NEW CAPITAL
FY 2016-2020
SOURCES OF FUNDS:
FINAL
9/4/2015
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
FY 19/20
Page
No.
Prior Year Fund Balance FY 13/14
441-5161-536-49.23
Reclaim Water Customer Connection
14/15
15-014
220,000
441-0000-301-xx.xx
Prior Year Surplus
3,537,863
1,500,000
1,630,000
1 1,550,000
2,750,000
2,605,000
441-0000-303-41.00
Prior Year Encumbrances
119,106
Muli
Revenue from Current Operations
15-013
1,700,000
1,800,000
1,800,000
1,800,000
1,800,000
441-0000-343-34.00
Water Connection Charges
100,000
100,000
100,000
100,000
100,000
100,000
441-0000-343-52.00
Sewer Connection Charges
150,000
250,000
250,000
250,000
250,000
250,000
TOTAL REVENUE 3,906,969 3,550,000 3,780,000 3,700,000 4,900,000 4,755,000
USES OF FUNDS:
ACCOUNT NUMBER
PROJECT NAME
Proj#
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
Page
No.
441-5161-536-49.23
Reclaim Water Customer Connection
14/15
15-014
220,000
220,000
220,000
220,000
220,000
261
441-5161-536-49.23
Reclaim Water Customer Connection
24,541
441-5161-536-65.96
Reclaim Water Transmission FY 14/15
15-013
125,000
441-5161-536-68.73
Reclaim Water, Area 12A
14-029
7,180
441-5161-536-68.79
Reclaim Water, Area 12B
12-009
1,198,905
1,200,000
263
441-5161-536-xx.xx
Reclaim Water, Area 12C
12-615
140,000
1,460,000
265
441-5161-536-xx.xx
Reclaim Mat Plan Update
16-539
80,000
267
441-5161-536-xx.xx
Recl. Water Area 6
16-538
130,000
1,050,000
269
441-5161-536-xx.xx
Recl. Water Area 10
16-595
285,000
1,200,000
271
441-5161-536-xx.xx
Recl. Water Area 8
16-594
90,000
600,000
273
441-5161-536-
SCRWWTP City Cont.
16-535
500,000
550,000
600,000
650,000
700,000
275
441-5181-536-65.96
Reclaim Water Transmission
819,734
441-5181-536-34.83
SCR -Reclaim & Deepwell
2007-39
11,609
Project Reserve
1,500,000
1,630,000
1,550,000
2,750,000
2,605,000
2,035,000
YEAR END BALANCE
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 442 - WATER/SEWER NEW CAPITAL FUND
FY 2016-2020
SOURCES OF FUNDS:
FINAL
9/4/2015
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20
FY 14/15
FY 15/16
FY 16/17
Page
FY 17/18 FY 18/19 FY 19/20 No.
Prior Year Surplus FY 13/14
Aband./Demo. LS 80
442-0000-301-24.00
Prior Year Encumbrance
3,044,081
Prior Year Surplus
Prior Year Surplus
2,798,365
Transfer from W/S Fund
ITransfer from W/S Fund
6,681,740 5,123,000 3,125,000 2,700,000 2,875,000 2,700,000
TOTALREVENUE
12,524,186 5,123,000 3,125,000 2,700,000 2,875,000 2,700,000
USES OF FUNDS:
CCOUNT NUMBEF
PROJECT NAME
Proj#
FY 14/15
FY 15/16
FY 16/17
Page
FY 17/18 FY 18/19 FY 19/20 No.
