Res 05-95 RESOLUTION NO. 5-95
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
DELRAY BEACH, FLORIDA, SUPPORTING STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION, PROJECT NO.
93220-1465, BUILD ALTERNATIVE 3A-2, INTERSTATE
95/PALM BEACH INTERNATIONAL AIRPORT DIRECT
CONNECTOR.
WHEREA~, Interstate 95 is the primary north/south surface
transportation corridor linking all coastal urban areas in Palm
Beach, Martin, St. Lucie, Broward and Dade Counties; and
WHEREAS, the Florida State Department of Transportation
(FDOT) has conducted comprehensive studies, and determined that
improvements in Interstate 95 and connecting roads, including a
direct connector to Palm Beach International Airport, are necessary
to accommodate existing and future vehicle traffic demands along the
Interstate 95 corridor; and
WHEREAS, FDOT cost estimates state that Build Alternative
3A-2 is the least costly to the taxpayers of Palm Beach County,
saving county taxpayers an estimated $11 million over other build
alternatives; and
WHEREAS, the Palm Beach County Metropolitan Planning
Organization has voted in favor of the Interstate 95/Palm Beach
International Airport Direct Connector as part of its 5-year road
improvement program; and
WHEREAS, the City Commission of the City of Delray Beach,
Florida, finds that improvements to Interstate 95 and connecting
roads, including a direct connector to Palm Beach International
Airport, will ensure that Palm Beach County residents and visitors
will have access to, and continue to receive the benefits associated
with, efficient and convenient transportation for goods and people.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF
THE CITY OF DELRAY BEACH, FLORIDA, AS FOLLOWS:
Section 1. That the City Commission of the City cf Delray
Beach, Florida, supports the Palm Beach County long range
transportation plan improvements to Interstate 95 with a direct
connector between Interstate 95 and the Palm Beach International
Airport, known as "Build Alternative 3A-2".
PASSED AND ADOPTED in regular session on this 17th day of
January, 1995... p~ ~~
City Clerk
-2- Res. No. 5-95
PLANNING AND ZONING DEPARTMENT MEMORANDUM
TO .' DAVID HARDEN
INT~.RNATIONAL AIRPORT DIRECT CONNECTOR
DATE: JANUARY 9, 1995
The City Commission has been asked to pass a resolution
supporting the construction of a direct connector between
Interstate 95 and the Palm Beach International Airport. The
project, referred to as Alternative 3A-2, would provide a
separate interchange for access to and from the airport, instead
of the indirect access that now exists off of Belvedere Road and
Southern Boulevard. It also involves modifications to improve
the traffic movements onto and off of the Belvedere Road
interchange. The cost of the project (approximately $60
million) is to be paid from federal, state, and airport funds.
The population growth projected in Palm Beach County through the
year 2020 will result in traffic volumes that will place a
severe strain on the transportation network, especially on 1-95.
That growth will increase the utilization of PBIA as well,
affecting its overall efficiency and functionality. An
important component to improving that efficiency is the
direct connection between the airport and the interstate highway
system. Not only will the connection allow for improved access
to the airport, it will also keep thousands of trips off of the
County's road system, thereby improving the capacity and
efficiency of those roadways.
Of the alternatives considered, Alternative 3A-2 is considered
to have the lowest cost and the least impact on the surrounding
areas. It is estimated that it will save the County $11 million
in the long run by eliminating the need to make expensive
upgrades to the County road system.
Given the projected traffic volumes and the available
alternatives, it is appropriate that the City Commission
express support for Alternative 3A-2.
MEMORANDUM
TO: MAYOR AND CITY COMMISSIONERS
FROM: CITY MANAGER~'fit/~
SUBJECT: AGENDA ITEM # ~ - MEETING OF DECEMBER 6. 1994
RESOLUTION NO. 5-95/ALTERNATIVE 3A-2. INTERSTATE 95/PALM
BEACH INTERNATIONAL AIRPORT DIRECT CONNECTOR
DATE: JANUARY 12, 1995
This is before the Commission to consider Resolution No. 5-95 in
support of the construction of a direct connector between
Interstate 95 and Palm Beach International Airport, known as "Build
Alternative 3A-2"
You have in your backup material correspondence from County
Commissioner McCarty requesting the City's support for this
project, as well as letters from Mayor Nancy M. Graham and
Commission President Howard Warshauer of West Palm Beach urging the
City not to support the proposed interconnect in any way. Also
included is a recommendation from the Planning and Zoning
Department that support for Alternative 3A-2 is appropriate.
