09-08-15 Workshop Meeting AgendaCITY COMMISSION
CITY OF DELRAY BEACH, FLORIDA
WORKSHOP MEETING - TUESDAY, SEPTEMBER 8, 2015
6:00 P.M. DELRAY BEACH CITY HALL
The City will furnish appropriate auxiliary aids and services where necessary to afford an individual with a disability an
equal opportunity to participate in and enjoy the benefits of a service, program, or activity conducted by the City.
Contact the City Manager at 243-7010, 24 hours prior to the program or activity in order for the City to reasonably
accommodate your request. Adaptive listening devices are available for meetings in the Commission Chambers.
WORKSHOP AGENDA
1. Public Comments
2. Community Redevelopment Agency (CRA) FY 2015-2016 Work Plan and Budget
3. Accepting 2 -Sections of Atlantic Avenue from Florida Department of Transportation
(FDOT)
4. Commission Comments
Please be advised that if a person decides to appeal any decision made by the City Commission with respect to any
matter considered at this meeting, such person will need to ensure that a verbatim record includes the testimony and
evidence upon which the appeal is based. The City neither provides nor prepares such record.
MEMORANDUM
TO: Mayor and City Commissioners
FROM:
DATE: August 27, 2015
SUBJECT: AGENDA ITEM WS.1- WORKSHOP MEETING OF SEPTEMBER 8, 2015
PUBLIC COMMENTS
MEMORANDUM
TO: Mayor and City Commissioners
FROM: Donald B. Cooper, City Manager
DATE: August 27, 2015
SUBJECT: AGENDA ITEM WS.2. - WORKSHOP MEETING OF SEPTEMBER 8, 2015
COMMUNITY REDEVELOPMENT AGENCY (CRA) FY 2015-2016 WORK PLAN AND
BUDGET
BACKGROUND
Mr. Jeff Costello, Executive Director, Community Redevelopment Agency (CRA), will conduct a
presentation regarding the CRA FY 2015-2016 Work Plan and Budget.
TO: MAYOR AND CITY COMMISSIONERS
CITY MANAGER
FROM: JEFFREY A. COSTELLO, CRA EXECUTIVE DIRECTOR
RE: FY 2015-16 PROPOSED CRA BUDGET & WORK PLAN
DATE: AUGUST 31, 2015
Attached is the proposed CRA Budget and associated Work Plan for FY 2015-16. The
Work Plan provides a description of the major projects and initiatives that will be
addressed during the fiscal year (October 1, 2015 through September 30, 2016). Staff
will make a presentation reviewing the Budget and various projects included in the Work
Plan. Adoption of the CRA budget is scheduled for the September 24, 2015 CRA Board
meeting.
Delray Beach CRA
DRAFT Work Plan — FY 2015/16
INTRODUCTION
Overall redevelopment strategies of both the CRA and the City are embodied within the projects
and programs undertaken by the CRA, which are outlined in the adopted Community
Redevelopment Plan. These projects and programs are designed to solve underlying problems
which have a blighting influence on the Community Redevelopment Area, satisfy basic needs of the
populace and/or take advantage of opportunities for economic, social or aesthetic improvement.
This Work Plan is provided in conjunction with the CRA board's adoption of the budget for Fiscal
Year 2015/16, and provides a description of the major projects and initiatives that are to be
addressed in the next twelve months (October 1, 2015 through September 30, 2016). The four digit
number in the project title corresponds with the General Ledger (GL) number in the CRA budget.
AREA WIDE AND NEIGHBORHOOD PLANS—Includes projects that are the result of an adopted
redevelopment plan, neighborhood plan, or community visioning exercise.
5100 West Atlantic Avenue Redevelopment Plan
The West Atlantic Avenue Redevelopment Plan, adopted in 1995, calls for the elimination of
blighted conditions along West Atlantic Avenue and adjacent side streets and the acquisition of land
in order to aggregate sites sufficiently large enough to encourage redevelopment (first block north
and south of W. Atlantic Avenue). The Downtown Delray Beach Master Plan adopted in 2002,
incorporated the provisions of the West Atlantic Plan and re -confirmed the community's vision for
the area. Similarly, the 2012 Needs Assessment conducted by WARC identified the types of
businesses and development that the surrounding community is seeking for this corridor.
5110 West Atlantic Redevelopment Plan Update CRA Funding: $125,000
The West Atlantic Redevelopment Plan was adopted in 1995, with the most recent Plan
Amendment occurring in 2001. Conduct an assessment of the plan including community's needs,
market demands, redevelopment opportunities, and development trends to determine what
additional measures should be taken to promote new development. This may incorporated into
updates to the Downtown Master Plan & Southwest Area Neighborhood Redevelopment Plan.
5115 Land Acquisition CRA Funding: $1,600,000
A major component of the Redevelopment Plan is site acquisition, assembly and resale for
redevelopment. The Plan states the CRA may also acquire property for construction of centralized
parking facilities to service the surrounding areas; the parking lots constructed under this program
may be municipal lots entirely for public use, may be sold or leased to private entities or may be a
1
combination of both. Appendix "D" of the Community Redevelopment Plan contains the Land
Acquisition Maps for the overall area, and maps of specific blocks that were identified as priorities
for redevelopment purposes. Priority properties are those that will facilitate the assembly of larger
redevelopment sites (1+ acres), such as the following:
• SW 9th Ave. — (WAA between SW 91h and SW 10th Avenues)
2.5+ acre CRA -owned site. Project involves
the development of a moderately -priced
hotel, which was completed in February 2015.
The 1.67 acre hotel site is currently under
lease. Properties at the south end of block
were developed by the CRA as public parking
with a pocket park for surrounding 40
community. Additional parcels within the 4**
block may be added to these sites if available
for purchase.
• 600 Block — mixed use (WAA between NW 6th and NW 7th Avenues)
Combination of CRA and privately owned
parcels. Project involves the continued
assembly of parcels within the block for
redevelopment that is consistent with the
goals of the WAA Plan and DTM Plan. May be
accomplished through an equity partnership
among property owners or by issuance of an
RFP.
• SW 7th Avenue (WAA between SW 6th a
Combination of CRA and privately owned
parcels. Project involves the continued
assembly of parcels within the block for
redevelopment that is consistent with the
goals of the WAA Plan and DTM Plan. Priority
for mixed use to provide neighborhood retail
& services and employment opportunities for
surrounding community. CRA has entered
into agreement with developer for the CRA -
owned parcels (approximately 6 acres) in this
area. A mixed use (retail, office, residential)
project, known as Uptown Atlantic, is
planned with construction anticipated to
commence by early 2016.
N.W.
I^. T
GRA CRA.
CRA
_ r
CRA
Y FIRS
ST.4 TI CJ
O`
NO. 7
W E T A T I A N_ i C
id SW 9"' Avenues
2
WEST ATLANTIC AVE.
* *I.g� * CRA
U U U U U
..
CRAa CRA CRA
ACRA cwa� CRA
CRA B CRA CRA
CRA CRA
C CRA GRA CRA
d CRA CRA
J �
CRA E F
F
CRA G:
CRA H
1ST
S.W.
Uj
a
�ml
■
■
■
• 600 Block — mixed use (WAA between NW 6th and NW 7th Avenues)
Combination of CRA and privately owned
parcels. Project involves the continued
assembly of parcels within the block for
redevelopment that is consistent with the
goals of the WAA Plan and DTM Plan. May be
accomplished through an equity partnership
among property owners or by issuance of an
RFP.
• SW 7th Avenue (WAA between SW 6th a
Combination of CRA and privately owned
parcels. Project involves the continued
assembly of parcels within the block for
redevelopment that is consistent with the
goals of the WAA Plan and DTM Plan. Priority
for mixed use to provide neighborhood retail
& services and employment opportunities for
surrounding community. CRA has entered
into agreement with developer for the CRA -
owned parcels (approximately 6 acres) in this
area. A mixed use (retail, office, residential)
project, known as Uptown Atlantic, is
planned with construction anticipated to
commence by early 2016.
N.W.
I^. T
GRA CRA.
CRA
_ r
CRA
Y FIRS
ST.4 TI CJ
O`
NO. 7
W E T A T I A N_ i C
id SW 9"' Avenues
2
WEST ATLANTIC AVE.
* *I.g� * CRA
U U U U U
..
CRAa CRA CRA
ACRA cwa� CRA
CRA B CRA CRA
CRA CRA
C CRA GRA CRA
d CRA CRA
J �
CRA E F
F
CRA G:
CRA H
1ST
S.W.
Uj
a
�ml
• 700-1000 Blocks (WAA between NW 7th and NW 11TH Avenues)
Combination of CRA and privately owned
parcels. Project involves the continued assembly
of parcels within the block for redevelopment
that is consistent with the goals of the WAA Plan
and DTM Plan. May be accomplished through
an equity partnership among property owners
or by issuance of an RFP. Includes the former
gas station acquired by CRA, which is
undergoing a State approved environmental
clean-up.
• 1100 Block (WAA between SW 11th and 12th Avenues)
Combination of CRA and privately owned parcels.
Project involves the continued assembly of parcels
within the block for redevelopment that is
consistent with the goals of the WAA Plan and
DTM Plan. May be accomplished through an
equity partnership among property owners and
the CRA or by issuance of an RFP.
V*
5122 SW 10th/9th Avenue Improvements CRA funding: $200,000
As part of the redevelopment of this block with the hotel at the north end and the public parking
lot/pocket park at the south end, pedestrian linkages and on -street parking will be installed. The
portions of the improvements adjacent to Reverend JWH Thomas, Jr. Park and the hotel have been
completed --the remaining sections will be funded by the CRA and City. Funding in FY 15/16 will
cover construction costs.
5123 Block 8 Alley CRA funding: $120,000
South Side West Atlantic Avenue between SW 10th and 11th Avenues
Construction of unimproved alley currently being utilized for access, loading and trash service.
Funding this FY will cover construction costs.
5130 NW 12th Avenue Beautification
West Atlantic Avenue to MLK Jr. Drive
CRA funding: $700,000
The 2002 Downtown Master Plan called for the creation of a "secondary circulation system" along
the 2nd Streets (both north and south) and called for those corridors to be improved and
landscaped. The beautification of NW 2nd Street (MLK Jr. Drive) was completed in 2011 from NE 1St
3
"19
111136-M ores
r p
�rem
®�
Wr
Kom 0 "0
V*
5122 SW 10th/9th Avenue Improvements CRA funding: $200,000
As part of the redevelopment of this block with the hotel at the north end and the public parking
lot/pocket park at the south end, pedestrian linkages and on -street parking will be installed. The
portions of the improvements adjacent to Reverend JWH Thomas, Jr. Park and the hotel have been
completed --the remaining sections will be funded by the CRA and City. Funding in FY 15/16 will
cover construction costs.
5123 Block 8 Alley CRA funding: $120,000
South Side West Atlantic Avenue between SW 10th and 11th Avenues
Construction of unimproved alley currently being utilized for access, loading and trash service.
Funding this FY will cover construction costs.