442-5178-536-xx.xx
Aband./Demo. LS 80
16-543
100,000
277
442-5178-536-64.46
Automated Mtr Rdng (AMR) FY 14
12-013
6,613,617
442-5178-536-68.70
CRA -Block 32 Alley
11-009
75,000
442-5178-536-51.20
Equipment<$1,000
20,000
442-5178-536-68.93
Delray Shores W/M PH 2
14-030
1,487,205
442-5178-536-xx.xx
Delray Shores W/M PH 3
15-054
91,000
983,000 279
442-5178-536-xx.xx
EI Dorado Ln WM Upgrade
15-051
225,000
281
442-5178-536-xx.xx
Elev Tank Maint (16-20)
16-629
70,000
25,000
25,000 25,000 25,000 283
442-5178-538-46.90
Elev Strg Tnk Maint
15-015
19,500
442-5178-536-68.52
Fed Hwy Beautification
2009-009
351,859
442-5178-536-63.88
Force Main Replacement
14-039
479,054
442-5178-536-xx.xx
Golf Club Estates Wtr Swr
13-088
225,000
1,275,000
287
442-5178-536-46.26
Hydrant Flushing FY 15
15-016
70,000
-
-
442-5178-536-xx.xx
IT Cartegraph OMS
16-639
140,000
289
442-5178-536-44.30
IT -Disaster Recovery
16-640
33,000
135
442-5178-536-66.10
IT -ERP Strat Plan Upgrade
16-641
250,000
137
442-5178-536-64.90
IT-VoIP Phone System
16-644
50,000
139
442-5178-536-xx.xx
Lake Ida Drain Study
13-072
275,000
291
442-5178-536-31.30
Levis Cove Rd Drainage
14-065
25,000
442-5178-536-xx.xx
Lift Station 1 Upgrade
16-632
150,000
500,000
293
442-5178-536-xx.xx
Lift Station Rehab 16-20
16-631
75,000
75,000
75,000 75,000 75,000 295
442-5178-536-68.15
LS Wet Well Rehab FY 14
14-033
90,378
442-5178-536-68.15
LS Wet Well Rehab FY 15
15-017
60,352
442-5178-536-68.53
LS Wet Well Rehab FY 14
61,700
442-5178-536-68.53
LS Wet Well Rehab FY 15
15-018
13,000
70,000
70,000
70,000 70,000 70,000 297
442-5178-536-46.24
Repair Sewer Mains
26,000
442-5178-536-68.64
N Lake Ida Area WM
2010-069
26,380
442-5178-536-68.78
CRA -NE 2 Ave/Seacrest Beaut.
11-067
30,000
442-5178-536-65.78
NE 2 Ave/Seacrest PH2
14-071
25,000
76,000
141
442-5178-536-xx.xx
NE 2 Ave/Seacrest PH3
16-646
25,000
75,000 143
442-5178-536-xx.xx
NE 2 Ave/Seacrest PH4
16-647
75,000
250,000 145
442-5178-536-68.72
CRA -NE 3rd St Street Scape
11-024
100,000
89
442-5178-536-64.15
New Financial System -Comp Equip
12-012
30,000
442-5178-536-68.60
CRA -NW 12th Av/Atlantic/MLK
2010-41
8,885
75,000
91
442-5178-536-xx.xx
NW 1st Ave NW 2nd Ave WM
16-633
1 150,0001
299
442-5178-536-xx.xx
NW 17th Street WM Upgrade
INW
16-634
105,000
301
442-5178-536-xx.xx
4th Ave WM Upgrade
1 15-050 1
75,000
303
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 442 - WATER/SEWER NEW CAPITAL FUND
FY 2016-2020
SOURCES OF FUNDS:
FINAL
9/4/2015
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
442-5178-536-68.75
NW 4 Av & 3 Av WM
11-042
508,530
442-5178-536-xx.xx
NW 9th Ave WM Upgrade
15-053
105,000
305
442-5178-536-65.85
Osceola Park WM Ph2
2010-082
279
442-5178-536-46.90
Other Repair/Maint Cost
75,000
442-5178-536-68.14
Prdctn Well Rehab FY 14
14-035
70,600
442-5178-536-68.14
Prdctn Well Rehab FY 15
15-019
200,000
442-5178-536-68.14
Prdctn Well Rehab FY 16-20
16-635
150,000
150,000
150,000
100,000
100,000
307
442-5178-536-xx.xx