Recommend consideration of Resolution No. 5-95.
ref:agmemol0
FLORIDA DEPARTMENT OF TRANSPORTATION
~ ~ 605 Suwarmee Street, Tallahas,.~ee. Moflda 3259904.50 ~ G. WATI~
~ SEC, IU~AK'Y
February 2, 1995
Ms. Alison MacGregor Harry
City Clerk
City of Delray Beach
100 N.W. 1st Avenue
Delray Beach, Florida 33444
Dear Ms. Harty:
Thank you for your January 24 letter and City of Delray Beach Resolution No. 5-95
supporting Alternative 3A-2 for the Interstate 95/Palm Beach International Airport Direct
Connector.
By copy of this letter I am forwarding your submittal to our District Four project staff
in order that it be made a part of the official record of the project. We appreciate the City's
interest and support as we seek to deliver transportation facilities and services to the people
of Florida.
Sincerely,
Secretary
BGW:oc
cc: District Secretary Rick Chesser
CITY CLERK
~--ounty Commissioners /,/~ '~'~' b 7'/'/~-' '
Board
of
~ County Administrator
Ken L. Foster, Chairman Robert Weisman
Burt Aaronson, Vice Chairman
Karen T. Marcus
Carol A. Roberts
Warren H. Newell
Mary McCarty ~, D~'e 'Y 0 lj~
Maude Ford Lee OI ~'), OoM~;~C/OfV'' -~
December 27, 1994
The Honorable Thomas E. Lynch
Mayor, City of Delray Beach and
Members of the City Commission
100 N.W. F/~st Avenue
D elrayX~?3444!
Dear ~oY Lynch:
The purpose of my letter is to request your support for the
Florida Department of Transportation Project known as
Alternative 3A-2, Interstate 95/Palm Beach International
Airport Direct Connector.
Population growth in southeast Florida and Palm Beach
County has brought 1-95 near the Airport and connecting
roadways to operating levels near or over capacity. The
recommended alternative will provide the increased vehicle
traffic capacity needed to support existing and future
demand in the most cost effective manner, utilizing
budgeted 80% federal funds, and 20% state and airport
funds. If Alternate 3A-2 is not approved, it could cost
County taxpayers $11 million to upgrade County roads to
meet traffic demands, and the federal dollars dedicated for
construction will go elsewhere if FDOT decides to stop the
project.
I am requesting that your City Commission pass a resolution
in support of the project whiCh can be submitted in time
for the Department of Transportation Public Hearing on
Wednesday, January 25, 1995 at the West Palm Beach
Auditorium at 7:00 P.M. Suggested language for the
resolution is attached.
Also enclosed is a copy of "Status Report - 1-95 Airport
Director Connector" which gives an overview of the FDOT's
determination of the need for the improvements.
For the benefit of all Palm Beach County residents and
visitors who will be served by this practical and
convenient transportation alternative, I encourage your
support of this project.
"An Equal Opportunity - Affirmative Action Employer"
P.O. Box 1989 West Palm Beach, Florida 33402-1989 (407) 355-2030 FAX: (407) 355-3982
The Honorable Thomas E. Lynch and
Members of the City Commission
Page Two
/
Please send your resolution to my attention, or call for
the document to be picked up prior to the hearing date, and
don't hesitate to contact me at 276-1220 for additional
information.
Si~y,
Mary M~t~~~~~~
~l~i~eac~y Commissiosi°-ne~' ~istrict. IV.~n
MM:gmr
cc: David Harden, City Manager
w/Enclosures
~ pdnted on recycled paper
1.9$1Alrl)o~ LRr~d Conneclor
BACKGROUND The projcctcd population of Pslm Bcach
County in 2020 is 1,426,900 (Palm Beach
lntersLate 95 0-95/$R 9) is a north-south County MPO: 1989) which represents a
limH~d acce~ facility'connecting urban sustained growth rate of 2.5 getc~t per
¢entet~ of the eastern United States from year. Employment in south Palm Beach
Maine to Florida. Connecting the Dade, County is alao anticipated to grow at 7.5
Broward, and Palm Beach Tri-c. ounty area, percent per year.