5130 NW 12th Avenue Beautification
West Atlantic Avenue to MLK Jr. Drive
CRA funding: $700,000
The 2002 Downtown Master Plan called for the creation of a "secondary circulation system" along
the 2nd Streets (both north and south) and called for those corridors to be improved and
landscaped. The beautification of NW 2nd Street (MLK Jr. Drive) was completed in 2011 from NE 1St
3
Avenue to NW 12th Ave. This project involves the installation of drainage, sidewalks, landscaping,
and irrigation for this two block area connecting MLK Jr. Drive to W. Atlantic Avenue. The section of
NW 12th Avenue experiences significant traffic from drivers using MLK Jr. Drive as an alternative to
West Atlantic Avenue. The project also includes construction of the alleys within the first block, in
order to relocate front yard back -out parking areas from NW 12th Avenue to the rear where
possible. The City will be the lead agency and will also provide funding for the project. Funding will
cover the construction for the project in FY 15/16.
5132 SW 6", 7", 81h & 9th Avenue Improvements CRA funding: $200,000
As part of the redevelopment of this block with the proposed mixed-use development (Uptown
Atlantic) at the north end, pedestrian linkages and on -street parking will be installed, where
possible. The portions of the improvements adjacent to the mixed—use development hotel will be
funded by the developer -- the remaining sections will be funded by the CRA and City. Funding in FY
15/16 will cover design and construction costs.
5200 Downtown Delray Beach Master Plan
The Downtown Delray Beach Master Plan, adopted in 2002, is the citizens' vision for the growth and
unification of downtown Delray Beach. It represents the ultimate growth and form of the
downtown area and the creation of a recognizable and seamless center for the city as a whole. The
Downtown Delray Beach Master Plan describes three separate "districts": the West Atlantic
Neighborhood, the Central Core, and the Beach District. The plan identifies objectives to improve
each of the areas, and outlines projects to accomplish those objectives.
5205 Fourth & Fifth (Old Library Site) Redevelopment CRA funding: $25,000
The former site of the Chamber of Commerce offices and public library is under contract for
redevelopment as a movie theater/office/retail complex. The existing dumpsters on the site are
used by businesses fronting East Atlantic Avenue, but will be eliminated with the redevelopment.
The CRA will work with the businesses to arrange for new waste receptacles for those businesses,
on their properties.
5210 SE 15Y Street (Conversion to 2 -Way) CRA funding: $250,000
Swinton Avenue to US 1
Consists of the conversion of NE and SE 1st Streets from 1 -way to 2 -way traffic to benefit both
commercial and residential development along these streets as well as traffic circulation in general.
Conversion of NE 1st Street from Swinton to NE 6th Avenue has been completed. Completion of
this project on SE 1St Street from SE 1St Avenue to SE 6th Avenue (Norhtbound Federal Hwy) was
completed last FY in conjunction with the Federal Highway Beautification project. The project
includes the installation of a mast arm traffic signal at the intersection of S. Swinton Avenue and
SE/SW 1St Street, restriping SE 1St Street from Swinton Avenue to SE 1St Avenue.
5215 East Atlantic Avenue Pedestrian Improvements (east of ICWW) CRA funding: $30,000
4
The Downtown Master Plan called for a median east of Gleason Street to A -1-A to enhance
pedestrian safety in this area. Area residents and property owners have expressed concerns about
the feasibility of a median at this location. Funding this year is to study the area and provide a
conceptual plan for improving pedestrian safety.
5225 Gateway Feature Signage CRA funding: $50,000
Design and installation of signage and other identification elements associated with the Gateway
Feature at West Atlantic Avenue and 1-95.
5230 Downtown Roundabout (Trolleys)
Tri -Rail station to Beach
CRA funding: $400,000
4&
The CRA currently shares in the cost of operating free trolleys that carry passengers from Tri -Rail to
the beach area. The trolleys are owned by the City and operated by a private vendor under a
contract with the City. Funds provided in FY 15/16 will be for operating expenses.
5235 Parking Management Plan Implementation CRA funding: $400,000
Funding to assist with the implementation of the recommendations identified in the 2010 Parking
Management Plan. Projects being considered for this year are pedestrian connections to parking
areas, pedestrian crosswalk upgrades, security cameras for parking garages, revenue collection
systems, and updated wayfinder signage throughout the district.
5251 NE 3rd Street/NE 3rd Avenue/Alley Improvements CRA funding: 1,000,000
East of Pineapple Grove Way, from NE 3rd Street to NE 4th Street
The Pineapple Grove Arts District
continues to transform; however
additional improvements are+
necessary in portions of the District,
especially the NE 3rd Avenue light
industrial area. The Pineapple Grove
Neighborhood Plan calls for
site
pedestrian -oriented development
and improvements, and additional
public parking. In 2010, the CRA _ completedthethe construction of a new�3ti!hs
parking lot on NE 3rd Avenue to
supplement parking for area
businesses and also acquired two properties: the warehouse building at 313 NE 3rd Street for
conversion to an Arts Center, and a blighted parking lot at 362 NE 3rd Avenue. The improvements to
the parking lot at 362 NE 3rd Avenue have been completed. The proposed streetscape
improvements along NE 3rd Street, NE 3rd Avenue and the alleyway will provide safe, well -lighted
5
pedestrian connections to the public parking areas and to area businesses. Funding in FY 13/14 was
for construction drawings with funding in FY 15/16 for construction of the improvements.
5253 Swinton & Atlantic Intersection CRA funding: $200,000
The Downtown Master Plan called for improvements to the intersection of Atlantic Avenue and
Swinton Avenue, to make the intersection more pedestrian and vehicle—friendly, and improve
connectivity between West and East Atlantic Avenue. Funding this FY is for design and construction
drawings.
5255 Block 117 Parking Garage CRA funding: $50,000
East side of SE 6th Avenue, south of E. Atlantic Avenue
The City -owned Gladiola Parking Lot is heavily utilized by patrons and employees of the surrounding
businesses. Therefore, in FY 2012/13, the CRA provided funding for a study that considered a variety
of concept plans for self -park and automated parking structures for the lot. The City Commission's
consensus was to provide a self -park parking garage with commercial space on the first floor. In FY
2014/15 the City Commission requested a parking demand analysis. Funding this year is to
of the design, with construction to occur in FY 2016/17.
5276 MLK Jr. Drive (NW 2nd St) — Phase II
1-95 sound wall to NW 12th Avenue
Funding in FY 2015/16 is for completion
CRA funding: $320,000
The 2002 Downtown Master Plan called for the creation of a "secondary circulation system" along
the 2nd Streets (both east and west) and called for those corridors to be improved and landscaped.
Beautification of the corridor between NE 1st Avenue and NW 12th Avenue completed in 2011
(Phase 1), included landscape nodes, irrigation, paver brick crosswalks at major intersections,
lighting, two pocket parks. The project also involves features commemorating Dr. Martin Luther
King, Jr. Phase 11 includes landscape nodes, sidewalks, and an art feature at the 1-95 sound barrier
wall. Funding in FY 2014/15 was for design with construction to occur in FY 2015/16.
P -
r1
1ncuur aucx Kenley +Hc'n
U,11
a I
0
5278 SE 4t" Avenue Beautification CRA funding: $600,000
E. Atlantic Avenue to SE 2nd Street
The Downtown Master Plan calls for the creation of a pedestrian -friendly network of streets with
adequate sidewalks and lighting, and encourages improvements to the side streets to encourage
businesses and pedestrian activity along these streets. Improvements have been made along
NW/SW 5th Avenues, Pineapple Grove Way and NE 4th Avenue. Improvements to the Federal
Highway pairs are under construction. Improvements to other side streets have occurred in
conjunction with redevelopment projects (i.e Atlantic Grove, Worthing Place). The proposed
improvements to SE 4th Avenue will complement the streetscape improvements proposed with the
proposed iPic theater and Uptown Delray projects. Funding in FY 2014/15 was for design and
construction drawings with construction to occur in FY 15/16.
5201 Delray Beach Center for the Arts CRA funding: $1,200,000
The Delray Beach Center for the Arts (formerly Old School Square Cultural Arts Center) was the
catalyst in the redevelopment of Downtown Delray when it opened its doors in 1990 and have since
been the cultural anchor for the City. In 2000, a community charrette was held to determine the
future of the facility. In March 2015, the CRA engaged Redevelopment Management Associates
(RMA) to facilitate a visioning public engagement meeting to provide public input for the exterior
uses of the Delray Beach Center for the Arts campus. The Charrette was held on March 21, 2015
with 78 citizen stakeholders in attendance. On April 28, 2015, a follow-up community meeting was
conducted and the charrette reports and conceptual plan were presented to the CRA Board on April
23, 2015 and to City Commission on June 2, 2015. On June 28, 2015, the CRA issued a RFQ for
professional consulting services. The scope of work will include consensus building, programming,
design, bidding, permitting, and construction administration services with public input in all phases
of the project. Funding for the project design is $200,000 with the remaining $1,000,000 allocated
for construction (possibly Phase 1) which is anticipated to occur in FY 15/16.
5202 Delray Beach Center for the Arts - Building Maintenance CRA funding: $300,000
Funding is for the deferred maintenance of the buildings on the Delray Beach Center for the Arts
complex. Request for Bids will be completed this year and renovations will occur in FY15/16.
5242 Veterans Park CRA funding: $200,000
With the various development approvals in 2009 for the redevelopment of the two blocks just west
of Veteran's Park (including Atlantic Plaza site), the need to upgrade the park was identified. In
2010, the City procured the services of AECOM consultants to prepare a conceptual master plan.
The plan involved a design charrette, and numerous meetings with the community and
stakeholders, including interviews. The proposed master plan for Veterans Park creates a vision for
the future park and addresses design objectives improvements to be implemented in three phases.
Funding in FY 15/16 is for design services.
7
5300 - Southwest Neighborhood Plan
When the MacArthur Foundation agreed to provide funding for preparation of the Downtown
Delray Beach Master Plan, they also included funding for a plan to address the most distressed
neighborhood adjacent to the West Atlantic commercial corridor: the Southwest Neighborhood.
This area had long been characterized by slum and blighted conditions, including inadequate
infrastructure, high crime, poor housing conditions aggravated by absentee ownership, and a large
number of vacant properties that were not being maintained. The plan was adopted in May of 2003
and provides a blueprint for the revitalization and stabilization of the neighborhoods located in the
southwest area, including the provision of pocket parks, streetscape beautification, and affordable
housing initiatives. It links the neighborhood residential areas, commercial centers, civic functions,
and green spaces to create a vibrant, pedestrian friendly network of connected neighborhoods.
5306 Village Square Elderly qW q CRA funding: $2,700,00
Loan associated with redevelopment of Carver Estates site — 84 units of senior housing.
5330 Block 32 Alley CRA funding: $100,000
One block area between SW 3rd & 4t" Streets, and SW 4t" & 5t" Avenues
The Southwest Neighborhood Plan calls for improvements to inadequate infrastructure. This
unimproved alley serves as the only access to existing homes and a vacant platted lot. In addition to
the CRA's funding, the City is providing project funding of $146,000 for this fiscal year for drainage
and utility service upgrades.