Prospect St WM Upgrade
16-636
120,000
309
442-5178-536-64.90
PU Generator Rplcmt FY 15
15-042
75,000
75,000
75,000
75,000
75,000
75,000
311
442-5178-536-xx.xx
Reclaimed Water, Area 12B
12-009
70,000
263
442-5178-536-xx.xx
Reclaimed Water, Area 12C
12-615
120,000
265
442-5178-536-63.82
San Swr Manhole Rehab
15-020
64,233
50,000
50,000
50,000
50,000
50,000
313
442-5178-536-xx.xx
San Swr Main Rehab
15-021
100,000
100,000
100,000
100,000
100,000
315
442-5178-536-63.51
Sewer Mains
26,565
442-5178-536-46.24
San Swr Main Rehab FY
13-033
51,400
442-5178-536-68.94
SW 2nd Terr
14-024
71,826
75,000
115
442-5178-536-xx.xx
SW 11th Av WM
16-637
120,000
317
442-5178-536-xx.xx
SCRWWTP City Cont. R&R
16-540
84,000
84,000
84,000
84,000
84,000
319
442-5178-536-xx.xx
Sunshine Or WM
15-052
225,000
321
442-5178-536-xx.xx
System 58A Force Mn Rplcmt
14-039
175,000
323
442-5178-536-68.97
Tropic Palms WM Ph 1
14-061
778,464
-
442-5178-536-68.97
Tropic Palms WM Ph 2
15-022
158,000
773,000
325
442-5178-536-68.97
Tropic Palms WM Ph 3
16-608
99,000
660,000
327
442-5178-536-xx.xx
W MTR RR Lrg Meters FY 16-20
16-638
15,000
15,000
15,000
15,000
15,000
329
442-5178-536-31.90
Water Dist Syst Eval FY 15-20
15-023
110,000
150,000
50,000
150,000
150,000
150,000
331
442-5178-536-64.90
Water Line Flushers
15-024
90,293
-
442-5178-536-63.50
Water Mains
18,535
442-5178-536-61.81
Water Mtr R/R Srvcs FY 15 -20
15-025
50,000
50,000
50,000
50,000
50,000
50,000
333
442-5178-536-49.33
Water Service Reloc FY 14
14-041
8,950
442-5178-536-49.33
Water Service Reloc
15-026
25,000
25,000
25,000
25,000
25,000
25,000
335
442-5178-536-31.30
Water Supply/Facilities Plan Update
14-079
36,581
442-5178-536-49.34
Water Valve R/R
15-027
36,000
36,000
$6,000
36,000
36,000
337
442-5178-536-64.90
WTP Ammonia Tank Rpcmt
15-028
30,000
30,000
339
442-5178-536-64.90
WTP Bleach Tank FY 15
15-029
50,000
50,000
341
442-5178-536-65.92
WTP Clarifier 1&3 Rehab
14-043
160,000
442-5178-536-65.92
WTP Clarifier Rehab
15-030
175,000
175,000
343
442-5178-536-46.90
WTP Filter Drn Valve
15-031
65,000
65,000
50,000
50,000
50,000
50,000
345
442-5178-536-64.90
WTP Lime Slacker Rplcmt
15-032
151,000
200,000
347
442-5178-536-99.01
Project Reserve
71,000
35,0001
588,0001
1,060,000
1,795,000
YEAR END BALANCE
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 442 - WATER/SEWER NEW CAPITAL FUND
FY 2016-2020
FINAL
9/4/2015
SOURCES OF FUNDS:
ACCOUNT NUMBER I ACCOUNT NAME FY 14/15 1 FY 15/16 FY 16/17 FY 17/18 1 FY 18/19 FY 19/20
ACCOUNT NUMBER ACCOUNT NAME FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20
442-5178-536-xx.xx Zeder Av 16-674 250,000
442-5178-536-xx.xx INE 8th Ave Paving 13-060 50,000
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 445 - DELRAY BEACH MUNICIPAL GOLF COURSE FUND
FY 2016-2020
SOURCES OF FUNDS:
FINAL
9/4/2015
ACCOUNT NUMBER
ACCOUNT NAME
FROM FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
445-4761-572-63.40
Prior Year Fund Balance
112,000
445-4761-572-46.10
Building Maintenance