the 1-95 corridor aho provide$ the primary
north-south service for local and regional This growth in population has been reflected
traffic in southeast Florida. in traffic volum~ along 1-95. Belweea
1980 and 1991 the 1-95 mainline volumes
The southeast Florida region hal undergone between Forest Hills Boulevard and
explosive growth in the laat ten yeara. Southern Boulevard have increased from
From 1980 to 1991 population in Palm annual average daily traffic (AADT) of
Beach County increa~ from 2J76,800 to 68,500 to 133,800. Accordingly, the
883,000 in 1991, an increase of 4.:5 percent AADT in 2020 i$ expected to b~ 183,$00,
per },eat. ^ similar growth rdt~ ia forecut referenca Figure 1. In order to provid~
to continue through tha year 20'20. tran~<)rtation infra$trueture and mwic~
concurrent with this anticipatt~d futur~
Figure 1: Traffic Trends and Forecasts 1-98
I
T~ends Analysi~
I-I~'- ~ #III II,i~ll. %~ I~I'~n IId.
Sa~tut R~gort: l-9$/Atrl~n D~rta Cenn¢ctor
demand, ~vecal lmproveme~L~ have been~ Iff order to pro~
p~s gong !-95 ~ P~m ~h Coun~ ~ ~s ~fl~ fl~, ~o p~
Mdr~s ~is n~. ~ ~ofida ~~mt improvem~a ~ e~
of T~~ h ~dy pl~ ~e ~dway n~rk in P~m ~ ~un~
impmvem~u ~ ~ I-9S ~dor ~u~h by:
~u~ VeAicle ~0~ l~e~e · lmpro~ng ~e o~fion of ~e !-95
l~ve~ aM ~ilro~ Cms~ing m~nl~e ~
~lmi~on $~. Numet~s gtema~v~ ~ · impm~g ~ o~on of
improve ~e exis~g in~tc~g~ ~~ r~d~y
ptovidM in ~e s~dy. ~ pro~ ~O~ L~
imptovem~ ~e g~ iden~M in ~ ~a~
~ach Cou~ Compre~i~ ~l~. ~ limiU of ~s pro~t, ot
s~dy ~, ~nsi~ of ~e ~gm~t
Sou~om ~ul~v~d, ~lv~ro R~d, ~ ~em ~ulevud ~d ~v~
Aus~i~ Av~, ~ 1-95 ~ ~unen~y R~, inclu~ve of ~e interch~
o~a~ng n~ ~ ov~ ~ity. Aa ~ffio ~nn~fing t~ys in ~il ~g~t.
volum~ ~d ~m~l levdl of t~dwayl~nside~ i~lude:
I~ ~d~y ~stem ~n~t ~ 1-95 ~ ~m ~ R~d
1-95 ~ Aus~ Avenue
Addifion~ly, 1-93 ~ Sou~ · Aus~i~ Av~
~ulevud ~ ~v~ R~ ~ ~m ~R~d to Belv~ere
ex~~ ~ a~id~t ~te ~ ~
~ja~t gila of l-~. ~ ~ ~
~ 1984-19~. 211 ~id~U ~ 6 fa~fi~
devel~ ~ ad~ ~e n~ lo im~
O~~ o~n~ona ~ong ~ I-9S ~d~
t~dway ~o~ pro,ding a~
~ provid~g ~s ~ ~e P~m ~ ~nsider~ viable ~d w~e ~
lntema~onM Ai~ ~e ~ci~tM ~ ~gin~fing ev~ua~ons.
o~ at defici~t levels of ~1~ u a
~sult of &ro~ ~ ~f~. ~ I~ ~ ~is g~ma~ve ptovi~
at defici~t levds of ~ as ~ 0 a b~dM ~p system
~mmu~ ~nfin~ ~ grow. d~o~ of 1-95 to
w~g.