5340 SW 12th Avenue CRA funding: $200,000
Between West Atlantic Avenue and SW 3rd Street
The majority of this project was completed in 2012, and consisted of the installation of landscape
nodes, sidewalks, and drainage as well as the construction of north -south alleys within the middle of
the abutting blocks. Wherever possible, parking backing onto SW 12th Avenue was removed and
M
relocated to the rear backing onto the alleys. Areas where parking was removed were restored with
landscaping and irrigation. Continuation of the project will include acquisition of blighted structures
for renovation or demolition.
5341 SW 12th Avenue Duplex Renovations (221 SW 12th Avenue) CRA funding: $150,000
East side of SW 12th Avenue, between SW 2nd & 3rd Streets
In FY 2013/14 the CRA renovated 5 blighted duplexes located on the east side of SW 12th Avenue,
between SW 2nd and 3rd Streets (215, 219, 225, 229 & 233 SW 12th Avenue), which were acquired
by the CRA in 2011. In FY 2014/15, the CRA acquired the blighted duplex situated in the middle of
the recently renovated duplexes located at 223 SW 12th Avenue. The project consists of the interior
and exterior renovations to this blighted duplex as well as landscape upgrades. Construction
drawings were completed in FY 2014/15. Construction is scheduled for FY 2015/16. The units will
be used to provide affordable housing.
E
rjc�
-`1 P
SW 12TH AVE.
G
5345 SW 14th Avenue Beautification
Between SW 1st and SW 2nd Streets
CRA funding: $300,000
Beautification of the block is largely complete and included the installation of on -street parking,
sidewalks, drainage, landscape nodes, and north -south alleys within the middle of the abutting
blocks. The vacant lots have been developed by the Delray Beach Community Land Trust as single
family housing with vehicular access to the rear of the alleys. Continuation of the project includes
expansion of these stabilization and beautification efforts to the block between SW 2nd and 3rd
Streets. Funding in FY 2015/16 will primarily consist of acquisitions, where possible, and
construction drawings for the alley improvements.
5350 SW 2nd Street Beautification (Phase II)
CRA funding: $200,000
SW 2nd Street Beautification (Phase II). Phase I beautification was completed inn 2013 and did not
include resurfacing due to budget constraints. Phase 11 includes resurfacing.
5355 Merritt Park CRA funding: $450,000
Between SW 3rd and 4th Streets, and SW 2nd and 3rd Avenues
Merritt Park is located in the SW Neighborhood and
includes athletic fields, basketball courts, open areas,
playground and restrooms. The proposed improvements
include but are not limited to: replace sod on playing
surfaces, upgrade irrigation system, upgrade restrooms
and install additional parking. Construction drawings
were completed in FY 2014/15 with funding in FY
2015/16 is for construction.
10
5360 Block 63 Alley CRA funding: $100,000
Between SW 2nd & 3rd Streets, and S. Swinton & SW 1st Avenues
Construction of an unimproved alley within the Southwest Neighborhood, which is currently being
utilized by adjacent residents. Funding in FY 2015/16 was for construction drawings with funding
this FY for construction.
5400 North Federal Highway Redevelopment Plan
5412 Federal Highway Redevelopment Plan Redevelopment Plan Update CRA funding: $50,000
North of George Bush Blvd. to North City Limits
The North Federal Highway Redevelopment Plan was adopted by the City Commission in March
1999. At that time the corridor had been in a serious state of decline and was characterized by
numerous vacant, blighted properties including a crime -ridden trailer park, an abandoned car
dealership, a flea market, and several budget hotels. The purpose of the plan was to arrest the
decline, stabilize adjacent neighborhoods and promote a healthy mix of commercial and residential
development. Many elements of the plan were implemented including a Light Industrial overlay
zone in the area between Dixie and Federal Highways, changes to building setback requirements,
beautification of the La Hacienda neighborhood and construction of a new connecting road
between Dixie and Federal. Several blighted structures were demolished and several new
residential and commercial projects were constructed. However, with the economic downturn of
the late 2000's the area is again experiencing a decline in appearance and activity. It is appropriate
at this time to revisit the original plan and assess if additional measures can be taken to upgrade the
corridor and promote new development. -AR
5500 Osceola Park Neighborhood Plan
5510 Osceola Park Residential Area Improvements CRA funding: $175,000
The Osceola Park Redevelopment Plan calls for alley improvements in the residential areas where
appropriate. Design for the alley construction was completed in previous fiscal years; however some
residents opposed the alleys and the creation of an assessment district to fund the improvements.
In response to the resident's concerns, the City proceeded with the construction of the water and
sewer upgrades only. There has been renewed interest from the residents to implement the alley
improvement plans as well as traffic calming and pedestrian improvements. The CRA has provided
funding to construct several alleys each year. Funding this FY is for design drawings for alleys, traffic
calming and sidewalk improvements.
11
5520 Osceola Business Area Revitalization
SE 2nd Street/Avenue/Alleys/Parking Lot
The Osceola Park Redevelopment
Plan identifies the need for
additional parking for area
businesses, especially along SE 2nd
Avenue, between SE 2nd Street and
SE 4th Street, and east of the FEC
Railroad. Additional parking can be
accommodated through a
combination of streetscape
improvements with on -street
parking along SE 2nd Avenue,
property acquisition for parking, and
alley improvements, where
necessary. Many of the commercial
structures in the area are in need of
upgrades, and could possibly qualify for CRA grant programs. In FY 11/12, the CRA acquired a
property to construct a parking lot. Funding in FY 12/13 was provided for design consultant services.
Construction drawings were completed in FY 14/15. Funding in FY 15/16 is for construction.
CRA funding: $800,000
5650 Sidewalks CRA funding: $200,000
Completion of sidewalks and pedestrian links within the CRA District for greater pedestrian safety.
Priorities will be in line with City Commission's direction to provide connectivity to places of worship
and schools, as well as, other public facilities, as parks and business or employment centers.
5660 NW/SW Neighborhood Alleys CRA funding: $100,000
Construction of unimproved alleys to be determined within the Northwest or Southwest
Neighborhoods. Funding this FY will cover design costs.
5700 Seacrest/Del Ida Neighborhood Plan
The Seacrest/Del-Ida Park Neighborhood Plan was adopted by the City Commission in March of
1998. These neighborhoods were experiencing numerous problems with traffic, a mix of declining
multi -family and single family homes, proximity to the rail corridor and a lack of a unifying identity.
The plan called for a number of improvements including traffic calming measures, removal of
excessive back -out parking and installation of landscape nodes, conversion of several blighted
duplexes to single family homes, and buffering of the railroad with trees and shrubs. The majority
of the improvements were implemented by 2005. However, the section of Seacrest Blvd. from NE
4th St. to George Bush Blvd. was not included in the first phase of improvements and the residents
in the Del Ida Park area have asked the City to provide certain beautification elements to that four -
block area.
12
5710 NE 2nd Ave/Seacrest Blvd Beautification
Between NE 4th Street & George Bush
Boulevard
This project includes the conceptual design of
sidewalk, lighting and related improvements along
NE 2nd Avenue (Seacrest Blvd) between NE 4th
Street and George Bush Boulevard (four blocks). In
2011, CRA and City staff worked to obtain a grant
from the Metropolitan Planning Organization
(MPO) in the amount of $616,262 for construction
of the improvements. Funding in FY 12/13 was
provided for design consultant services.
Construction drawings were completed in FY
13/14. Funding in FY 15/16 is for construction.
CRA funding: $800,000
Project Area "�+I
REDEVELOPMENT PROJECTS—Includes projects which arise from more localized initiatives than
those addressed in broader Redevelopment Plans.
NW/SW 5t" Avenue Beautification
Lake Ida Road to SW 1st Street
In the days of segregation the SW/NW 5th Avenue area was a thriving commercial and institutional
corridor in the heart of the City's African American community. It declined in the 1970's and initial
redevelopment attempts were unsuccessful. The objective of this program is to revitalize the
corridor into a thriving district for neighborhood businesses and cultural activities. The CRA was the
primary funder of the street beautification between MLK Jr. Drive (NW 2nd St) and SW 1St Street that
was completed in 2007, and has funded improvements to numerous buildings and sites in this three
block area. Additional projects to be addressed in FY 15/16 include the following:
6203 NW 5t" Avenue Entrance Feature CRA funding: $100,000
Lake Ida Road & NW 5t" Avenue
At the intersection of Lake Ida Road and NW 5th Avenue is leftover right-of-way that is not
maintained. Funding this FY is for design and construction of an entrance feature.
6206 NW 5t" Avenue Beautification CRA funding: $400,000
Between MLK & Lake Ida Road
The commercially zoned sections of NW/SW 5th Avenue have been substantially improved between
SW 1s' Street and MLK Jr. Drive (NW 2nd St). This project includes expansion of stabilization and
13
beautification efforts to the residential blocks between MLK Jr. Drive and Lake Ida Road.
Improvements will include sidewalks, landscaping and similar beautification measures. The CRA will
also look to acquire blighted properties for upgrading or demolition as appropriate, or providing
funding to property owners for upgrades. Funding in FY 2014/15 included land acquisition and
construction drawings for the adjacent alleys. Funding in FY 2015/16 will primarily consist of
acquisitions, where possible, and construction of the alleys.
6213 Block 20 Alley Improvements CRA funding: $75,000
West of NW 5t" Avenue south of NW 1St Street
Improvements include construction of an alley within Block 20 to provide rear access for residential
and commercial uses within the block.
Affordable Housing 'a'
6555 Housing Study 4W 4 CRA funding: $50,000
During the public hearing regarding the 2014 CRA Plan Amendment, there were several suggestions
from the public related to the ongoing development of both market rate and affordable housing.
The most recent affordable housing needs assessment for the City was conducted in 2008 by the
Shimberg Center for Affordable Housing at the University of Florida. In order to properly address
these matters, the CRA will collaborate with the City to fund and complete a Housing Study. The
study should assess the current housing stock throughout the CRA District and CDBG target area,
including both rental and for -sale properties, and single-family as well as multifamily units. The
findings would be used to help determine demand, areas of focus, and development options, as
well as the roles of the various public, private, and nonprofit organizations that create housing
throughout the city.
6620 Carver Square Neighborhood CRA funding: $10,000
Carver Square is a two block residential subdivision bordered by SW 2nd Ct. to the north, SW 3rd
Street to the south, SW 7th Avenue to the east and SW 8th Avenue to the west. Due to its previous
uses as a pond and dump site, homes that were built on the property in the 1960's through 1980's
experienced severe settlement problems. The CRA acquired the properties, relocated the residents,
had the site designated as a brownfield and
completed a soil remediation/mitigation program.
In FY 11/12 the CRA received a $110,000 grant
from FDEP for additional testing and remediation.
Additional remediation and debris removal within
SW 2nd Terrace was completed in FY 12/13, and
additional tests were conducted in FY 13/14.
Depending upon the results of additional tests,
the lots may be ready for development in the
coming year. Funding in 15/16 is for housing
design/RFP.
14
6630 SW 2nd Terrace Reconstruction (Carver Square) CRA funding: $65,000
As a result of the necessary remediation and removal of debris within the SW 2nd Terrace right-of-
way, SW 2nd Terrace must be reconstructed. Funding in FY 13/14 was for design services with
associated with reconstruction of the street to accommodate redevelopment of the existing platted
lots. Funding in FY 14/15 is for construction.