55,000
35,000
445-0000-301-45.00
Prior Year Surplus/Deficit
436,110
670,890
445-7111-582-71.xx
Debt Service -Bonds
378,270
467,860
445-0000-303-45.00
Prior Year Encumbrances
31,070
26,950
0
136,553
308,441
516,680
445-0000-347-xx.xx
Revenue from Current Operations
3,048,230
3,129,440
3,192,029
3,255,869
3,320,987
3,387,406
445-0000-362-41.xx
Rental Income
27,650
28,340
29,190
30,066
30,9681
31,897
441-0000-369-xx.xx
Misc Revenue
1 29,730
1 29,7301
30,3251
30,9311
31,5501
32,181
445-0000-335-41.00
State Gasoline Tax -Refund
1 1,750
1 1,7501
1,7501
1,7501
1,7501
1,750
TOTAL REVENUE 3,543,470 3,860,150 3,253,294 3,455,169 3,693,695 3,969,914
USES OF FUNDS:
ACCOUNT NUMBER
PROJECT NAME
FY 14/15
FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20
445-4761-572-64.90
Mach/Equip(<$25,000)-FY 14-18
14-045 72,000
343,000 100,000 100,000 100,000 100,000
445-4761-572-63.40
Recreational Improvements
112,000
445-4761-572-46.10
Building Maintenance
55,000
35,000
multi
Other Operating Costs
2,877,130
2,969,340 2,998,741 3,028,728 3,059,015 3,089,605
445-7111-582-71.xx
Debt Service -Bonds
378,270
467,860
445-7111-582-72.xx
IDebtService-Debt Service Int
31,070
26,950
445-9111-581-91.01
General Fund Transfer
18,000
18,000 18,000 18,000 18,000 18,000
*Leasing new golf carts in 15-16 ($250,000 shown above in Mach/Equip)
**FY 15-16 includes $4,000,000 for golf course restoration including irrigation replacement projected to go to debt service
YEAR END BALANCE
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 446 - LAKEVIEW GOLF COURSE FUND
FY 2016-2020
SOURCES OF FUNDS:
FINAL
9/4/2015
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17 FY 17/18
FY 18/19
FY 19/20
FY 19/20
Prior Year Fund Balance
Debt Service -Bonds
164,620
91,070
446-0000-301-39.00
Prior Year Surplus/Deficit
149,110
73,920
22,239
52,082
89,738
446-0000-303-46.00
Prior Year Encumbrances
30,000
446-47xx-572-xx.xx
Other Operating Costs
568,790
571,050
446-0000-347-xx.xx
Revenue from Current Operations
653,800
655,540
668,651 682,024
695,664
709,578
446-0000-335-41.00
State Gasoline Tax -Refund
500
500
500 500
500
500
446-0000-369-99.00
Miscellaneous Revenue
5,000
1 5,000
1 5,000 5,000
5,000
5,000
TOTAL808,410
I TOTALREVENUE
808,410
734,960
674,151 709,763
753,246
804,816
USES OF FUNDS:
ACCOUNT NUMBER
PROJECT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
446-7111-582-xx.xx
Debt Service -Bonds
164,620
91,070
446-7111-582-xx.xx
Debt Service -Cart Lease
30,000
32,840
30,000
30,000
30,000
30,000
446-47xx-572-xx.xx
Other Operating Costs
568,790
571,050
576,912
582,681
588,508
594,393
446-4761-572-64.90
LV Golf Course Equip -FY 14-18
40,000
35,000
40,000
40,000
40,000
40,000
446-9111-581-91.01
General Fund Transfer
5,000
5,000
5,000
5,000
5,000
5,000
TOTAL808,410
734,960
•:
669,393
YEAR END BALANCE
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 448 - STORM WATER FUND
FY 2016-2020
FINAL
9/4/2015
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