2
Statut Repo~: I-~$/Airpo~ Dlt~et Corm#clot
· a flyover ramp from northbound 1-95 · improvea It'~ffie on 1-9~ by
to westbound Southern Boul~vard, ~iminating weaving sections with ·
· · flyover ramp from eastbound braided ramp system
Belveder~ Road to northbound 1-95,
and Alternadve3A:2
· a grade separated interchange at the
intersection of Australian Avenue · meets all specified engineering
and Turnage Boulcvn.rd. critetht and remedies exis~g and
5 improves Southern Boulev~d and anticipated deficienciea
Belvedere Road between 1-95 and · provides a direct connector roadway
Australian Avenue between 1-95 and PBtA
· requires approximately 12.77 acres
Alternative 3A-2 This alternative provide~ of right-of-way
· has the lower cost and impact on
· a braided ramp system in both surrounding la. nd uses
directions of 1-95 to eliminate · improves traffic conditions along
weaving, and Southern I~oulevud, Belvedere
· a directional ramp system between l- Road, and Austnd]an Avenue by
95 and PBIA. removing traffic travelling between
1-95 and PBIA
EVALUATION OF ALTERNATWES · improves traffic on 1-95 by
eliminating weaving sections with ·
T~e Alternative I and Alternative 3A-2 were braided ramp system
evaluated for thcir nbility to remedy existin$
and anticipated deficiencies, engineering Right-of-way and construction co~ for
performance, anticipated social, Alternative I and 3A-2 ue shown in
environmental, and economic impacts, and Table I.
right-of-way and constrdction cost.,~. The FUNDING
following summ~zes Ihe results of the
evaluation. Alternative 3A-2 is fully funded through
Federal ~d state sources for design and
~ right-of, way costs. E~ements of Alternative
I are not eligible for Federal and state
· meets all specified engineering funding. Funding from local sources is
criteria and remedies existing and required for the element~ which ue not
anticipated deficiencies covered by Federal or state sources.
· improves the Southern Boulevard and
Belvedere Road interchanges with
1-95
· provides a grade separated
interchange at Australian Avenue and
'rurnag¢ Boulevanl
· requiren approximately 24.77 acres
of fight-of-way
,3
P 0 Box 3366
~ o~ West PaLm Beach, Florida 33402
~,,.,/'~ ~'F k~~~"'"~ Tel: 407/659-8000
JAN O 1995
est alm each ..... COUNTS
David Harden
City Manager
City of Delray Beach
100 N.W. First Avenue
Delray Beach, Florida 33444
Dear Mr. Harden:
It is the understanding of this office that many of the County's
municipalities have received a communication from the Office of County
CommissionerMary McCarty encouraging the municipalities to consider and
approve resolutions in support of the proposed 1-95/Airport Interconnect.
As the City most affected by the project, and in fact, by the general
operations of the Airport, I feel it is important for you to be aware of
the position of the City of West Palm Beach. In December 1991, the West
Palm Beach City Commission approved Resolution No. 227-91 in opposition
of the project. In short, the Commission felt, and still feels, that the
expenditure of over $60 million of public tax dollars is entirely
unwarranted and will have an adverse economic effect on the residential
tax base of the City. Over $16.5 million of the estimated $60 million
will be used to purchase/condemn additional residential properties in
the City further destroying viable residential neighborhoods to the east
of Palm Beach International Airport (PBIA).
Further, the citizens of this City see the proposed interconnect as
precedent to major expansion at the Airport to include expanded cargo
and international operations. Many of the neighborhoods in proximity to
the Airport do not feel that PBIA is an appropriate location for these
kinds of activities.
We, therefore, in the spirit of cooperation among communities in the
County, urge you not to support the proposed interconnect in any way.
Thank you for your support on this matter.
Sincerely,
Mayor of West Palm Beach
NMG/JLG/daw
cc: City Commission
City Administrator
County Commission
t'~ · -- [.B~,i_%.~7~//~:l~l West Palm Beach, Florida 33402
EVERYBODY
es °t alm each COUN
SPECIAL CENSUS 1~5
"The Ozchid Citq'
dan~a~y ~, ~995
Palm Beach County Municipalities:
The 1-95 interchange proposed to be built in the City of West Palm
Beach is another step in the continuing erosion of our city. I
plead to your civic pride and the sense that the destruction of
more neighborhoods in the county seat is a detriment to all of Palm
Beach County.