ECONOMIC DEVELOPMENT INITIATIVES — Includes projects intended specifically to stimulate
economic activity and create jobs. A primary focus is on the establishment of office uses to augment
the retail, restaurant and residential uses that are in place. Arts -related uses will also be pursued
for their long term economic development value. The ultimate goal of the program is to complete a
sustainable, successful downtown, where both businesses and residents support a continually
increasing tax base, and provide a complete range of services needed by the community.
7440 Arts Warehouse CRA funding: $2,800,000
313 N.E. 3rd Street
The CRA purchased a 15,000 +/- sq. ft. vacant warehouse in the Pineapple Grove district for
conversion to an arts related use such as an arts center/incubator. The purpose of this project is to
encourage visitors and pedestrian activity in the Pineapple Grove area and to enhance Delray's
image as an arts oriented community. In FY 13/14 the CRA Board selected an architect for design
services. Construction drawings were completed in FY 2014/15 with funding in FY 2015/16 for
construction.
OTHER
8606 SE/NE 5t'4" (US 1 Corridor) Beautification Project CRA financing payment: $420,149
SE 10th Street to George Bush Blvd.
Traffic calming and beautification project includes removal of one lane of traffic in each direction
and installation of landscape nodes and bicycle lanes along the entire corridor. Wider sidewalks to
be installed from NE 1st to SE 1st St. and paver brick sidewalks from SE 2nd to NE 2nd St. Funding is
a combination of Federal, State, City and CRA funds. Total project cost approximately $12.5 million.
City to finance approximately $3.7 million to fill funding gap. CRA is to provide funds to repay a
portion of that financing, up to a maximum of $3,614,188.07 plus interest. Project is currently under
construction. CRA funding for this FY is based on a schedule of payments provided by the City's
Finance Department.
15
- - DELF.Y BEACH CR
COMMUNITY REDEVELOPMENT l:.f':: ',
DRAFT
PROPOSED
Budget
FY 15-16
CRA Delray Beach
Y
Proposed Budget FY 2015-16
NOTES
Revenue from Activities
4000 • TAX INCREMENT FINANCING (TIF)
4005 TIF - City of Delray Beach
8,814,103
Proposed millage rate 7.0611
4010 TIF - County
5,968,565
Proposed millage rate 4.7815
Total 4000 • TAX INCREMENT FINANCING (TIF)
14,782,668
4050 • CRA ADMINISTRATION SOURCES
4060 Land Sales
3,800,000
Sale of Old Library Site/Chamber & 203 NW 5th Ave
4216 Green Market Booth & Other
65,000
4240 Property Revenue (Rents)
76,000
4500 General Fund Carry forward
8,091,924
xxxx• LOC (to be established)
2,228,210
4700 - Reimbursement - City
120,000
Economic Development positions -shared expenses
4800 • Loans Receivable Interest
63,000
Chamber, DBCLT & Fairfield Inn loans
4900 • Interest Earned
15,000
Total 4050 • CRA ADMINISTRATION SOURCES
14,459,134
Total Revenue from Activities
29,241,802
Expenditures for Activities
5001 • AREAWIDE & NEIGHBORHOOD PLANS
5110 West Atlantic Redevelopment Plan
125,000
5115 Land Acquisition
1,600,000
Acquire/improvement of blighted property
5120 • Project Develop/ Implementation
25,000
5122 - SW 10/9th Ave Improvements (CIP)
200,000
Pedestrian linkages & on -street parking
5123 - Block 8 Alley (CIP)
120,000
Construction of alleys
5130 • NW 12th Ave- Atlantic to MILK (CIP)
700,000
Beautification of 2 block area, including alleys
5132 - SW 6th, 7th, 8th, & 9th Ave (CIP)
200,000
Pedestrian linkages
5140 • Legal Fees -W. Atlantic Redevelop
50,000
Total 5100 • West Atlantic Redevelop
3,020,000
5200 • DOWNTOWN- DB -MASTER PLAN
-
5201 - DBCFA Facility (CIP)
1,200,000
Phase 1 construction
5202 - DBCFA Building Maintenance (CIP)
300,000
Deferred maintenance
5205 - Old Library Site Redevelopment
25,000
Dumpsters for area business - will be eliminated with redevelopment
5210 • SE 1st Street 2 way conversion (CIP)
250,000
Conversion to 2 way traffic between US1 and Swinton w/ traffic signal
5215 - E Atlantic Ave Pedestrian Improvements (CIP)
30,000
Analysis and design
5225 • Gateway Feature (Signage)
50,000
Design and installation of signage & markers
5230 • Downtown Trolley
400,000
Continued operation of downtown trolley
5235 • Parking Management Projects (CIP)
400,000
Funding to assist implementation of 2010 Parking Master Plan
5239 - Project Develop / Implementation
20,000
5242 - Veterans Park
200,000
Phasel playground
5251 - NE 3rd St/Ave Alley Improvements (CIP)
1,000,000
Construction drawings & improvements
5253 - Swinton & Atlantic Intersection (CIP)
200,000
Design and construction
5255 - Downtown Core Parking Analysis (CIP)
50,000
Update parking utilization section
5276 • MILK Jr. Drive Phase II (CIP)
320,000
Landscape nodes, sidewalks and art feature
5278 • SE 4th Avenue Beautification (CIP)
600,000
Design and construction drawings
5295 • Legal Fees -DB Master Plan
10,000
Total 5200 • DOWNTOWN- DB -MASTER PLAN
5,055,000
5300 • SW Neighborhood Plan
5306 - Village Square Elderly Loan
2,700,000
Construction loan- Village Square Elderly Apartments
5325 • Project Develop/Implementation
5,000
5330 - Block 32 Alley (CIP)
100,000
Construction of alley - SW neighborhood
5340 • SW 12th Avenue
200,000
Acquire/improvement of blighted property
5341 • SW 12th Ave Duplex
150,000
5345 • SW 14th Avenue
300,000
Acquire/improvement of blighted property
5350 • SW 2th Street Beautification (CIP)
200,000
5355 - Merritt Park (CIP)
450,0001
Upgrades to park and install additional parking
- - DELF.Y BEACH CR
COMMUNITY REDEVELOPMENT A(":: '.
DRAFT
PROPOSED
Budget
FY 15-16
CRA Delray Beach
Y
Proposed Budget FY 2015-16
NOTES
5360 - Block 63 Alley (CIP)
100,000
5395 • Legal Fees -SW Neighborhood Plan
40,000
Total 5300 • SW Neighborhood Plan
4,245,000
5400 • N. Federal Highway Area
5412 - Federal Highway Plan Update
50,000
5495 - Legal Fees N Fed Hwy Redv
1,000
Total 5400 • N. Federal Highway Area
51,000
5500 • Osceola Park Neighborhood Plan
5510 • Alleys (CIP)
175,000
Construction of 3 alleys
5520 - Business Area Revitalization (CIP)
800,000
Construction of parking, streetscape, on -street parking and alley improve
5595- Legal Fee - Osceola Plan
3,000
Total 5500 Osceola Neighborhood Plan
978,000
5600 • OTHER
-
5610 • Land Acquisition - Other
200,000
Acquire/improvement of blighted property
5640 - Neighborhood Enhancement
2,500
Identification signs
5650 - Sidewalks - Other (CIP)
200,000
Includes pedestrian improvements at rail road crossings
5660 - NW/SW Neighborhood Alley (CIP)
100,000
Design and construction
5685 • Misc. Pre -Development Costs -Other
5,000
5695 • Legal Fees -Other
2,500
Total 5600 • OTHER
510,000
5700 • Seacrest/ Del Ida Neighborhood Plan
-
5710 • NE 2nd Ave/Seacrest Blvd. Beautif. (CIP)
800,000
Streetscape improvements
Total 5700 • Seacrest/Del Ida Neighborhood Plan
800,000
Total 5001 • AREAWIDE & NEIGHBORHOOD PLANS
14,659,000
6000 • REDEVELOPMENT PROJECTS
6200 • NW/SW-5th Ave Beautification
-
6203 • NW 5th Avenue Entrance Feature
100,000
Design and construction of entry feature at Lake Ida Rd and NW 5th Ave
6206 • NW 5th Avenue (CIP)
400,000
Acquire/improvement of blighted property
6213 - Block 20 Alley Improvements (CIP)
75,000
Construction of an alley within Block 20
6214 • Project Development
5,000
6215 • Legal Fee-NW/SW 5th Ave -Beautification
10,000
Total 6200 • NW/SW-5th Ave Beautification
590,000
6300 • Redevelopment Sites
6303 • Maintenance
135,000
Properties under CRA ownership
6304 - Business Relocation
30,000
Related to property acquisition
6305 - Project Develop/Implementation
2,500
6310 -Property Insurance
100,000
6315 - Property Taxes
75,000
6320 - Utilities
20,000
6330 - Block 60 Parking Lots
8,000
Block 60 condo fees - parking lot behind CRA office
6350 - West Settlers Condo Association
14,000
West Settlers condo fees
6395 - Legal Fees
5,000
Total 6300 • Redevelopment Sites
389,500
6500 • Affordable/Workforce Housing Program
-
6505 • Resident Relocations
15,000
6506 - Subsidies
150,000
Subsidies to assist buyers of affordable housing
6513 • Land Acquisitions- Affordable Housing
300,000
6535 - A -Guide Funding - DBCLT
6555 • Housing Study
175,000
50,000
A -GUIDE funding to support Delray Beach CLT
Collaborate with City to determine needs for area
6595 • Legal Fees -Afford Housing
10,000
Total 6500 • Affordable/Workforce Housing
700,000
6600 • Carver Square Neighborhood
-
6600 - Carver Square Neighborhood
10,000
6630 - SW 2nd Terrace Reconstruction (CIP)
65,000
Street reconstruction
6650 • Legal Fees -Carver Square
6,000
Total 6600 • Carver Square Neighborhood
81,000
- - DELA' Y BEACH CR
COMMUNITY REDEVELOPMENT A(":: '.