USES OF FUNDS:
SOURCES OF FUNDS:
448-5461-538-68.55
Alley Drainage Improv
448-0000-301-49.00
Prior Year Project Surplus
786,406
1,650,460
448-5461-538-68.82
Alley Drainage Improv,
11-113
448-0000-303-49.00
Prior Year Encumbrances
544,267
349
448-5461-538-31.30
Barrier Island Drainage Study
13-053
692
448-0000-343-61.00
Revenue from Storm Water Charges
2,205,760
2,205,760
2,586,120
2,200,000
2,200,000
2,200,000
448-0000-343-62.00
Delinquent Storm Water Service Chrg
1,000
4,000
4,000
4,000
4,000
448-0000-338-90.00
Interest from Tax Collector
500
500
500
500
500
73
448-0000-361-22.00
Delinquent Storm Water Service Interest
5,000
2,000
2,000
2,000
2,000
448-5461-538-xx.xx
448-0000-361-10.00
Interest from Investments
10,000
53,170
10,000
10,000
10,000
Debt Service
448-0000-3xx-xx.xx
Fed Grant- Lakeview Drainage Imp.
53,650
448-7111-538-xx.xx
Debt Service -Bonds
1 100,000
TOTAL REVENUE 3,552,933 3,915,890 2,602,620 2,216,500 2,216,500 2,300,000
ACCOUNT NUMBER
PROJECT NAME
Proj#
FY 14/15
FY 15/16
FY 16/17 FY 17/18 FY 18/19
FY 19/20 Page No.
USES OF FUNDS:
448-5461-538-68.55
Alley Drainage Improv
2009-15
108,700
448-5461-538-68.82
Alley Drainage Improv,
11-113
68,590
74,640
349
448-5461-538-31.30
Barrier Island Drainage Study
13-053
692
448-5461-538-68.18
Basin Pump Ste Upgrade
15-033
21,700
100,000 75,000
351
448-5461-538-68.56
CRA -Block 20 Alley Improv
2009-06
4,930
448-5461-538-68.70
CRA -Block 32 Alley
11-009
71,000
73
448-5461-538-68.96
CRA -Block 8 Alley
14-002
123,074
448-5461-538-xx.xx
City Swales
16-519
85,000 100,000 100,000
100,000 353
448-7111-582-71.xx
Debt Service
53,650
448-7111-538-xx.xx
Debt Service -Bonds
106,840
448-5461-538-xx.xx
Delhaven Drainage Imp.
16-510
150,000 355
448-5461-538-69.30
Dover /Lowson Culvert Rpl
14-100
216,470
448-5461-538-46.43
Drainage Swales -FY 15
123,145
448-5461-536-68.52
Fed Hwy Beautification
2009-009
353,378
448-5461-536-68.71
Fire HQ Public Plaza
11-017
49,500
448-5461-538-31.30
Forest Rd Drainage
13-081
110,000
448-5461-538-xx.xx
ICWW Flap Gates
16-515
20,000 20,000
357
448-5461-538-49.90/63.90
Iris Drive Drainage
14-082
134,455
448-5461-538-44.30
IT -Disaster Recovery
16-640
33,000
135
448-5461-538-66.10
IT -ERP Strat Plan Upgrade
16-641
250,000
137
448-5461-538-64.90
IT-VoIP Phone System
16-644
50,000
139
448-5461-536-65.98
Lake Ida Area
15,167
448-5461-538-31.30/xx.xx
Lake Ida Drainage Study
13-072
385
445,000
291
448-5461-538-xx.xx
Lakeview Drainage Impr
16-513
25,000
100,000 359
448-5461-538-31.30
Lewis Cove Rd Drainage
14-065
19,600
448-5461-538-46.47
LLWD L-33 Culvert
15-063
25,500
100,000
361
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 448 - STORM WATER FUND
FY 2016-2020
FINAL
9/4/2015
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
448-5461-538-xx.xx
Misc Storm Improvements
16-525
15,000
15,000
15,000
15,000
15,000
363
448-5461-538-68.84
NE list Av Improv
12-042
3,326
448-5461-538-68.78
448-5461-538-68.78
448-5461-538-xx.xx
CRA -NE 2 Ave/Seacrest Beaut.