We do not need this interchange! What we do need is a second rail
for tri-rail, a modern and progressive intermodal transfer
facility, a county bus system that is second to none and greater
sensitivity to the destruction of our inner-city neighborhoods. The
airport has already destroyed the beautiful historic Hillcrest
neighborhood. Now they are destroying the beautiful Golfview
neighborhood. Next year it will be the neighborhoods under the
interchange.
Please help us in this fight to preserve our historic city that
just celebrated our centennial. Please do not support this
interchange!
Thanks in advance for your neighborliness. It won't be forgotten.
Sincerel, y,.,~/ /'
Howard Warshauer
President of the Commission
HW/ms
cc: Mayor
City Commission
City Administrator
Board of County Commission
County Administrator
Metropolitan Planning Organization
Neighborhood Associations
SUGGESTED LANGUAGE FOR RESOLUTIONS SUPPORTING THE
INTERSTATE 95/PBIA DIRECT CONNECT PROJECT
RESOLUTION OF THE BOARD OF [CITY/COUNTY/CHAMBER]
COMMISSIONERS, PALM BEACH COUNTY, FLORIDA,
SUPPORTING STATE OF FLORIDA DEPARTMENT OF
TRANSPORTATION, PROJECT NO. 93220-1465, BUILD
ALTERNATIVE 3A-2, INTERSTATE 95/PALM BEACH
INTERNATIONAL AIRPORT DIRECT CONNECTOR.
WHEREAS, Interstate 95 is the primary north/south surface transportation
corridor linking all coastal urban areas in Palm Beach, Martin, St. Lucie, Broward,
and Dade Counties; and
WHEREAS, the Florida State Department of Transportation (FDOT) has
conducted comprehensive studies, and determined that improvements to Interstate
95 and connecting roads, including a direct connector to Palm Beach International
Airport are necessary to accommodate existing and future vehicle traffic demand
along the Interstate 95 corridor; and
WHEREAS, FDOT cost estimates state that build Alternative 3A-2 is the
least costly to the taxpayers of Palm Beach County, saving county taxpayers an
estimated $11 million over other build alternatives; and
'¢~q-IEREAS, the Palm Beach County Metropolitan Planning Organization has
voted in favor of the Interstate 95/Palm Beach International' Airport Direct
Connector as part of its 5-year road improvement program; and
WHEREAS, the Board of [County/City/Chamber] Commissioners
finds that improvements to Interstate 95 and connecting roads, including a direct
connector to Palm Beach Intemational Airport, will ensure that Palm Beach County
residents and visitors will have access to, and continue to receive the benefits
associated with, efficient and convenient transportation for goods and people.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF PALM BEACH COUNTY, FLORIDA, that:
1. The Board of [County/City/Chamber] Commissioners support the Palm
Beach County long range transportation plan improvements to Interstate 95 with a
direct connector between Interstate 95 and the Palm Beach International Airport,
known as "Build Alternative 3A-2".
[ITY OF [IELAI:IY BERCH
DELRAY BEACH
~ lOO hl.W. 1st AVENUE · DELRAY BEACH, FLORIDA 33444 . 407/243-7000
AII-A.~ri~ Ci~/
1993
TO: Diane Dominguez, Director of Planning & Zoning
FROM: David T. Harden, City Manager~'ii~'
SUBJECT: 1-95 AIRPORT CONNECTOR
DATE: January 4, 1995
Please review the attached letter and back-up material from
Commissioner McCarty. I would like to have your department's
recommendation in order for the Commission to consider the
resolution requested by Commissioner McCarty at their January
17th meeting.
DTH:mld
Attachments
c: City Clerk
[:lTV JIF nELR IV BEIt[H
D.A,.EAC. CITY CLERK
~ C~
1993
~a~a~ 2~, ~995
Ben Watts, Secretary of Transportation
Florida Department of Transportation
605 Suwannee, MS 57
Tallahassee, Florida 32399-0450
Dear Mr. Watts:
Enclosed please find a copy of Resolution No. 5-95 supportin~ the
State of Florida Department of Transportation Project No.
93220-1465 to build Alternative 3A-2, Interstate 95/Palm Beach
International Airport Direct Connector.
This resolution was passed and adopted by the City Commission of
the City of Delray Beach, Florida, in regular session on January
17, 1995.
Your serious consideration is appreciated.