DRAFT
PROPOSED
Budget
FY 15-16
CRA Delray Beach
Y
Proposed Budget FY 2015-16
NOTES
Total 6000 • REDEVELOPMENT PROJECTS
1,760,500
7000 • COMMUNITY IMP & ECONOMIC DEVELOP
7300 • Grant Programs
7305 - Curb Appeal Assistance Grant
35,000
7306 • Site Assistance Grant
339,490
7307 • Business Assistance Startup
40,000
7308 • Paint -Up Assistance Grants
27,275
7310 • Community Activities
3,000
7312 • Historic Facade Grants
75,000
Total 7300 - Grant Programs
484,765
7320 • Downtown Marketing & Promo
7321 - DBMC
351,510
Support downtown marketing and events
Total 7320 • Downtown Marketing & Promo
351,510
7330 • City Contractual Services
7331 - Planning, IT, and Parking Manager
110,000
Interlocal Agreement (ILA)
7333 • Housing Rehab
38,470
ILA
7335 • Clean & Safe
2,324,280
ILA
7336 • Streetscape Maintenance
60,000
ILA
7337 • Project Engineer
97,557
ILA
7338 • Neighborhood Planner/Resource Ctr
41,060
ILA
Total 7330 • City Contractual Services
2,671,367
7375 • Community Resource Enhancement
7375 - Community Resource Enhancement
25,000
WARC staffing assistance
7376 • A -GUIDE Funding
1,225,200
A -GUIDE funding
7375 - Community Resource Enhancement
1,250,200
7380 • Green Market
7381 • Personnel & Staff -Green Market
87,400
Green Market Manager & seasonal part time help
7382 • Entertainment/Vendors
11,100
7383 • Supplies & Materials
3,495
7384 • Administration & Operations
13,500
Park rental, purchase of golf cart & equipment rentals
7385 • Signs/Banners/Ads-Green Market
12,500
Total 7380 • Green Market
127,995
7400 • ECONOMIC DEVELOPMENT INITIATIVES
7415 - Economic Development Incentives
100,000
Incentives and programs to attract new businesses
7416 - Micro -Lending Programming
100,000
Revolving loans/funds to assist small business
7425 - Economic Development Marketing
25,000
Promotion of programs, sites, plans, etc.
7440 - Warehouse / Arts Incubator
2,800,000
Construction drawings and beginning elements of the construction project
7470 - Tennis Tournament Sponsorship
550,000
Co -title sponsor along with City
7490 • Legal Fees
10,000
Total 7400 • Economic Development Initiative
3,585,000
Total 7000 • COMMUNITY IMP & ECONOMIC DEV
8,470,837
8000 • ADMINISTRATION
8010 • PERSONNEL ITEMS
8011 - Salaries & Wages
980,000
2.5% increase
8013 • Payroll Taxes
80,000
Medicare, social security, unemployment and workers comp
8014 • Travel Allowance
7,020
8015 - Ins-Health/Dental/Life
125,000
Health, dental, life and long term disability
8016 • Cell Allowance
7,000
8018 • Retirement Contributions
70,000
457 retirement plan
Total 8010 • PERSONNEL ITEMS
1,269,020
8100 • SUPPLIES & MATERIALS
8105 • Office Supplies
6,000
8109 • Postage/Express
2,500
Total 8100 • SUPPLIES & MATERIALS
8,500
8200 • EQUIPMENT/PROP/MAINTENANCE
8210 - Computer Equipment & Supplies
8211 • Equipment Rentals
4,700
Copier, postage meter Page 3 of 4
- - DELF.Y BEACH CR
COMMUNITY REDEVELOPMENT!'C:: '.
DRAFT
PROPOSED
Budget
FY 15-16
CRA Delray Beach
Y
Proposed Budget FY 2015-16
NOTES
8213 Repairs/Maintenance
1,000
8214 Furniture & Fixtures
1,000
8215 • Office Equipment (Assets)
15,500
Total 8200 • EQUIPMENT/PROP/MAINTENANCE
22,200
8300 • OFFICE SPACE
8305 • Storage
3,000
Warehouse for records storage
8307 • Maintenance
30,000
8309 • Telephones
6,500
8311 Utilities
5,500
8315 Security
2,000
Total 8300 • OFFICE SPACE
47,000
8400 • ADMINISTRATION/OPERATIONS
8401 • Accounting
24,000
8403 • Legal - Administration
50,000
8405 • Capital Outlay
400,000
Office expansion
8409 • Contractual Services
70,000
Annual Report, social media, web site upgrade and other
8411 • Printing
4,000
8413 • Publications/Subscriptions
1,000
8415 • Advertising
7,000
8419 • Bank Services
2,000
8423 • Organization/Member Dues
7,500
AICP, IEDC, ULI, FGFOA, FRA, Chairman's Club etc.
8425 • Public Relations/Communications
3,000
8430 • Insurance (D&O,Veh,Workers Comp, Bldg.)
17,000
8434 • Meetings
2,500
8436 • Seminars & Workshops
9,000
FRA, IEDC, FAPA, FAU-IOG, ULI etc.
8445 • Travel
9,000
FRA Board Mtgs (Ex Dir.), IEDC, FRA Conf. etc.
Total 8400 • ADMINISTRATION/OPERATIONS
606,000
Total 8000 - ADMINISTRATION
1,952,720
8600 • DEBT SERVICE
8605 - City - Former Chamber Parking Site
628,596
Payment for property acquisition
8606 - City - US1 Corridor Improvements
420,149
Payment toward City financing
8608 - City National Line of Credit
100,000
Original limit - $4 million
8610 • Debt Bond Interest -Taxable Int
1,050,000
BOA - Bond Issue
8620 • Debt Bond Interest -Tax Exempt Int
200,000
BOA - Bond Issue
Total 8600 • DEBT SERVICE
2,398,745
Total Expenditures for Activities
Revenue • .• Expenditures
29,241,802
Page 4 of 4
EA C.
O 'Vpt% Y
41VNI
P,
CRA FY 20152016
Proposed
;et and Work Plan Presentation
City Commission Workshop
September 8, 2015
hts of
2014m2015 Work Plan
Projects/Programs
DR. REV, J.W.M. THQMAS, iR, di
=r.
-
PARK
;
> a
I
y EeRav, fn rfia S'U`hfxrrn stllrn St Is nar rhSnt++B, ' � � '�Y`.�tv�. I � 'Sj „ ,�; •�. r' _ .{-;,r
'' Z 6rRrva NOn xsxn WGn Ba is sl[ent" .'� •a'x .IIII�II a �'slx 'Y' «s r 11 i ....
f3 �
bio :�. .� _,.. ,r sr ul91 (•��'/ 11 1 ' I' i.�
TMspxrklspamadln honor al Dr, Rarr.lahrt William Hanry Shnmaa, lr,1 _ 4' it
A (8 tima OxlrxJ Beach r,sld,nt, adueator, wmmunity acdv5st and ... ;�. A•o-• .,
�` Pastar attha Hlstorlcxl Sr, Paul Missionary Baptist Church for 411 Jean. -
_ e,' k y '111..
Y
ti
or"17b,- 1� I'll
9
e Feature
2015
i
Fire Station Headquarters Public Plaza -
Ground Breaking held on: June 24, 2015
Under Construction - Completion anticipated November 2015
/ AL
a�sr NANO"
r�i
�EpEVEIOP�F�9
FY 2014-2015
Proposed
CRA Work Plan
PROPOSED
Areawide and Neighborhood Plans
West Atlantic Avenue Redevelopment
West Atlantic Redevelopment Plan Update [G/L-5110] $125,000
Conduct an assessment of the plan including community's needs, market
demands, redevelopment opportunities, and development trends to determine
what additional measures should be taken to promote new development. This
may incorporated into updates to the Downtown Master Plan & Southwest
Area Neighborhood Redevelopment Plan.
Land Acquisition [G/L-5115] $156005000
Acquire parcels necessary to assemble sites for Redevelopment projects,
including parking.
SW 9th /1 Oth Ave
Pedestrian linkages
south end of block.
Improvements
between hotel site
[G/L-5122]
$200,000
and public parking lot/pocket park at
Areawide and Neighborhood Plans
West Atlantic Avenue Redevelopment
• Block 8 Alley [GiL-5123] $1207000
Construction of alley between SW 10th and 11th Avenues that is currently
unimproved but being used for access, loading and trash service.
• NW 12th Ave Beautification [GiL-5130] $7005000
Construction of landscaping & sidewalks for two block area between W. Atlantic
Avenue and MLK Drive. Also includes construction of alleys and on -street
parking, within one block area (between W. Atlantic Avenue and NW 1 St Street).
SW 6th, 7th, 8th & 9th Ave. Improvements [GiL-5132] $200,000
Pedestrian linkages to the proposed mixed-use development (Uptown Atlantic) at
the north end of the blocks, and on -street parking, where possible.
PROPOSED
Areawide and Neighborhood Plans
Downtown Master Plan
Delray Beach Center for the Arts (DBCA) [GL -5201] $1,200,000
The scope of work for this project will includes consensus building,
programming, design, bidding, permitting and construction administration
services for upgrades to the DBCA campus and Old School Square Park. facility.
Funding will cover project design and Phase I construction, if feasible.
Building Maintenance DBCA [GL -5202] $300,000
Funding is for the deferred maintenance of the buildings on the Delray Beach
Center for the Arts complex.
Fourth & Fifth (Old Library Site) [GL -5205]
$25,000
The existing dumpsters on the site are used by businesses fronting East Atlantic
Avenue, but will be eliminated with the redevelopment. The CRA will work with the
businesses to arrange for new waste receptacles for those businesses, on their
properties.
SE 1 st Street Conversion [GL -5210] $2505000
Associated with the conversion to 2 -way traffic, between US 1 and South Swinton
Avenue. Includes the installation of mast arm traffic signal at the intersection of S.
Swinton Avenue & SE/SW 1 St Street
PROPOSED
Areawide and Neighborhood Plans
Downtown Master Plan
E. Atlantic Ave. Pedestrian Improvements [GL -5215] $309000
East of ICWW
Project feasibility analysis and conceptual design for
improving pedestrian safety on E. Atlantic Avenue east of Gleason Street.
Gateway f=eature Signage [GL -5225] $50,000
Identification and descriptive signage associated with Gateway Feature at 1-95
and West Atlantic Avenue.
Downtown Trolleys [GL -5230] $4009000
Continuation of service from Tri -Rail to the beach.
Larking Management Plan [GL -5235] $4009000
Funding to assist with implementation of recommendations included in 2010
Parking Master Plan. Funding includes pedestrian improvements and updated
wayfinder signage throughout district.
Veteran's Park [GL -5242] $2005000
Improvements to Veteran's Park to implement the 2010 master plan was
proposed in three phases. Concept plan will be presented to City Commission
in Fall of 2015 for direction. Funding this FY is for overall design and
construction of the Phase I playground.
PROPOSED
Areawide and Neighborhood Plans
%fto
Downtown Master Plan
NE 3rd St/Avenue/Alley Improvements [GL -5251] $1,000,000
Street cape improvements to
improve appearance and pedestrian "E& -*, St
connections between parking lots
and businesses. Includes relocation P. -
r
of existing parking, as necessary,
and utilities improvements. site
Funding will include construction of
improvements.
ries si,
IN
PROPOSED
Areawide and Neighborhood Plans
Downtown Master Plan
Swinton & Atlantic Intersection (Design) [GL -5253] $2003000
Design and construction drawings to make the intersection more pedestrian
and vehicle friendly and improve connectivity between West and East Atlantic
Avenues.
Downtown Core Parking Utilization Analysis [GL -5255] $50,000
Includes updated parking utilization section (Chapter 3) of 2010 Parking
Management Plan. Results from parking utilization analysis will determine the
need for the public parking garage to replace surface parking lot (Gladiola Lot)
on east side of SE 6t" Avenue, south of East Atlantic Avenue. If a garage is
warranted, funding for design (including construction drawings) would occur in
FY 2016-17.
