Loading...
Support LOOK IN SECTION ; 21-46-43 BUILDING DEPARTMENT, DELR Y BEACH, FfFIIDADateName of ownerWayne Stewart & James W. NRyeSn, Jr. 1S.E. 1st Avenue (over) r �j - 'r C-2 t Legal: Los) Block //Subd.bo C /1 6— 'Zoning / Permit No. 1'S 0 / Renewals Contractor Wayne Stewart Estimated Cost: $ 100, 000. Purpose of Building cbs contractor' s offices , hype of Construction i r RECORD OF IIVSPECTIOfJS BUILDING DEPARTMENT PLUMBING DEPARTMENT ELECTRICAL DEPARTMENT AIR CONDITIONING DEPT. APPRO APPROVED APPROVED APPROVED FOUN + � / Z ROUGH I. TEMP. SERV. ROUGH FLOOR SLAB T.S.&T.0. SLAB SLAB -r LINTELS i / SEWER ROUGH FINAL TIN CAP OOF G� FINAL �2, CABLE HEAT CONTRACTOR FRAMING CONTRACTOR �% FINAL �" �'l'�%' PERMIT N0. LATHING CONTRACTOR _Lek ROOF TIL PERMIT NO. 2�' 0a PERMIT N0. SWIMMING POOL FINAL ��' ' � � PERMIT N0. Dri ay Permit No. Date Cert. of Occupancy Issued /1:�2--7 '7� �-- B10 it 0103 City of Delray Beach Florida 12/19/11 Land Legal Description Inquiry 08 : 35 : 27 Property 100 & 102 SE 4TH ST 12 43 46 21 09 001 0100 Legal Description MODEL LAND CO SUB OF W 1/2, N 165 FT OF WLY 85 FT OF ELY 105 FT OF LT 1 LYG W OF FLA EA ST COAST RY R/W (LESS N 25 FT SE FOURTH ST R/W & S 18 FT) BL K 1 Press Enter to continue. F3=Exit F12=Cancel