Sincerely,
Alison MacGregor Harry
City Clerk
AMH/sm
Enclosure
THE EFFORT ALWAYS MATTERS
Prin~ed on Recycled Paper
£1T¥ 13F EIELI:II:I¥ BEII£H
CITY CLERK
Ali. America C:ity
1993
January 24, 1995
Ms. Lisa Waters
Noise Abatement Officer
Building No. 846
Palm Beach International Airport
West Palm Beach, FL 33406-1491
Dear Ms. Waters:
Enclosed please find a copy of Resolution No. 5-95 supporting the
State of Florida Department of Transportation Project No. 93220-
1465 to build Alternative 3A-2, Interstate 95/Palm Beach Interna-
tional Airport Direct Connector.
This resolution was passed and adopted by the City Commission of
the City of Delray Beach, Florida, in regular session on January
17, 1995.
Your serious consideration is appreciated.
Sincerely,
Alison MacGreGor Harty
City Clerk
AMH/sm
Enclosure
THE EFFORT ALWAYS MATTERS
Pfinted on Recycled Paper
[IT¥ DF DELRR',' BERgH
CITY CLERK
100 N,W. 1st AVENUE · DELRAY BEACH, FLORIDA 33444 · 407/243-7000
ill4a~ca City
1993
J'anuar¥ 24, 1995
Mr. Randy Whitfield, Director
Palm Beach County Metropolitan Planning Organization
P.O. Box 21229
West Palm Beach, FL 33416-1229
Dear Mr. Whitfield:
Enclosed please find a copy of Resolution No. 5-95 supporting the
State of Florida Department of Transportation Project No.
93220-1465 to build Alternative 3A-2, Interstate 95/Palm Beach
International Airport Direct Connector.
This resolution was passed and adopted by the City Commission of
the City of Delray Beach, Florida, in regular session on January
17, 1995.
Your serious consideration is appreciated.
Sincerely,
Alison MacGregor Harry
City Clerk
AMH/sm
Enclosure
THE EFFORT ALWAYS MATTERS
Printed on Recycled Paper
[IT¥ DF DELRR¥ BERgH
.A ,EAc, CITY CLERK
100 N.W. 1st AVENUE · DELRAY BEACH, FLORIDA 33444 · 407/243-7000
~ll4m~a City
1993
January 24, 1995
Commissioner Maude Ford Lee
Board of County Commissioners
301 N. Olive Avenue
West Palm Beach, FL 33401
Dear Commissioner Lee:
Enclosed please find a copy of Resolution No. 5-95 supporting the
State of Florida Department of Transportation Project No.
93220-1465 to build Alternative 3A-2, Interstate 95/Palm Beach
International Airport Direct Connector.
This resolution was passed and adopted by the City Commission of
the City of Delray Beach, Florida, in regular session on January
17, 1995.
Your serious consideration is appreciated.
Sincerely,
Alison MacGregor Harry
City Clerk
AM~/sm
Enclosure
THE EFFORT ALWAYS MATTERS
Printed on Recycled Paper
£1TV DF [IELRRV BEII£H
?,,LV?,~A?, CITY CLERK ,ooN.w.,,tAvE,uE ·
1993
Commissioner Ken L. Foster
Vice Chairman
Board of County Commissioners
301 N. Olive Avenue
West Palm Beach, FL 33401
Dear Commissioner Foster:
Enclosed please find a copy of Resolution No. 5-95 supportin~ the
State of Florida Department of Transportation Project No.
93220-1465 to build Alternative 3A-2, Interstate 95/Palm Beach
International Airport Direct Connector.
This resolution was passed and adopted by the City Commission of
the City of Delray Beach, Florida, in regular session on January
17, 1995.
Your serious consideration is appreciated.
Sincerely,
Alison ~ac~re~or Harry
City Clerk
AMI-~/sm
Enclosure
THE EFFORT ALWAYS MATTERS
Printed on Recycled Paper
£1T¥ DF DELRR¥ BER£H
CITY CLERK
100 N.W. Ist AVENUE · DELRAY BEACH, FLORIDA 33444 · 407/243.7000
1993
~anua~ 2~, 1995
Commissioner Burt Aaronson
Board of County Commissioners
301 N. Olive Avenue
West Palm Beach, FL 33401
Dear Commissioner Aaronson:
Enclosed please find a copy of Resolution No. 5-95 supporting the
State of Florida Department of Transportation Project No.