PROPOSED
Areawide and Neighborhood Plans
%fto
Downtown Master Plan
Martin Luther King, Jr. Drive (Phase II) [GL -5276] $3205000
1-95 sound wall to NIN 12th Avenue
Beautification of the corridor between NE 1 st
and NW 12th Avenues was completed in
2011 (Phase 1), included landscape nodes,
irrigation, paver brick crosswalks at major
intersections, lighting, two pocket parks.
The project also included features
commemorating Dr. Martin Luther King,
Jr. Phase II includes landscape nodes,
sidewalks, commemorative medallions and
an art feature at the 1-95 sound barrier wall.
SE 4th Avenue Beautification [GL -5278]
E. Atlantic Avenue to SE 2nd Street
The proposed improvements to SE 41h Avenue will
streetscape improvements proposed with the proposed
Delray projects. Funding this FY is for construction.
$600,000
complement the
iPic and Uptown
PROPOSED
Areawide and Neighborhood Plans
%fto
Southwest Neighborhood Plan
Village Square Elderly [GIL-5306] $297009000
Loan associated with redevelopment of Carver Estates site — 84 units of
senior housing.
smug
ENTRYELEVATION
3lock 32 Alley [GL -5330] $10000
mprove alleyway between SW 3rd & SW 4th Streets, between SW 4th & SW 5th
avenues to provide paved access to homes.
I W 12th Avenue [GL -5340]
$200,000
'roperty acquisitions and additional improvements to private and CRA—owned
properties is on-going.
PROPOSED
Areawide and Neighborhood Plans
%MO
Southwest Neighborhood Plan
• SW 12th Avenue Duplex Renovations[cL-5341] $150,000
Renovation to duplex located at 221
SW 12th Ave, situated in the middle of
recently renovated duplexes
FY13/14. Units will be used for
affordable housing.
sw izi�i nve. SW 12TM dtiY�.
• SW 14th Avenue Beautification [GL -5345] $3009000
Funds allocated primarily for acquisition of blighted properties and
construction drawings for alley improvements.
SW 141h Avenue Before SW 14th Avenue After
PROPOSED
Areawide and Neighborhood Plans
Southwest Neighborhood Plan
SW 2nd Street Beautification (Phase
Phase I beautification was completed in 2014
and did not include resurfacing due to budget
constraints. Phase II includes resurfacing.
Merritt Park [GL -5355] $4503000
Improvements include sod replacement and
upgraded irrigation, improvements to
restrooms and additional parking. Funding this
FY is for construction.
1 1 ) [5350]
Iw
$200,000
Block 63 Alley [GL -5360] $1005000
Construction of an unimproved alley, which is currently being utilized by
adjacent residents. Funding in FY14/15 was for construction drawings.
Funding in FY 15/16 is for construction.
North Federal Highway Redevelopment
Federal Hwy Plan Update [GL -5412] $509000
Conduct an assessment of the plan adopted in 1999 determine if additional
measures can be taken to upgrade the corridor and promote new
development.
PROPOSED
Areawide and Neighborhood Plans
Osceola Park Neighborhood Plan
• Osceola Park Alleys [GL -5510] $1753000
Funding this FY is for design drawings for alleys, traffic calming and sidewalk
improvements, per the adopted Neighborhood Plan.
• Osceola Business Area Revitalization [GL -5520] $800,000
Combination of streetscape IS
improvements with on -street parking
along SE 2nd Avenue, parking lot
construction, and alley improvements.,''
Funding this year is for construction.z:,:
PROPOSED
Areawide and Neighborhood Plans
%fto
Other
Sidewalks [G L-5650] $2009000
Completion of sidewalks and pedestrian links for greater pedestrian safety.
Priorities will be in line with City Commission's direction to provide
connectivity to places of worship and schools, as well as, parks and business
or employment centers.
NW/SW Neighborhood Alley [GL -5660] $1005000
Funding this FY will cover design of an unimproved alley(s) to be determined
within the Northwest or Southwest Neighborhoods. Construction to occur in
FY 16-17.
Seacrest/Del-Ida Neighborhood Plan
NE 2nd Ave/Seacrest Blvd. Beautification [GL -5710] $8005000
In 2011, CRA
and City staff
worked
to obtain MPO
grant ($616,262) for
construction of
improvements.
Design
work completed.
Funding for FY15/16
is for construction.
PROPOSED
Redevelopment Projects
NW/SW Stn Avenue Area
• NW 5t" Avenue Entrance Feature [GL -6203] $1009000
Lake Ida Road & NW 5t" Avenue
At the intersection of Lake Ida Road and NW 5t" Avenue is leftover right-of-
way that is not maintained. Funding this FY is for design and construction of
an entrance feature for the Northwest Neighborhood.
• NW 5t" Avenue Beautification [GL -6206]
$400,000
Between MLK Lr. Dr. & Lake Ida Road
Funds allocated primarily for acquisition of properties and construction of the
alleys.
• Block 20 Alley [GL -6213 ] $759000
Construction of alley west of NW 5t" Ave, south of NW 1 St Street.
PROPOSED
Redevelopment Projects
Affordable Housing
Housing Study [GL -6555] $50,000
Most recent affordable housing needs assessment for the City was
conducted in 2008. The CRA will collaborate with the City to fund and
complete a Housing Study. The findings would be used to help determine
demand, areas of focus, and development options, as well as the roles of the
various public, private, and nonprofit organizations that create housing
throughout the City.
SW 2nd Terrace (Carver Square) [GL -6630] $653000
Reconstruct street that was removed during remediation process. RFP for
redevelopment of the Carver Square properties to be issued by October
2015.
PROPOSED
Economic Develo
iects
Arts Warehouse [GL -7440] $2,8009000
Construction drawings were completed in FY 14/15. Funding in FY 15/16 is
provided for construction.
7
Ppb
v
QMO
EA cy
O
41VNI
P,
sting Budget Presentation
for
'reliminary FY2015-2oi6
tober i, zoi5 -September 30, 2oi6
PROPOSED BE�cti�
IF - venues -Recent History �,
9 �?'
9
MNI "
County County City City Variance
FY Taxable Value Millage TIF Millage TIF Year Total Prior Yr.
2014/15 $1,379,733,077 4.7815 $7,729,729 7.1611 $5,151,573 $12,881,302 11%
2013/14 $1,266,709,539 4.7815 $4,629,392 7.1611 $6,946,429 $11,575,821 7%
.2012/13 $1,268,479,798 4.7815 $4,273,735 7.1611 $6,455,940 $10,729,675 1%
2011/12 $1,179,149,327 4.7815 $4,228,018 7.1900 $6,376,396 $10,604,415 0%
2010/11 $1,187,514,519 4.7500 $40227,392 7.1900 $6,418,010 $10,645,402 10%
5 YEAR TOTALS:
Projected.
201516 $1.549,521,881
$25,088,266
4.7815 $5.968,565
$31,348,348 $56,436,614
7.1611 $8.814,103 $14,782,668 16%
16, 000, 000
14, 000, 000
12, 000, 000
10, 000, 000
8,000,000
6,000,000
4,000,000
I
2,000,000
N
C
O '
PROPOSED
Delray Beach CRA
TIF Revenue 1987-2015 History
S Eq C
.� C }
NNIV
1987 1990 1991 1993 1996 1997 1999 2001 2003 2005 2007 2009 2011 2013 2015
Year
PROPOSED
Preliminary FY 2015-2016
Revenue Summary - $2%241p802
Land Sales&
Property Revenue
3,800,000
13%
Carry Forward
Funds
8,091,924
28%
,Qt� BEACy
o�vv
�ic
4NMIVEQ►
LOC (to be established)
2,228,210
7%
All Other Sources
339,000
1%
- --
5,968,565
20%
City TIF
3,814,103
30%
16,000,000
14,000,000
12,000,000
10,000,000
8,000,000
6,000,000
4,000,000
2,000,000
L _
PROPOSED
FY 2015-2oi6
Expense Allocation - $2%241,802
Budget expenses arranged according to
5 Main Areas of Concentration:
1 d rMQ nnn
.4 BEAC
0
�uN�vE
Area Wide & Redevelopment Community Administration Debt Service
Neighborhood Projects Improvement &
Plans - Projects Economic
Development
PROPOSED
FY 2015-2oi6 Budget
CRA Funds Allocated For
Infrastructure Projects (included in City's CIP)
CRA GL#
5122
5123
5130
5132
5201
5202
5210
5215
5235
5251
5253
5255
5276
5278
5330
5350
5355
5360
Project Name
SW 10th/gth Ave Improvements
Block 8 Alley
NW 12th Ave - Atlantic to MLK
SW 6th, 7th.8 th and qth Ave
DBCFA Facility
DBCFA Buildinv Maintenance
SE 1St Street Conversion to 2 -way Traffic
E Atlantic Ave Pedestrian Improvements
Parking Management Projects
NE 3rd St/Ave Alley Improvements
Swinton &_Atlantic Intersection
Blk 117 Garage Design/SE 6th Ave
MLK Jr Drive Phase II
SE 4th Ave Beautification
Block 32 Alley
SW 2nd Street Beautification Phase II
Merritt Park
Block 63 Alley
.4 BEgC
4v ��
0IC
'QMNIVE�
CRA Funding
$200,000
$120,000
$700,000
$200,000
$1,200,000
$300,000
$250,000
$30,000
$400,000
$1,000,000
$200,000
$50,000
$320,000
$600,000
$100,000
$200,000
$450,000
$100,000
.4 BEACti
IV
PROPOSED °
Fly zoo -20i 6 Budget
CRA Funds Allocated For
Infrastructure Projects (Included in City's CIF)
---Continued from previous slide ---
CRA GL# Project Name
5510 Osceola Park Neighborhood Plan Alleys
5520 Osceola Park Business Area Revitalization
5650 Sidewalks
566o NW/SW Neighborhood Alley
5710 NE 2nd Ave/Seacrest Blvd Beautification
62o6 NW Stn Avenue Alleys
6213 Block 19 & 20 Alley Improvements
6630 SW 2nd Terrace
TOTAL (both slides)
CI P - Capital Improvement Program
CRA Funding
$175,000
$800,000
$200,000
$100,000
$800,000
$400,000
$75,000
$65,000
$%035000
PROPOSED
,an & Safe Program
.� B Eq C
0
'QMNIVE
3
2013-14
2014-15
2015-16
Increase
95
$174267384
$1,824,28o
$2,324,28o
$5007000
(lo% increase)
(28% increase)
(27% increase)
Downtown Manager,
(lice Officers, .75 Code
forms, 1 Golf Cart and
Sergeant, Sanitation Officer, z
Enforcement Officer, Trash
Pressure Cleaning
PROPOSED
FY 2015-2oi6 Budget
CRA Funds Allocated For
City Services/Programs in CRA District
Clean & Safe Program (Police, landscape maintenance, code
enforcement)
Community Improvement (Housing Rehab, Neighborhood Planner)
Downtown Trolley
Environmental Services (Project Engineer)
Tennis Tournament Sponsorship
Streetscape Maintenance (ongoing landscaping, irrigation for new
beautification projects)
Planning, Parking Management, IT Services
Total City Services/Programs
2,324,280
79,530
400,000
97,557
550,000
110,000
$3,621,367
PROPOSED
FY 2015-2oi6 Budget
CRA Funds Paid to
City of defray Beach
.rvices/Programs
i I Improvements
L
$3,621,367
$9Y035Y000
$12,656,367
PROPOSED
IFY 2015-2oi6 Budget
allocated to:
Delray Beach Non -Profit Organizations
DBCLT
DBHS
DB Public Library
EPOCH (Spady Museum)
Delray Beach Center for the Arts
DBMC
Creative City Collaborative
TOTAL
$174,487
$52,000
$418,000
$67,700
$412,500
$351,510
Z�5-
$IY751YI97
PROPOSED, ,� Bucy
11
Summary
e
FY zoo -2oi 6 Budget
5 � �uNwE
CRA Funding Paid to
City of Delray Beach and Non Profit Partners
Revenue from City:
City TIF Revenue paid to the CRA
Expenditures Allocated to City Projects,
Services &Non Profit Programs:
Paid to the City of Delray Beach
Paid to City/CRA Non Profit Partners
TOTAL
Difference in Excess of City TIF:
$$,814,103
$121656367
$1,751,1 97
$14,407,564
$5,593,461
PROPOSED
CRA Administration $1,952,720
��
4v ;BEaCti
�
0
ON
4/VNIdIC0
►udes new Arts Warehouse Manager along with several positions not filled in FY 14-15 and
'/o salary increase
4 Office Expansion $400,000
Projected
2014-15
2015-16
Personnel
961,76o
1.