NE 2 Ave/Seacrest PH2
NE 2 Ave/Seacrest PH3
11-067
14-071
16-646
30,000
50,000
76,000
100,000
141
143
448-5461-538-xx.xx
NE 2 Ave/Seacrest PH4
16-647
250,000
75,000
145
448-5461-538-68.72
CRA -NE 3rd St Street Scape
11-024
125,000
89
448-5461-538-63.90
NE 7th Av Alley
15-035
92,000
448-5461-538-64.15
New Financial System
12-012
5,201
448-5461-538-68.60
CRA -NW 12th Ave-Atlantic/MLK
2010-041
26,898
227,380
91
448 -5400 -Multi
Operating Expenses
1,104,372
1,053,820
957,220
957,220
957,220
957,220
448-5461-538-65.85
Osceola Alleys Phase 2
13-015
162,664
448-5461-538-xx.xx
Osceola Neigh Imp FY 16
16-649
50,000
95
448-5461-538-63.90
Other Improvements
12,585
448-5461-538-xx.xx
Palm Trail South Drainage
16-505
75,000
365
448-5461-538-99.01
Project Reserve
2,450
4,880
79,880
103,380
448-5461-538-xx.xx
Pump Sta Rehab
16-624
125,000
140,000
140,000
175,000
170,000
367
448-5461-538-xx.xx
Reclaimed Water, Area 12B
12-009
75,000
263
448-5461-538-xx.xx
Reclaimed Water, Area 12C
16-547
200,000
265
448-5461-538-68.30
CRA -SE 2 St- Swinton -SE 3 Av
13-020
225,000
107
448-5461-538-69.25
CRA -SE 4th Av Beautification
15-011
30,000
200,000
109
448-5461-538-xx.xx
Seawall Repairs
16-503
40,000
100,000
369
448-5461-536-31.90
Storm Water Modifications
13-077
3,536
448-5461-538-68.18
Storm Wtr Pmp Stat. Rehab
67,910
448-5461-538-xx.xx
CRA -SW 1 Av-SW 1 St to Atl Av
16-582
50,000
111
448-5461-538-68.95
SW 10th/9th Ave Improv
14-023
47,030
448-5461-538-68.94
SW 2nd Terr
14-024
52,355
448-5461-538-68.86
Swinton & Atlantic Inters
12-051
62,000
73,000
100,000
123
448-5461-538-xx.xx
Thomas Pump Ste Upgrade
16-605
100,000
65,000
371
448-5411-581-91.01
ITransfer to General fd/Adm Share/In-lieu
TOTAL EXPENDITURES
368,480
3,552,933
629,400
:90
629,400
2,602,6202,216,500
629,400
629,400
2,216,500
629,400
2,300,000
YEAR END BALANCE
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 448 - STORM WATER FUND
FY 2016-2020
FINAL
9/4/2015
ACCOUNT NUMBER I ACCOUNT NAME I I FY 14/15 1 FY 15/16 1 FY 16/17 1 FY 17/18 1 FY 18/19 1FY 19/20
PROJECT NAME I Proj# I FY 14/15 1 FY 15/16 1 FY 16/17 1 FY 17/18 1 FY 18/19 1 FY 19/20
NE 8th Ave Paving
13-060
75,000 195
LIDR Mapping Updates
16-625
100,000
373
NE 6th Ave Alley Imp
16-529
300,000
375
Rainberry Woods Drainage
16-506
45,000 255,000
377
Storm Sewer Cleaning
16-517
50,000 50,000
50,000 50,000 50,000 379
ZederAv
16-674 1
50,000 1 259
1 U 1 AL UNFUNULU YKUJtU 1 J 1 - 47 �, UUU 3U -n,000 .iu,000 1/D,000 7U,000
CITY OF DELRAY BEACH CAPITAL IMPROVEMENTS
FUND 501 - CITY GARAGE FUND