93220-1465 to build Alternative 3A-2, Interstate 95/Palm Beach
International Airport Direct Connector.
This resolution was passed and adopted by the City Commission of
the City of Delray Beach, Florida, in regular session on January
17, 1995.
Your serious consideration is appreciated.
Sincerely,
Alison MacGregor Harry
City Clerk
AMH/sm
Enclosure
THE EFFORT ALWAYS MATTERS
Printed on Recycled Paper
I:IT¥ OF DELRR¥ BEI:I£H
CITY CLERK
o · , D ^ 100N.W. lstAVENUE · DELRAYBEACH, FLORIDA 33444 · 407/243-7000
~cb
1993
January 24, 1995
Commissioner Mary McCarty
Chair, Board of County Commissioners
301 N. Olive Avenue
West Palm Beach, FL 33401
Dear Commissioner McCarty:
Enclosed please find a copy of Resolution No. 5-95 supporting the
State of Florida Department of Transportation Project No.
93220-1465 to build Alternative 3A-2, Interstate 95/Palm Beach
International Airport Direct Connector.
This resolution was passed and adopted by the City Commission of
the City of Delray Beach, Florida, in regular session on January
17, 1995.
Your serious consideration is appreciated.
Sincerely,
Alison MacGregor Harry
City Clerk
AMH/sm
Enclosure
THE EFFORT ALWAYS MATTERS
Pfinted on Recycled Paper
£1T¥ DF DELRR¥ BERTH
CITY CLERK
o , , o ^ 100 N.W. 1st AVENUE · DELRAY BEACH, FLORIDA 33444 · 407/243-7000
~ne~ica C~
1993
January 24, 1995
Commissioner Warren H. Newell
Board of County Commissioners
301 N. Olive Avenue
West Palm Beach, FL 33401
Dear Commissioner Newell:
Enclosed please find a copy of Resolution No. 5-95 supporting the
State of Florida Department of Transportation Project No.
93220-1465 to build Alternative 3A-2, Interstate 95/Palm Beach
International Airport Direct Connector.
This resolution was passed and adopted by the City Commission of
the City of Delray Beach, Florida, in regular session on January
17, 1995.
Your serious consideration is appreciated.
Sincerely,
Alison MacGregor Harry
City Clerk
AM~/sm
Enclosure
THE EFFORT ALWAYS MATTERS
Printed on Recycled Paper
[lTV JIF i]ELRR¥ BERgH
CITY CLERK
, o ,, 100 N.W. 1st AVENUE · DELRAY BEACH, FLORIDA33444 · 407/243-7000
993
January' 24, 1995
Commissioner Carol A. Roberts
Board of County Commissioners
301 N. Olive Avenue
West Palm Beach, FL 33401
Dear Commissioner Roberts:
Enclosed please find a copy of Resolution No. 5-95 supporting the
State of Florida Department of Transportation Project No.
93220-1465 to build Alternative 3A-2, Interstate 95/Palm Beach
International Airport Direct Connector.
This resolution was passed and adopted by the City Commission of
the City of Delray Beach, Florida, in regular session on January
17, 1995.
Your serious consideration is appreciated.
Sincerely,
Alison MacGregor Harty
City Clerk
Enclosure
THE EFFORT ALWAYS MATTERS
Printed on Recycled Paper
CITY DF DELRR¥ BERgH
o. AY,~Ac. CITY CLERK ,OON.W.,.tAVENUE ·OELRA~.~O..~'OR,O~ ·~0~-~000
1993
January 24, 1995
Commissioner Karen T. Marcus
Board of County Commissioners
301 N. Olive Avenue
West Palm Beach, FL 33401
Dear Commissioner Marcus:
Enclosed please find a copy of Resolution No. 5-95 supporting the
State of Florida Department of Transportation Project No.
93220-1465 to build Alternative 3A-2, Interstate 95/Palm Beach
International Airport Direct Connector.
This resolution was passed and adopted by the City Commission of
the City of Delray Beach, Florida, in regular session on January
17, 1995.
Your serious consideration is appreciated.
Sincerely,
Alison Macgregor Harry
City Clerk
AMH/sm
Enclosure
THE EFFORT ALWAYS MATTERS
Pfinted on Recycled Paper