1,269,020
Supplies &
Materials
8,398
8,500
Equip, Property,
& Maintenance
16,9oo
22Y200
Office Space
24,500
47,000
Administrative
Operations
278,300
2.
6o6,000
Total Expenses:
1,289,858
1,952,720
��
4v ;BEaCti
�
0
ON
4/VNIdIC0
►udes new Arts Warehouse Manager along with several positions not filled in FY 14-15 and
'/o salary increase
4 Office Expansion $400,000
PROPOSED
tY2015m2oi6 Debt Service
2014-15 2015-16
Tax Exempt Bonds 1,230,000 1,050,000
Taxable Bonds 1901000 200,000
City - Payment for Former
Chamber/Parking Site 1,266,215 628,596
City - Payment for USS Corridor
Improvements 420,149 420,149
City National Line of Credit **
55768 loo,000
Total Debt Service for FY106:
*3062032 2 398745
* Based on Draft Budget Amendment #2 FY 2014-2015
** Amount may be adjusted to account for 2015 line of credit
Ov S
FY 2015-2026
.0 �•
Outstanding Debt -41V70
Debt Total
City of Delray Beach -Former Chamber/Parking Site 628,596
2015-2023 (if property not sold, paid off @a 3% interest)
City - USi Corridor Improvements 2015-2026 3,194,041
City National LOC 2015-2017 (2.1% Interest ) 4,847,465
Revenue Bonds 2015-2019 71289,225
Total
15P959P3Z7
Thank You
�pEVELO%�2�
��I 1
ti
l'O" BEAG�
Questions?
MEMORANDUM
TO: Mayor and City Commissioners
FROM: Randal Krejcarek, Director Environmental Services
Isaac Kovner, City Engineer
THROUGH: Donald B. Cooper, City Manager
DATE: August 12, 2015
SUBJECT: AGENDA ITEM WS.3. - WORKSHOP MEETING OF SEPTEMBER 8, 2015
ACCEPTING 2 -SECTIONS OF ATLANTIC AVENUE FROM FLORIDA DEPARTMENT
OF TRANSPORTATION
BACKGROUND
Consider accepting ownership of two (2) sections of Atlantic Avenue from the Florida Department of
Transportation:
1) NW/SW 12th Avenue east to the west section of Swinton Avenue
2) East section of NE/SE 5th Avenue east to the west section of SR AIA (not including the Intracoastal
Waterway Bridge (IWB)).
The City currently owns and maintains the section of Atlantic Avenue from the east side of Swinton
Avenue to the west side of NE/SE 5th Avenue.
In late 2014, FDOT met with staff to discuss their intent to charge the City fees which prompted the
discussion relating to the future ownership of Atlantic Avenue. FDOT expressed their intent to levy
fees within their right of way (ROW) pertaining to: valet parking spaces, sidewalk cafes and metered
parking spaces.
Subsequent meetings with the FDOT resulted in staff considering the idea of owning the east portion of
Atlantic Avenue from NE/SE 5th Avenue to SR AIA. In response, FDOT advised staff that areas west
of Swinton Avenue to NW/SW 12th Avenue would also need to be included in such an arrangement. A
primary factor in consideration of this request is FDOT's reluctance to allow paver brick crosswalks in
their ROW; which prevents the creation of a standardized look throughout the downtown corridor.
FDOT only allows concrete, stamped concrete, asphalt, or stamped asphalt in their ROW's.
Moreover, staff submitted construction plans to the FDOT for the repair of the existing paver brick
intersections along with the installation of paver brick crosswalks located at Venetian Drive and
Gleason Street which has been denied.
The City has several stamped asphalt intersections west of Swinton Avenue that exhibit signs of
excessive wear and are in need of maintenance. Therefore, staff believes that accepting ownership of
both the western and eastern portions of Atlantic Avenue as depicted above would be in the City's best
interest creating a standardized look throughout the downtown corridor beginning at NW/SW 12th
Avenue and continuing east to the western portion of SR AIA (not including the IWB).
The City's ownership of Atlantic Avenue is a policy decision which will permit a consistent look of
paver brick intersections, crosswalks, and decorative lighting, from NW/SW 12th Avenue east to SR
AIA (not including the IWB) and will allow the City to retain ownership of the valet parking spaces,
sidewalk cafes, and metered parking spaces east of NE/SE 5th Avenue.
Currently the City maintains the following item on Atlantic Avenue:
1) Paver brick sidewalks
2) Paver brick intersection at Venetian Drive and Gleason Street
3) Paver brick crosswalks from SW/NW 12th Ave. to Swinton Avenue
4) Parking meters
5) Landscaping
6) Irrigation
7) Street lights
8) Bus shelters
9) Traffic lights (maintained by PBC)
Pursuant to FDOT's current maintenance schedule and associated cost estimates, the City would be
responsible for programming the City's annual capital improvement program to include:
1) Resurfacing of Atlantic Ave. at $104,120/year
2) Traffic Signals on Atlantic Ave. at $ 24,000/year
3) General Maintenance of Drainage on Atlantic Ave. at $ 34,844/year
FDOT's total estimated maintenance costs for items 1-3 are $162,964.00/year.
The City can utilize the $162,964 per year in the following fashion:
a) Construction of paver intersections and crosswalks from NW/SW 12th Avenue east to SR AIA
along Atlantic Avenue (12th, 10th, 8th, 5th, 2nd, Swinton, and 7th Avenue)
b) Installation of spun concrete poles with new LED light fixtures east of Swinton Avenue
c) Installation of trolly stops along Atlantic Avenue
d) Installation of bike stops along Atlantic Avenue
e) Installation of trombone mast arms from Swinton Avenue to north bound Federal Highway
In accordance with the City accepting ownership of the ROW limits, the FDOT would either pay the
City a lump sum payment in the amount of $802,820 or $162,964 per year for 15 years totaling
$2,444,460. A cost analysis based on FDOT's 15 year payment proposal is attached.
According to the projected 15 year cost analysis, the City will show an accumulative cash loss from
year 2020-2027 and from 2030 on -wards the City will show an accumulative cash loss for the
maintenance of Atlantic Avenue.
Board Approvals:
1) The proposed western and eastern limits of Atlantic Avenue, under consideration, fall within the
CRA boundary and the CRA unanimously recommended ownership of the roadway limits from FDOT
(7/23/15).
2) WARC unanimously recommended ownership of the roadway limits from FDOT with the
recommendation to accept the 15 year payback from FDOT (8/6/15).
3) DSMG unanimously recommended ownership of the roadway limits from FDOT (8/6/15).
4) DDA unanimously recommended ownership of the roadway limits from FDOT with the
recommendation to accept the 15 year payback from FDOT (8/10/15).
5) Planning and Zoning Board scheduled for 8/17/15.
In consideration of the preliminary agreement, the following items will need to be re -submitted to
Commission at a future agenda meeting:
1) An interlocal agreement, between the City and FDOT, for roadway transfer in accordance with
Chapter 335.0415, F.S.
2) After FDOT and the City agree upon the terms and conditions specified in the transfer agreement,
FDOT will prepare the final transfer agreement for approval and signature by the elected/designated
City officials.
3) The City Commission will need to adopt a resolution authorizing the execution of the
aforementioned transfer agreement per a resolution.
4) An amendment to the Transportation Element of the Comprehensive Plan will be necessary to
ensure consistency with action taken by the City Commission.
Attachments include:
1) FDOT Limit and Location Map
2) FDOT Drainage Map
3) Cost Analysis
DISCUSSION
The item before the City Commission is a request to consider a policy decision concerning the
ownership and maintenance of two (2) sections of Atlantic Avenue from the FDOT:
1) NW/SW 12th Ave. east to the west section of Swinton Avenue
2) East section of NE/SE 5th Avenue east to the west section of SR AIA (not including the Intracoastal
Waterway Bridge)
TIMING OF THE REQUEST
Timing for this request is of high importance because the City needs to perform the repairs to pavers at
the intersections of Venetian Drive and Gleason Street.
RECOMMENDATION
Staff is seeking the City Commission's discretion with this policy decision.
• j� `� L _ tai:'•,' _i. �� • F�tsM� s t ^. ���w ��'•:.��
Is lbeer
�i ri_ y
% A► y 1 • >•A i ♦ ' as •. •} �` . • • * -! `r
Ir
1111,
Alf
ir
IL
Jk
i_rF
s • cr
fir r s �~ " ea V Z yr `
lie
611110
to Wh� t Milepost: 9.18
ALA T
0 ILI
..r LA
r TIT
Ilk
• . J 7111 ► .. �'t " ' - _ IA _• �' L�
M ;KIK
-� • • 117dW
n_.. Q , ♦ w�, s,A • ` •:
llffm=' 41�4a' MW 41V
LT r-
147pop
1P Ask
Ift
rs..► - , cw ��`
' F' •
IL ma.
IL
• t '+ w
rp
•r 't .A -446 -.
or� .. A •, � . � � � . W J':1
} 0: Rte,','1 11— �. ,.� ...,�
Legend 11.,, 4 AIL; •1 M
Proposed Roadway Transfer To City --91F
—On System Roadways This data I intended for the use of FIDOT personnel and authorized consultants. The data has been Exhibit A
•ff System Roadways 1 000 000 Atlantic
--- - - - - ps0M
Is lbeer
y
% A► y 1 • >~A i ♦ ' as •. •} �` . • • * -! `r
Ir
a � � � I- ."'� •► � `• Li[.� • .. ,tit � .� ,w ,+
_. i .,� • : -� 1 W +iw �►'•w rim �J� ���+,'
IL Will
Jk
i-rF
s • cr
�t +' -7 .I • i, w+ 1 i''� �► / .SII .1
V f •/, Zyr
lie
+� ~ a .� y •
t,
i1 L �, `� ,� i 1• ^►T w �1 . . • • ` eat t
r 1 •'1 ' , rim_ �,� �- t- ar�.•� ,- -•• • :
-
Ji3w. all A so
App� Jill 11111111
-,� WT L —'9_ LA
,.
t
.�,.. .,'
7" tom% ��� - s ������..gpw�� ��,p���i'i ♦_ ��l�illi���?iw---- ----------
���►���� � i-- - � h� ��i►a���•..�..a����s gas � ►® �e . .