FY 2016-2020
SOURCES OF FUNDS:
FINAL
9/4/2015
ACCOUNT NUMBER
ACCOUNT NAME
FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20
501-0000-369-06.00
Vehicle Rental Fees
2,043,330
2,091,190
2,252,775
2,375,415
2,503,687
2,637,859
501-0000-301-50.00
Prior Year Project Reserve
864,765
63,337
150,052
514,439
501-0000-303-50.00
Prior Year Encumbrances
411,368
125,000
381
501-0000-365-10.xx
Sales Scrap
3,000
10,000
10,000
10,000
10,000
10,000
501-0000-361-10.00
Interest Earnings
6,000
6,000
6,000
6,000
6,000
6,000
501-0000-364-xx.xx
Proceeds -Sale of Surplus Property
75,000
85,000
95,000
105,000
115,000
125,000
501-3312-591-64.25
•
272,417
•i
2,363,775
2,559,752
2,784,739
3,293,298
ACCOUNT NUMBER
PROJECT NAME
PROJ# FY 14/15
FY 15/16
FY 16/17
FY 17/18
FY 18/19
FY 19/20 Pg No.
501-3312-591-46.xx
Repair and Maintenance
23,670
501-3312-591-64.25
Street Sweeper
222,605
501-3312-591-64.25
Street Light Bucket Truck
16-501
125,000
381
501-3312-591-64.25
Parks Trash Compactor Truck
16-502
95,000
383
501-3312-591-64.25
Fire Dept -Brush Truck
303,800
501-3312-591-64.25
Fire Dept -Horten Ambulance
322,300
501-3312-591-64.25
Fire Dept -Horten Ambulance
272,417
501-3312-591-64.25
Fire Dept- Fire Engine FY 14-15
604,700
501-3312-591-64.25
Fire Dept -Aerial Apparatus FY 14-15
750,000
501-3312-591-64.25
Fire Dept -Fire Engine FY 16-20
625,000
641,500
660,800
690,800
501-3312-591-64.25
ALS Rescue Repl. FY 16-20
295,000
333,600
343,900
354,500
365,500
501-3312-591-64.25
Dump Truck 772
115,000
501-3312-591-64.25
Dump Truck 442
115,000
501-3312-591-64.20
Vehicle Replacement- FY 16-20
997,088
950,000
946,538
1,100,000
1,150,000
1,250,000
501-3312-591-64.21
Vehicle Restoration - FY 16-20
75,000
75,000
75,000
75,000
75,000
75,000
501-3311-591-99.01
Project Reserve
TOTAL EXPENDITURES
135,683
3,403,463
27,1901
2,192,190
63,3371
2,363,775
150,0521
2,559,752
514,4391
2,784,739
1,602,798
3,293,298
YEAR END BALANCE
ACCOUNT NUMBER ACCOUNT NAME FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 18/19 FY 19/20
501-3312-591-64.25 Fire Dept -Aerial Apparatus FY 16-20 825,000
501-3312-591-64.25 PD 15 Seat Passenger Van 30,000 385
501-3312-591-64.25 PD Water Vessel - 28' Contender 109,500 389
501-3312-591-64.25 Tactical Obs. Platform 16-568 73,0001 391
Note: FY2014/15 Fire Engine and Aerial Apparatus Replacements Deferred
FY2015/16 Replacing 200130, 200531
FY2016/17 Replacing 200734, 200564, 9192
FY2017/18 Replacing 200735, 200766
FY2018/19 Replacing 200350, 200865
FY2019/20 Replacing 200832, 200864