Res 38-76 RESOLUTION NO. 38-76
A REoOLUPION OF THE CITY COUN_IL OF THE'CITY OF DELRAY
BEACH, FLORIDA, AUTIIORIZING NEGOTIATION OF A CONTACT
TO COMPLETELY DEMOLISH WOOD FPJ~ME AND STUCCO STRUCTURE
AND REMOVE SAME, INCLUDING ANY FOUNDATIONS, SEPTIC
TANKS~ OR OTHEIi PIPING INCLUDED IN THE AREA OF THE
BUILDING; ALSO, DEMOLISH SWIMMING POOLS, WALLS AND
DECKING AND REMOVE SAME FROM SITE LOCATED AT NO. 2,
SOUTH OCEAN BOULEVARD~ DELP~Y BEACH, FLORIDA. ALL
AREAS TO BE FREE FROM ~TERIALS, AND BACKFILLED WITH
TOP SOIL TO A LEVEL OF EXISTING SIDEWALK. ALL WORK
TO BE IN COMPLIANCE WITH THE STIPULATIONS INDICATED ON
"REQUEST-FOR-QUOTATION'~ FO~d DATED JUNE 9~ 1976.
WHEREAS, it is -hhe recomme3dahJ.on of ~_he City Manager f. hat the Council,
ac[~ing by authority of provisions of Section 78 of the City's Charter, award
.~ contract to completely demolish wood frame and stucco structure and re-
move same, including any foundations, septic ta'nks, or other piping included
in the area of the building; also, demolish swiping pools~ walls and deck-
ing and remove same from site located at No. 2, South Ocean Boulevard,
Delray Beac]n~ Florida. Ail areas ~o be free from materials, and backfilied
with top soil ~o a level of existing sidewalk. Ail work to be in compliance
with the stipulations indicated on "Request-for-Quotation" form dated
June 9~ 1976.
WHEREAS, five quotations were received in the amounts of:
Bidder Calendar Days ~ount
Completed
George A. Lumsden, Inc. 30 $11,000.00
Fort Lauderdale, Fla.
Pipe-Rite Utilities Ltd., Inc. 60 14,999.00
Lake Worth, Fla.
Oneman Engineering 45 16,800.00
De!ray Beach, Fla.
Jay P. Callaway 60 17,900.00
Delray Beach, Fla.
Campbell Construction 30 23,930.00
Dciray Beach, Fla.
WHEREAS, the City Engineering Office certifies the three lowest quoted
prices to be reasonable and recommends that the City of Delray Beach enter
into a contract with the low bidder George A. Lumsden, Inc.~ to completely
demolish wood frame and stucco structure and remove same, including any
foundations, septic tanks, or other piping included in the area of the build-
ing; also, demolish swimming pools, walls and decking and remove same from
site loc0hed at No. 2, South Ocean Boulevard, Delray Beach, Florida. Ail
areas to be free from materials, and backfilled with top soil to a level of
existing sidewalk. Ail work to be in compliance with the stipulations indi-
cated on "Request-for-Quotation" form dated ~une 9, 1976, including proof of
ins~rance in amounts s'tipulated.
WHEREAS, it is the Cooncil's opinion that the award of this contract
would be in the best interest of the City,
SECIION 1 Tbah sa~ld contract to completely demolJ=h wood frame and
stucco structure and remove same, including any foun~.~,o~, septic tanks,
or other piping included in the area of the building; also, demolish swim-
ming pools, walls and decking and remove same from site located at No. 2
South Ocean Boulevard, Delray Beach, Florida. All areas to be free from
materials, and backfilled with top soil to a level of existing sidewalk.
All work to be in compliance with the stipulations indicated on "Request-for-
Quotation" form dated June 9, 1976.
SECTION 2. That it is Council's intention that plans be prepared and
construction commenced and ultimately complete the bathhouse and pavilion
mhd any other items required which the City is to maintain in accordance
with the reverter clause in the deed from the Gleason family.
SECTION 3. That this improvement shall be funded with money from
current budgeted funds.
PASSED AND ADOPTED in regular s. ession on this the 12th day of
July, 1976.
- 2 -