• ._�_�• *� a.v1 or �.c,� c.� v �rF -�� `•'� '4111P-
1 I r
•
1 . l - 7 • r -
! �"• , o -
M.A. Segment 2 Length
SR5/US1 SB to Ocean Blvd
- � • • ' 117 tr Q � �' �� � rj 0-598 Centerline Miles
z .1 *Bridge Not included
lw
dw
a Alp
At pop
ill r
AV Oil &ILAL =WIN
Lr
Legend
Storm Manhole
Storm Inlets J-1 wilt 0*4
Storm Pipes AsAb
' f' •
• -� '� ��
ElLeimir
PDFConvert.24830.1.AHantic_Avenue_purchase_breakeven_analysis_06.29.15.xlsx
15 yr payments -10 yr repaving
($ millions)
2016 2017 2018 2019 2020 2021 2922 MOL3 2024
2025 2D26 2027 2M 2029
2030 2031 2032 2033 2
2035
2036 2037 2038 2039 2040 2041
LNJ
2043 2044 2045 2046 2047 2048 2049
2050
City's cost under FDOT Ownership
0900 0.000 0900 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000
0.000
0.000 0.000 0.000 0.000 0.000 0.000
0.000
0,000 0.000 0.000 0.000 0.000 0.000 0.000
0.000
City's cost under City Ownership
Paving (1)
1.737
2.223
2.846
3.643
Striping (2)
0.015
0.019
0.024
0.031
Mobilization (3)
0.088
0.112
0.144
0.184
Clean and video pipe and Inlets (4)
0.073
0.094
0.120
By-pass pump (5)
0.020
0.025
0.032
Pipe plug (6)
0.003
0.003
9.004
Dump ticket (7)
0.010
0.013
0.017
MOT (8)
0.009
0.011
0.015
Mobilization (9)
0.004
0.005
0.006
0.000 0.000 D.000 O.OW ODCO O.OW 0.000 0.0W 0.000
O.DOD 0.000 oP00 0.000 0.000
0.000 0.000 0.000 0.000 0.000
0.000
0." 0.000 0.000 0.000 O.Doo 0,000
0.000
0.000 0.000 0.000 0.000 0.000 0,000 0.000
0.000
Total cost under City Ownership
O.Q. D9W 0.000 O.OW 1.839 0.1100 0.000 O.OW ODOR
0.118 0.000 0.000 0.000 0.000
2.354 0.000 0.000 0.000 0.000
0.152
0.000 0.000 0." 0.000 3.014 0.000
0.000
0.000 0.000 0.194 0.000 0.000 0.000 0.000
3.858
FDOT payment
0.1606 0.160564 0.160564 0.160564 0.160564 0.160564 0.160564 0.160564 0.160564 0.160564
0.160564 0.160564 0.160564 0.160564
0.160564
Net cash gain (loss)
0.161 0.161 0.161 0.161 (1.679) 0.161 0.161 0.161 0.161
11.042 0.161 0.161 0.161 0.161
(2.194) 0.000 0.0ou 0.000 0.000
(0.152)
0." 0.000 0.0010 0.000 )3.014) 0.000
0.000
0.000 0.000 (0.194) 0.000 0.000 0.000 0.000
(3.858)
Cumulative cash gain (loss)
0.161 0.321 11.482 0.642 (1.036) )0.876) (0.715) (0.555) (0.394)
(0.352) (D.191) (0.031) 0.130 0.2911
(1.904) )1.904) (1.904) (1.904) (1.904)
(2.055)
(2.055) )2.055) (2.055) )2.055) (5.069) )5.069)
(5.069)
)5.069) )5.069) (5.263) )5.263) )5.263) (5.263) (5.263)
(9.121)
The last time FDOT repaved Atlantic Ave. was around 2009. FDOT is planning to repave Atlantic Ave.
in 2020(S years from now). It is estimated that Atlantic
Ave. has a Level of Service of 10 years before
milling and
resurfacing is required.
Notes:
2.500% For all costs. -um. annual inflation of 2.5 %
1.535 1. To mill 1" and resurface (type Sill asphalt) Atlantic Ave. every 10 years: SW 12 Ave. east to Southbound
Federal Highway (S" Ave.) then Northbound Federal Highway (6" Ave.) east to AIA (Does not include
Intracoastal waterway bridge) = 61,400 sy. @ $25.00/sy =$1,535,000
0.013 2. Stripping approximately 66001f roadway @$2.00/If=$13,200
0.077 3. Mobilization @ 5% of paving cost(Includes MOT) =$1,548,200x.05=$77,410
The existing drainage system is in relatively good condition. At this time cleaning and routine maintenance needs to occur every 30 years. (per I Kovner email
6.18.15)
0.057 4. Cleaning and Video pipe and iole[s(5720 If of pipe and 111 inlets)= 57201f x$5.00/If=$28,600x2/year=$57,200 x 10 years = $572,000
0.015 S.By-pass pump of 140 hours@$55.00/hr=$7,700x2/year=515.400 x 10 years=$154,000
0.002 6. Pipe plug of 14 days @$35.00/day x2 plugs =$980x2/year=$1960 x 10 yea rs=$19,600
0.008 7. Dump Ticket of 14 days @$295/ea=$3,990x2/year=$7,980 x 10 years = $79,800
0.007 B. MOT of 14 days @$250/day=$3,500x2/year=$7,000 x 10 years = $70,000
0.003 9. Mobilization of$1,500x2/year=$3,000 x 10 years =$30,000
Traffic signals are maintained by PBC but Traffic mast arms will be maintained by the City (Cost TBD)
10. Traffic signal mast arms ASSUME
IA Warner Page 1 of 2
PDFConvert.24830.1.AHantic_Avenue_purchase_breakeven_analysis_06.29.15.xlsx
15 yr payments - 20 yr repaving
($ millions)
2016 2017 2018 2019 2020 2021 2922 2MOD 2024
2025 2026 L022 2028 2029
2030 2031 2032 2033 2034
2035
2036 2037 2038 2D39 2040 2041 2042 2043 2044
21145 2046 2047
2048 2049 2050
City's cost under FDOT Ownership
0.000 OA00 0.000 0.000 0.000 0.000 0.000 0.000 0."
0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000
0.000
0.000 0.000 0.000 0." 0.000 0." 0.000 0." 0.000
0.000 0.000 0."
0.000 0.000 0.000
City's cost under City Ownership
Paving (1)
1.737
1.965
Striping (2)
0.015
0.017
Mobilization (3)
0.088
0.099
Clean and video pipe and Inlets (4)
0.073
0.094
0.120
By-pass pump (5)
0.020
0.025
0.032
Pipe plug (6)
0.003
0.003
0.004
Dump ticket (7)
0.010
0.013
0.017
MOT (8)
0.009
0.011
0.015
Mobilization (9)
0. 0
OA05
0.006
0.000 0.000 D.OW U.o00 0.000 0.000 D.DDD 0.0. 0.000
D.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000
0.000
0.000 0.000 0.000 0.000 0.000 D.0o0 0.000 0.000 0.000
0.000 0.000 0-
0.000 0.000 0.000
Total cost under City Ownership
O.Q. 0.000 0.000 0.000 1.839 0.000 0.000 O.o00 0.000
0.118 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000
0.152
0.000 0.000 0.000 0.000 2.081 0.000 0.000 0.000 0.000
0.194 0.000 0.000
0.000 DAM 0.000
FDOT payment
0.1606 0.160564 0.160564 0.160564 0.160564 0.160564 0.160564 0.160564 0.160564 0.160564
0.160564 0.160564 0.160564 0.160564
0.160564
Net cash gain (loss)
0.161 0.161 0.161 0.161 (1.679) 0.161 0.161 0.161 0.161
OA42 0.161 0.161 0.161 0.161
CAR 0.000 0.000 0.000 0.000
(0.152)
0.000 0.000 0.000 0.000 (2.081) 0.000 0.000 0.000 0.000
(0.194) 0.000 0.000
0.000 0.000 0.000
Cumulative cash gain(loss)
0.161 0.321 0.482 0.642 (1.036) (0.876) (0.715) (0.555) (0.394)
(0.352) (0.191) (0.031) 0.130 0.290
0.451 0.451 0.451 0.451 0.451
0.299
0.299 0.299 0.299 0.299 (1.782) (1.782) (1.782) (1.782) (1.782)
(1.976) (1.976) (1.976)
(1.976) (1.976) (1.97()
The last time FDOT repaved Atlantic Ave. was around 2009. FDOT is planning to repave Atlantic Ave.
in 2020(S years from now). It is estimated that Atlantic
Ave. has a Level of Service of 2\O years before milling and
resurfacing is required.
Notes:
2.500% For all costs asssume annual inflation of 2.5 %
1.535 1. To mill 1" and resurface (type Sill asphalt) Atlantic Ave. every 10 years: SW 12 Ave. east to Southbound
Federal Highway (S" Ave.) then Northbound Federal Highway (6" Ave.) east to AIA (Does not include
Intracoastal waterway bridge) = 61,400 sy. @ $25.00/sy =$1,535,000
0.013 2. Stripping approximately 6600 If roadway @$2.00/If=$13,200
0.077 3. Mobilization @ 5% of paving cost(Includes MOT) =$1,548,200x.05=$77,410
The existing drainage system is in relatively good condition. At this time leaning and routine maintenance needs to occur every 30 years. (per I Kovner email
6.18.15)
0.057 4. Cleaning and Video pipe and inlets (5720 If of pipe and 111 inlets)=5720 If ,$5.00/If=$28,600x2/year=$57,200 x 10 years = $572,000
0.015 S.By-pass pump of 140 hours@$55.00/hr=$7,700x2/year=515.400 x 10 years=$154,000
0.002 6. Pipe plug of 14 days @$35.00/day x2 plugs =$980x2/year=$1960 x 10 yea rs=$19,600
0.008 7. Dump Ticket of 14 days @$285/ea=$3,990x2/year=$7,980 x 10 years = $79,800
0.007 B. MOT of 14 days @$250/day=$3,500x2/year=$7,000 x 10 years = $70,000
0.003 9. Mobilization of$1,500x2/year=$3,000 x 30 years =$30,000
Traffic signals are maintained by PBC but Traffic mast arms will be maintained by the City (Cost TBD)
10. Traffic signal mast arms ASSUME
IA Warner Page 2 of 2
MEMORANDUM
TO: Mayor and City Commissioners
FROM:
DATE: August 27, 2015
SUBJECT: AGENDA ITEM WS.4 - WORKSHOP MEETING OF SEPTEMBER 8, 2015
COMMISSION COMMENTS